information facts

BEST PRACTICE EXAMPLES WASTE LIP – LOCAL INVESTMENT PROGRAMMES MAY 2011

Photograph: E.ON

High pressure in the boiler at E.ON

in Norrköping

Sydkraft Öst Värme AB (now E.ON) supplemented its old heating boiler with a CFB boiler. It generates more electricity in waste incineration than ordinary boilers due to a higher steam pressure of 65 bar. This action has reduced the use of fossil fuels and lowered carbon dioxide emissions.

In 2001–2002 Sydkraft Öst Värme AB (now E.ON) expanded its production of electricity with support from the Local Investment Programme (LIP). The company started using a new heating boiler in December 2002. It is a circulating fluidised bed (CFB) boiler. The boiler utilises separated, combustible household and business waste. Following a reconstruction, the turbine output was 11 MW, compared with 8 MW in the application. The steam is used by a nearby ethanol factory and for the production of district heating. The electricity is supplied to the municipal grid.

This measure is a good example of how it is possible to reduce the use of fossil fuels and emissions of climate-changing gases by using new, better technology for the production of electricity and heat.

Positive environmental and economic imPacts

• Reduced emissions of carbon dioxide (16 000 tonnes/year) and nitrogen oxides (13 tonnes/year).

• Reduced emissions of sulphur oxides (36 tonnes/year).

• Just over 10 000 tonnes of coal a year have been replaced by fuel from waste. • Cleaner ash due to separated and processed waste.

(2)

swedish ePa SE-106 48 Stockholm. Visiting address: Stockholm – Valhallavägen 195, Östersund – Forskarens väg 5 hus Ub, Kiruna – Kaserngatan 14.

Tel: +46 10 698 10 00, fax: +46 10 698 10 99, e-mail: registrator@swedishepa.se Internet: www.swedishepa.se orders Ordertel: +46 8 505 933 40,

orderfax: +46 8 505 933 99, e-mail: natur@cm.se Address: CM Gruppen, Box 110 93, SE-161 11 Bromma. Internet: www.swedishepa.se/publications

information facts

BEST PRACTICE EXAMPLES WASTE LIP – LOCAL INVESTMENT PROGRAMMES MAY 2011 ISBN: 978-91-620-8611-4

imPlementation

The CFB boiler was installed at Händelöverket in Norrköping. Alongside the boiler, the company built a turbine for electricity production and outside of the LIP support built a fuel preparation facility. The concept of using high steam pressure in waste incineration had never previously been tested in Sweden. When it was installed, the plant in Norrköping was one of only ten in the world.

Potential and future benefit

Developing and testing new technology is an important part of environment development. Using biofuels which otherwise do not have any natural alternative use, for example for digestion, is both economically advantageous and beneficial to the environment. District heating systems reduce air pollution locally, make it possible to utilise waste heat from other activities and produce combined heat and power. The prospects for expanding district heating are improving as urbanisa-tion advances.

WHY BEST PRACTICE

Compared with a traditional waste heat boiler using grate technology, CFB incineration offers many good characteristics – high fuel flexibility, the possibility of higher steam data, higher yield of electricity and a lower investment cost. The project has led to reduced emissions of carbon dioxide and other climate-changing gases. E.ON has gone further with the concept since the LIP project was completed. The company is investing in a new CFB boiler and larger turbines in order to be able to produce more steam, electricity and district heating.

FOR FURTHER INFORMATION Contact

Romel Makdessi, E.ON

Telephone: +46 (0)730-49 93 18 E-mail: romel.makdessi@eon.se Contractor

CFB boiler: Metso Turbine: Siemens

Further information on Best Practice www.swedishepa.se/bestpractice www.naturvardsverket.se/mir FACTS

LIP Norrköping 2001 Action 5

Environmental investment: SEK 16.2m Grant: SEK 4.5m

References

Related documents

Leaders in the Information and Communication Technology (ICT) department at NUR expressed interest in becoming a regional and national leader in e-waste management, so

In this section we consider the interaction between an ad- versary and the monitor from a time chase point of view, i.e., what happens first: the monitor detects the

Enligt Spendrups konsumentkontakt (pers. Dessutom antog vi, i linje med föregående rapport, att det krävs 1,25 kg korn för att tillverka 1 kg malt. Baserat på dessa siffror

Majoriteten av tidigare forskning behandlar TPB på antingen yngre eller äldre individer, och inte ofta i forskning där yngre och äldres entreprenöriella intention studeras i

High temperature corrosion in a biomass-fired power boiler Reducing furnace wall corrosion in a waste wood-fired power plant with advanced steam data..

P4 16Mo3 2 ml HNO 3 and 98 ml alcohol The sample was swabbed for 10 seconds. Figure 19 shows LOM results of the tube samples. P4, Alloy 625 coated tube sample shows

Hervé Corvellec, María José Zapata Campos, Patrik Zapata (2013) Infrastructures, lock-in, and sustainable urban development: the case of waste incineration in the Göteborg

Due to the rail pressure fast transients, the available pressure can vary significantly from the actual pressure at the injector: The given injection ontime