BEST PRACTICE EXAMPLES ENERGY EFFICIENCY LIP – LOCAL INVESTMENT PROGRAMMES MAY 2011

Photograph: Emballator

Energy-smart action at emballator

in Mellerud

Emballator Plast AB in Mellerud is saving energy and money by utilising waste heat from production. This measure has also led to reduced carbon dioxide emissions and a better working environment.

The improvement in energy efficiency at Emballator is a good example of how a relatively small measure can save energy and money, reduce emissions and pro-vide a better working environment.

In 2001, Emballator installed six water-borne fan air heaters, known as Airo-temps, for heating and ventilation in the factory. In addition, the recycling of waste heat was expanded. The aim was to save energy, stop using oil and improve the working environment for the employees. The measure was implemented with support from the Local Investment Programme (LIP).

Positive environmental and economic imPacts

• Reduced emissions of carbon dioxide, 40.5 tonnes/year. • Reduced emissions of sulphur dioxides, 15 kg/year. • Reduced use of electricity, 80 MWh/year.

• Reduced consumption of oil, 15 m3/year. • Better working environment.

(2)

swedish ePa SE-106 48 Stockholm. Visiting address: Stockholm – Valhallavägen 195, Östersund – Forskarens väg 5 hus Ub, Kiruna – Kaserngatan 14. Tel: +46 10 698 10 00, fax: +46 10 698 10 99, e-mail: registrator@swedishepa.se Internet: www.swedishepa.se orders Ordertel: +46 8 505 933 40, orderfax: +46 8 505 933 99, e-mail: natur@cm.se Address: CM Gruppen, Box 110 93, SE-161 11 Bromma. Internet: www.swedishepa.se/publications

information facts

BEST PRACTICE EXAMPLES ENERGY EFFICIENCY LIP – LOCAL INVESTMENT PROGRAMMES MAY 2011 ISBN: 978-91-620-8615-2

imPlementation

The company installed six modern wastewater-heated Airotemps and new control and regulating equipment. At the same time the old oil-fired boiler and the oil tank were removed, as well as two old Airotemps that were operated with direct-acting electricity. The wastewater-heated Airotemps heat warehouse premises up to 100 square metres in size that were previously unheated. This provides a better working environment.

One lesson from the project was that the cooperation between the municipality and Emballator was necessary to coordinate the measures, but also that such a “small” measure must not become bureaucratic and take too long.

Potential and future benefit

Ventilation by fans is a basic technology that consumes a relatively large propor- tion of a country’s energy budget. Measures that link energy savings to ventila-tion fans are of potential global benefit. The fact that this measure is a relatively simple technical solution increases the prospects of it being disseminated. WhY BEST PRACTICE

Emballator has continued to work on the energy issues since the LIP project ended. All heat is now supplied through the Airotemps. 700 square metres of roof and two high-speed curtain doors have been insulated and lighting control has been installed with a motion switch. The company has now introduced heat exchange and heat recovery in the office section. The project has led to positive environmental effects with reduced air emissions, has saved energy and has contributed to a better working environment.

FOR FURThER INFORMATION Contact Jan-Olov Johansson Telephone: +46 (0)530-183 48 E-mail: jan-olov.johansson@mellerud.se Contractor Rörtjänst i Mellerud Elinsta

Bertil Johansson Bygg AB VIAB

Further information on Best Practice www.swedishepa.se/bestpractice www.naturvardsverket.se/mir FACTS

LIP Mellerud 2001 Action E

Environmental investment: SEK 452 839 Grant: SEK 131 000

References

Related documents

Linköping studies in science and

Figure 6 The specific final energy demand, excluding household electricity, for the reference buildings and the heated atrium building design under different scenarios of

In our case, the energy audit consisted of a study of how much energy is used by the different buildings and facilities, and then of how much the university pays for the

When a conventional industrial motor is compared with high efficient motors, it is inferred that 90 percent of the conventional industrial motors cannot adjust their operation to

In this section it has been considered different flow rates for the cold water, maintaining all the other parameters as in the original industrial case and parallel heat

The resulting images from the segmentation and the transformation matrix are the output of the camera component and are the input to the visualization component... network

The objective was to find out if there is a way to explain the temperature corrected energy use of the Swedish building stock by an equation consisting of energy

his section presents all the results obtained from simulations and the physical tests; including comparisons between different airbag models, identifying