Item Metadata
Collection: Glover (Robert E.) Papers Author: Glover, Robert E. (Robert Ellsworth) Title: 1960, copies
Date: 1960
File Name: WREG02910.pdf Date Transcribed: December 2020 Editors: Trista Barker
Transcription Platform: Microsoft Word BEGIN TRANSCRIPTION JAN - JUNE 1960 AT HOME: 1/1, 3, 14, 16-17, 23-24, 31, 2/13-14, 20-22, 3/5, 11-12, 19, 3/27 USBR: 1/11-12, 15-19, 3/21, 23, 5/10-12, 16-19, 6/1-2, 28-30 USGS: 1/4-8, 11, 13, 15, 18-22, 25-26, 2/1-4, 8-12, 23-26, 3/1-4, 3/9-10, 14-18, 22, 24-25, 28-4/1, 4-8, 11-15, 18-22, 25-29, 5/2-6, 9, 20, 23, 5/31, 6/3, 6-10, 13-17, 20-24, 27 Books Returned 5/9, 6/22+23 CSU 1/2(1/2), 9, 14, 3/2, 19, 27-28, 4/12, 20, 5/13 BECHTEL: 2/1-3, 5-6, 8-11, 3/8-12, 14-15, 21, 24-28, 31-6/4 (BUCHTEL?) NO ENTRIES: 2/7, 27-28, 3-13, 20, 26, 4/9-10, 16-17, 23-24, 30-5/1, 7, 15, 6/5, 11-12, 25 1/10 BILL CALLED TO SAY “KERRY JEAN” HAD BEEN BORN
1/13 RENEWED DRIVERS LIC (“CONSUMED ENTIRE MORNING”)
1/10-14 JOANN DEAL VISITING - 1/14, SNOW, TOUCH OFF(S)-STAYED HOME 1/22 BIRTHDAY CAKE IN EVENING
1/26-28 WENT TO SAN FRANCISCO 1/29-30 SPENT W/ BILL, JEAN, KERRY
3/5 COMPLETED AND MAILED STATE/FED INCOME TAXES 3/6-7 TO SAN FRANCISCO - FOR BECHTEL
3/7 SPENT OVERNIGHT W/ BILL AND FAMILY IN SAN CARLOS 3/8 FLIGHT HOME
3/11 SORE THROAT
4/2 TO TWON TO GET BOOK ON DIFFUSION BY CRANK 4/3 MCNEIL LAKE TO FISH W/ KIM AND R STONE
5/8 FIELD TRIP W/ BIRD CLUB @ RED ROCKS
5/14 FILLED OUT FORM 57, GOT HAIRCUT, MOWED LAWN 5/22 MCNEIL LAKE W/ KIM AND RAY WINGER
5/24 SPECIAL SUPPER FOR MARJORIE
5/28 MORRY BROUGHT KATHY AND KAREN FOR VISIT - 5/30
6/19 MCNEIL LAKE W/ OLLIE PARKER AND HOWARD HUNTER: 6/18: ECHO LAKE 6/26 SWIMMING @ ENGLEWOOD W/ MARJORIE, GINGER AND KIM
6/30 FORT COLLINS W/ JOHN MALETIC
1960 ADDENDUM 1/2 WORKED 4 HRS FOR CSU ON PROJECT 1/2
1/4-5 WORKED 8 HRS EACH DAY - USGS - STREAM DISPERSION REPORT 1/6-7 WORKED 7 HRS EACH DAY - USGS - STREAM DISPERSION REPORT 1/9 WORKED 8 HRS - USGS - STREAM DISPERSION REPORT
1/11 WORKED 1 HR - USBR - RETURN FLOW COMPUTATIONS; 3 HRS - USGS - REVISION OF DISPERSION REPORT; 4 HRS - USBR - GLEN CANYON DAM
1/12 WORKED ALL DAY - USBR - GLEN CANYON DAM
1/13 WORKED 4 HRS - USGS - STREAM DISPERSION REPORT IN AFTERNOON 1/15 WORKED ALL DAY - USGS - ON DISPERSION REPORT
1/16-17 AT HOME WITH THE FLU
1/18-22 WORKED 8 HRS EA DAY - USGS - STREAM DISPERSION REPORT - HAD BIRTHDAY CAKE IN EVENING OF THE 22nd WITH CAROL, MARGIE, GINGER, KIM
1/25 WORKED ALL DAY - USGS - ON DISPERSION REPORT
1/26 WORKED 4 HRS - USGS - ON DISPERSION REPORT: FLIGHT TO SAN FRANCISCO LEFT AT 5:30 PM - STAYED AT SHERATON HOTEL - EXPENSES $5.95 (TAXI, TIP, ETC) 1/27 REVIEWED DESIGNS OF THE JUNCTION AND CAMINO DAMS WITH
SEVERAL AT BECHTEL (BUCHTEL?) OFFICES - TAXI TO OFFICE 75¢ 1/28 COMPLETED SOME CHECK COMPUTATIONS ON THE JUNCTION AND CAMINO DAMS IN AM; IN THE AFTERNOON HAD A SESSION WITH BECHTEL ENGINEERS ON ARCH DAM STRESS ANALYSIS. CHECKED OUT
OF THE HOTEL - 12.75 PER DAY - BILL TOOK ME TO JONES HOME IN SAN CARLOS 1/29 SPENT LAST NIGHT AND TODAY WITH BILL, JEAN AND KERRY
1/30 BILL TOOK ME TO THE AIRPORT IN SAN FRANCISO, CAROL PICKED ME UP IN DENVER
2/1-4 WORKED 8 HRS EACH DAY - USGS - REVISION OF STREAM DIVERSION REPORT 2/1-3 WORKD EVENINGS FOR BECHTEL (2/1 - 1 HRS, 2/2 - 3 HRS, 2/3 - 2 HRS) (AT HOME) 2/5 WORKED 12 HRS FOR BECHTEL - COMPLETED WORK ON JUNCTION DAM AND BEGAN WORK ON CAMINO DAM
2/8 WORKED 8 HRS - USGS - DISPERSION REPORT. WORKED 4 HRS. BECHTEL - EVENING
2/9-11 WORKED 8 HRS EACH DAY ON REVISION OF DISPERSION REPORT 2/9-11 WORKED 3 HRS EACH EVENING FOR BECHTEL
2/12 WORKED 8 HRS - USGS - 4 HRS DISPERSION REPORT, 4 HRS SEDIMENT TRANSPORT
2/15-18 WORKED 8 HRS EACH DAY FOR US BRON SALINE WATER 2/19 WORKED 8 HRS FOR USBR ON BAFFINS BAY SOILS
2/23-26 WORKED ALL DAY AT USGS ON THE STREAM DISPERSION REPORT 2/29-3/1 WORKED ALL DAY BOTH DAYS - USGS - STREAM DISPERSION REPORT 3/2 4 HRS - USGS. STREAM DISPERSION REPORT. 4 HRS - CSU - PROJECT 117, ATTENDED A CONFERENCE WITH THE ADVISORY COMMITTE IN
BLDG 25, DENVER FEDERAL CENTER
3/3-4 WORKED ALL DAY BOTH DAYS - USGS TREAM DISPERSION REPORT 3/5 COMPLETED AND MAILED FEDERAL AND STATE INCOME TAX REPORTS 3/6 WENT TO SAN FRANCISCO TO DISCUSS DESIGNS FOR CAMINO DAM WITH BUCHTEL DESIGNERS
3/7 SPENT DAY AT BUCHTEL OFFICES (24 FRONT ST. SF) WENT TO SAN CARLOS WITH BILL - SPENT THE NIGHT WITH BILL AND HIS FAMILY
3/8 BILL TOOK ME TO THE AIRPORT IN SAN FRANCISCO - CAROL MET ME IN DENVER AND BROUGHT ME HOME: WORKED 2 HRS FOR BUCHTEL IN PREPARATION FOR A REVIEW OF AMPLIFIED DESIGN TO BE SENT LATER
3/9-10 WORKED ALL DAY BOTH DAYS - USGS - STREAM DISPERSION REPORT 3/9-10 WORKED 3 HRS - BUCHTEL - EVENING; 3/10 WORKED 1 HR - BUCHTEL 3/11 AT HOME WITH A SORE THROAT; WORKED 11 HRS FOR BUCHTEL 3/12 WORKED 9 HRS FOR BUCHTEL
3/14-18 8 HRS EACH DAY - USGS ON STREAM DISPERSION REPORT 3/14-15 WORKED 11 HR EACH EVENING FOR BUCHTEL
3/17 MR. WADDELL STARTED CHECKS ON COMPUTATIONS OF STREAM DISPERSION REPORT
3/19 WORK 1 HR - CSU - ON PROJECT 112
3/21 WORKED 2 HRS - USBR - GLEN CANYON DAM, 6 HRS - USBR - DRAINAGE AND GROUNDWATER
3/22 WORKED 4 HRS - USGS - STREAM DISPERSION; 4 HRS - USGS - BANK STORAGE/STREAM FLOW
3/23 WORKED ALL DAY FOR US BRON DRAINAGE AND GROUNDWATER
3/24 WORKED 4 HRS - USGS - STREAM DISPERSION; 4 HRS - USGS - BANK STORAGE AND STREAM GLOW
3/25 WORKED ALL DAY - USGS - ON SEDIMENT TRANSPORT
3/28 SPENT DAY AT FT FOLLINS DISCUSSING PROPOSED EXPERIMENT - THEY WILL MAKE AN ESTIMATE AND SEND IT TO USGS IN ABOUT A WEEK - WORK DONE FOR USGS SEDIMENT TRANSPORT
3/29-31 WORKED ALL DAY EACH DAY - USGS - ON BANK STORAGE AND STREAM FLOW 1960
ADDENDUM
4/1 WORKED 8 HRS - USGS - ON BANK STORAGE AND STREAM FLOW 4/4-7 WORKED 8 HRS EA DAY - USGS - BANK STORAGE AND STREAM FLOW 4/8 4 HRS - USGS - STREAM DISPERSION, 4 HRS - USGS - SEDIMENT TRANSPORT VICE PRESIDENT OF BECKMAN INSTRUMENTS (CA), CALLED ABOUT ROTARY STILL
4/11 7 HRS - USGS - STREAM DISPERSION; 1 HR - USBR - SALINE WATER 4/12 6 HRS - USGS - STREAM DISPERSION; 2 HRS - USBR - SALINE WATERS 3 HRS - CSU PROJECT 112 IN THE EVENING
4/13-14 8 HRS EA DAY - USGS - STREAM DISPERSION, WENT TO USBR LABORATORY TO SEE SPECTROGRAPH
4/15 WORKED 8 HRS - USGS - SEDIMENT TRANSPORT
4/18-22 WORKED ALL DAY EACH DAY - USGS - ON SEDIMENT MOVEMENT 4/19 BUREAU MEMO ON DEPLETION OF MADDER CREEK FLOW PLAN 4/20 2 HRS - EVENING FOR CSU ON PROJECT 112 - SENT REVISED SHEETS FOR REPORT ON STORAGE IN RIVER VALLEY SEDIMENTS TO BITTINGER 4/25-29 WORKED ALL DAY EACH DAY - USGS - ON SEDIMENT MOVEMENT - MR GLENN N VAWTER BEGAN CHECKING COMPUTATIONS TODAY
5/2-3 WORKED ALL DAY EACH DAY - USGS - ON SEDIMENT TRANSPORTATION - TEXT GIVEN TO MARYANN TO BE TYPED AS A ROUGH DRAFT
5/4-6 WORKED ALL DAY EACH DAY - USGS - ON BANK STORAGE AND STREAM FLOW 5/9 WORKED ALL DAY - USGS - BANK STORAGE AND STREAM FLOW - RECCIUGDA - CALL TO SAY PAYMENTS TO ME HAD BEEN RIGHT - FIGURE USGS FORM 50 FOR ANNUAL RATE IS IN ERROR AND WILL BE CORRECTED
5/10-12 WORKED ALL DAY EACH DAY - USBR - ON SALINE WATER - 5/12 FARWELL FUNCTION FOR MARYANN AT THE COPPER KITCHEN
5/13 WENT TO FT COLLINS BY BUS - DISCUSSED THE POSSIBILITY OF WORKING FOR ARS ON RECHARGE OF GROUND WATER - BUS MEMO 5/16 WORKED 4 HRS - USBR - SALINE WATER, 4 HRS - USBR - DRAINAGE AND GROUNDWATER
5/17-19 8 HRS - USBR - (EACH DAY) ON DRAINAGE AND GROUNDWATER 5/20 8 HRS - USGS - BANK STORAGE AND STREAM FLOW
5/21 WORKED 9 HRS FOR BECHTEL ON CAMINO DAM REVIEW 5/23 WORKED 8 HRS FOR USGS ON STREAM DISPERSION 5/24-26 SPENT 12 HRS FOR BECHTEL ON CAMINO DAM REVIEW
5/27 WORKED 11 HRS - BECHTEL - DAMINO DAM DESIGN; 5/28 5 HRS FOR BECHTEL 5/31 8 HRS - USGS - BANK STORAGE AND STREAM FLOW; 3 HRS - BECHTEL (EVENING) 6/1 8 HRS - USBR - IN WATER RESOURCES; 4 HRS - BECHTEL (EVENING)
6/2 8 HRS - USBR - DRAINAGE AND GROUNDWATER; 3 HRS BECHTEL (EVENING) 6/3 WORKED ALL DAY FOR USGS - BANK STORAGE AND STREAM FLOW;
WORKED 3 HRS FOR BECHTEL IN THE EVENING
6/4 WORKED 3 HRS FOR BECHTEL - REPORT MAILED TO BECHTEL
6/6-10 WORKED ALL DAY EACH DAY - USGS - BANK STORAGE AND STREAM FLOW 6/13-17 WORKED ALL DAY EACH DAY - USGS - ON STREAM DISPERSION
6/18 WENT FISHING AT ECHO LAKE WITH OLLIE PARKER AND HOWARD HUNTER 6/20-22 WORKED 8 HRS EACH DAY - USGS - STREAM DISPERSION
6/22 REPORT AND FIGURES ON STREAM DISPERSION FORWARDED TO WASHINGTON TODAY BY CERTIFIED MAIL
6/23-24 WORKED 8 HRS BOTH DAYS - USGS - (NO PROJECT MENTIONED) 6/27 WORKED ALL DAY FOR USGS - NO PROJECT MENTIONED
6/28-29 WORKED ALL DAY EACH DAY - USBR - ON BRUFFIN BAY SOILS
6/30 TO FT COLLINS - CONFERENCE - PROBLEM OF ION EXCHANGE - SHADEHILL SOILS
7/1 WORKED 4 HRS - USGS - ANSWERING REQUESTS AND CORRESPONDENCE ON BANK STORAGE AND STREAM FLOW
7/5 TO FEDERAL CENTER TO SIGN REPORTS - NOT READY - NO WORK - RETURNED HOME
7/7 WORKED 7 HRS - USGS; 4 HRS ON TALLAHASSEE, 3 HRS ON STREAM DISPERSION 7/11 NO WORK - TALKED TO GILDERSLEEVE ABOUT REPORT ON GROUNDWATER RESERVOIRS IN STREAM VALLEYS - WROTE TO BITTINGER IN EVENING 7/12 WORKED ON PAPER FOR AG ENGINEERS - TALKED TO MR. BILLINGTON ABOUT BARLAKE LOSSES - HE SAYS THEY USED TO BE 35 AF (ACRE FEET?) PER DAY - IN LAST 2 YEARS THIS HAS GONE UP TO 80 AF PER DAY
THEY SUSPECT DETERGENTS - THIS IS FOR A FULL RESERVOIR AND INCLUDES EVAPORATION LOSS - AT THE LOWEST LEVEL THE LOSSES WERE SMALL 7/13-14 AT HOME BOTH DAYS - WORKED ON PAPER FOR AG ENGINEERS 7/18 NO WORK - SPENT DAY AT FEDERAL CENTER CHECKING FORMULAS WITH LEEDUMM RAY WINGER, BILL, TIM. THEY ARE TO APPEAR IN PAPERS 7/21 FINISHED PAPER AND GOT BLUE-LINE PRINT - TO FEDERAL CENTER TO PICK UP CHECK
7/26 MEETING AT STATE SERVICES/2LOG ON GROUNDWATER - 2 CSU STUDENTS WERE THERE
7/27 WORKED 4 HRS - USGS - IN THE MORNING JULY-SEPT1960
AT HOME: 7/6, 8, 11-14, 16, 22-23, 28-29, 31, 8/1-9, 20-21, 27, 9/4-5 9/10, 24
BUR REC: 7/5, 8/10-12, 28, 9/19-23, 26-30 USGS: 7/1, 5, 7, 27, 8/23
CSU: 8/14-15 (ARS), 26 (ARS), 29-9/2 [ARS], 9/6-7 (ARS), 9/8-9(ARS), 12-16 [ARS] BOOKS RETURNED: 7/1, 9/26, 29
7/13-14 WORKED ON PAPER FOR AG ENGINEERS - NO ENTRIES: 7/2, 9/17
7/3 WENT TO CHURCH W/ GINGER - SWIMMING @ WHITE SANDS W/ MARJORIE GINGER AND KIM
7/4 AM LEGION CELEBRATION W/ CAROL, MARJORIE, GINGER, KIM, BILL MINTER
7/9 MCNEIL LAKE W/ KIM AND BILL MINTER
7/10 WHITE SANDS W/ CAROL, MARJORIE, GINGER AND KIM 7/15 DENTIST - 7/19 FOR IMPRESSION FOR PLATES - ALSO 7/20-21 7/17 MCNEIL LAKE W/ STONE
7/18 DAY @ FEDERAL CENTER CHECKING FORMULAS - NO WORK 7/21 FEDERAL CENTER TO PICK UP CHECK
7/24 WHITE SANDS W/ MARJORIE, GINGER AND KIM (EVE: BMINTER - SLIDES) 7/25 PICKED UP PLATES @ DENTIST
7/26 MEETING @ STATES SVCS BLDG ON GROUNDWATER 7/30 FISHING @ MCNEIL LAKE W/ OLLIE PARKER
7/30 MARK W BORN TO MORRY AND VIRGINIA GLOVER 7/31 WM MINTER FOR DINNER
8/2-9 WORKED ON PAPER FOR WESTERN RESOURCES CONFERENCE 8/7 SWIMMING @ WHITESANDS - MR MINTER TO SUPPER
8/13 MCNEIL LAKE W/ LOUIS PULS AND LEE DUMM 8/16 FLIGHT TO FRESNO (ARS) - 8/19
8/20 PREPARED TALK TO BE GIVEN IN BOULDER ON 8/24 (WES. RES. CONF) 8/22 GINGER TO SWEDISH HOSPITAL - OPERATED ON FOR APPENDICITIS 8/24-25 WESTERN RESOURCES CONFERENCE IN BOULDER
8/27 VISITED GINGER IN HOSPITAL
8/28 MCNEIL LAKE W/ OLLIE PARKER AND KIM - OLLIE PARKER’S BASS WEIGHED 4 POUNDS
9/3 FISHING W/ HOWARD HUNTER AND OLLIE PARKER ON EAGLE RIVER MINTURN
9/5 WORKED ON PAPER FOR A.S.A.E. 9/7 GINGER AND KIM BACK TO SCHOOL
9/11 MCNEIL LAKE W/ STONE AND KIM
9/18 CHURCH IN MORNING, BIRD CLUB HIKE (PM) @ MARSTON LAKE 9/25 WENT WITH BIRD CLUB TO MILE HI LAKES AREA
1960 ADDENDUM
8/1 WENT TO THE LIBRARY TO STUDY BULLETINS BY L. CARPENTER
8/2-4 WORKED ON PAPER FOR WESTERN RESOURCES CONFERENCE IN AUGUST 8/5 FINISH PAPER FOR WESTERN RESOURCES CONFERENCE - CALLED
DR. CHAMBERLAIN IN TO TELL HIM ABOUT PAPER - IN THE EVENING COPIED MAPS AND PICTURES ON SLIDES FOR BIRD CLUB
8/10 WORKED ALL DAY - USBR FOR DRAINAGE AND GROUNDWATER 8/11-12 WORKED ALL DAY BOTH DAYS - USBR - PROBLEM OF DRAINS ON A SLOPE
8/14 TOOK BUS TO FT. COLLINS - STAYED AT ARMSTRONG HOTEL - DR. CHAMBERLAIN SUGGESTED CALLING PROF MORRIS GARNSEY @ BOULDER, CO ABOUT MEETING ON AUGUST 24TH - EXPENSES $4.37 8/15 TO A.R.S OFFICES AT FT COLLINS - GAVE STATEMENTS ON EMPLOYMENT, RETIREMENT, DEPENDENTS - WORKED ALL DAY FOR ARS
8/16 WENT IN GOVERNMENT AUTO TO DENVER TO TAKE FLIGHT TO SAN FRANCISCO 2MD F;OGJT TO FRESNO - ROOMED AT HACIENDA HOTEL IN FRESNO - WORKED ALL DAY FOR ARS - ROUND TRIP FLIGHT TICKET $173.50
8/17 VISITED TEST PILOTS (WOODVILLE, WARREN, LIMAS, JUNIO, HURON, CANTUA - WORKED ALL DAY FOR A.R.S. - TOOK PHOTOS
8/18 SPENT THE DAY IN FRESNO OFFICE OUTLINING STUDIES TO BE MADE ON ANALYSES OF RECHARGE - WORKED ALL DAY FOR ARS - EXP
8/19 SPENT DAY AT FRESNO OFFICE - CONTINUED TECHNICAL DISCUSSION - AT FRESNO AIRPORT - FLEW TO DENVER VIA L.A. - SPENT 8 HRS - ARS - EXP. $3.55
8/20 GOT REPAIRED PROJECTOR - PREPARED NOTES FOR TALK ON GROUND WATER/SURFACE WATER RELATIONSHIP AT BOULDER AUGUST 24TH 8/22 4 HRS - USBR - AM; 4 HRS - USGS - IN AFTERNOON (NO PROJECT NAMED) TURNED IN TRANSPORTATION REQUESTS - GINGER HOSPITALIZED - APPENDICITIS
8/24 GAVE TALK ON SURFACE WATER/GROUNDWATER RELATIONSHIP AT THE WESTERN RESOURCES CONFERENCE MEETING IN BOULDER
8/25 ATTENDED WESTERN RESOURCES CONFERENCE IN BOULDERS GW MEETING
8/27 AT HOME - MADE ILLUSTRATIONS FOR PAPER ON GROUNDWATER/ SURFACE WATER RELATIONSHIPS - GOT COLOR PRINTS OF CA RECHARGE AREAS - SAW GINGER - HOSPITAL
8/29 TO FEDERAL CENTER TO GET FORMS - CHIEF ENGINEER WILL SEND LETTER - WORKED 8 HRS FOR ARS - REMAINDER OF AM, AFTERNOON AND EVENING
8/30 8 HRS - ARS - SENT AN ANALYSES FOR RECTANGULAR RECHARGE PLOT 8/31-9/2 WORKED 8 HRS EACH DAY FOR THE ARS
9/5 AT HOME - WORKED ON PAPER ON “MATHEMATICAL MODELS IN DRAINAGE DESIGN” FOR THE ASAE
9/6-9 WORKED 8 HRS EACH DAY FOR THE ARS 9/12 WORKED 8 HRS FOR ARS
9/13 WORKED 4 HRS FOR ARS - DISCUSSED POSSIBLE TRANSFER OF
EMPLOYMENT TO USBR - WILL COMPLETE THE ACTION POSSIBLY NEXT WEEK
9/14-9/16 WORKED 8 HRS EACH DAY FOR ARS
9/19 4 HRS - USBR - FOR WALT PRICE; 4 HRS - USBR - SALINE WATER -
ENTERED ON DUTY AT THE US BUREAU OF RECLAMATION THIS MORNING 9/20 WORKED 8 HRS - USBR - SALINE WATER
9/21 2 HRS - USBR - SALINE WATER; 6 HRS - USBR - DRAINAGE AND GROUNDWATER 9/22-23 8 HRS BOTH DAYS - USBR - ON DRAINAGE AND GROUNDWATER
9/26-27 WORKED ALL DAY BOTH DAYS - USBR - DRAINAGE AND GROUNDWATER
9/28-29 WORKED ALL DAY BOTH DAYS - USBR - DRAINAGE AND GROUNDWATER
9/30 WORKED ALL DAY - USBR - EVAPORATION SUPPRESSION 10/1 TO LIBRARY - GOT COPIES OF SPRINKLER PAPER O CHECK AND GROUNDWATER PAPER
10/2 CHECKED BITTINGER FORMULAS FOR TRAVELING SPRINKLER PRECIPITATION - SENT COMPUTATIONS ON SPRINKLERS AND GROUNDWATER [illegible] BACK
10/3 8 HRS - USBR - EVAPORATION SUPPRESSION; REPLACED COOLING OF CONCRETE DRAINS - LIBRARY SAYS NOT RETURNED - GAVE [illegible] TO LIBRARY
10/4 WORKED ALL DAY - USBR - EVAPORATION SUPPRESSION
10/5 WORKED ALL DAY - USBR - ON BAFFINS BAY FOR JOHN MALETIC
10/6 2 HRS - USBR - DRAINAGE AND GW AMT; 6 HRS - USBR - EVAPORATION SUPPRESSION
10/7 3 HRS - USBR - TEXAS BASIN; 2 HRS - USBR - DRAINAGE AND GW; 4 HRS - USBR - EVAPORATION SUPPRESSION
10/11 8 HRS - USGS - FLOW DISPERSION IN GRANULAR MEDIA - COOPER’S PROBLEM
10/12 5 HRS - USGS - COOPER’S PROBLEM; 3 HRS - USBR - EVAPORATION SUPPRESSION
10/13 8 HRS - USBR - EVAPORATION SUPPRESSION 10/14 3 HRS - USBR - WENT HOME WITH THE FLU
10/17-18 WORKED ALL DAY BOTH DAYS - USBR - EVAPORATION SUPPRESSION 10/19 4 HRS - USBR - (PROJECT NOT SPECIFIED); 2 HRS - AFTERNOON FOR ARS 10/20-23 DROVE TO ORD NEBRASKA TO VISIT MOTHER - RETURNED TO DENVER ON THE 23RD
10/24-28 WORKED ALL DAY EACH DAY - USBR - EVAPORATION SUPPRESSION 10/29 MADE CHARTS FOR MEMPHIS MEETING; 10/30 PHOTO GRADED CHARTS 10/30 WORKED ALL DAY - USBR - ON EVAPORATION SUPPRESSION
OCT - DEC1960 AT HOME: 10/8-9, 15-16, 29, 30, 11/6, 11-13, 19-20, 11/24-27, 12/3-4, 12/8 (PM), 10-11, 15, 17, 23-25, 27-28, 30-21 BUR REC: 10/3-7, 10, 13-14, 17-19, 24-28, 31-11/4, 7-10, 14-17, 11/21-23, 28-12/2, 5, 9, 12-14, 16, 19, 22 USGS: 10/11-12, 12/16
CSU: 10/19 (ARS), 12/20-21 (ARS) BOOKS RETURNED: 10/1, 11/14, 12/9 NO ENTRIES: --
10/2 CHECKED FORMULAS
10/3 CUT LAWN AND TRIMMED - AFTERNOON TOOK GINGER AND KIM TO MOVIE 10/9 TOOK CAROL FOR A DRIVE TO CHERRY CREEK DAM
10/20-23 DROVE TO ORD TO VISIT GRANDMA - HOME 10/23 10/24 GINGER’S BIRTHDAY
10/29 MADE CHARTS FOR MEMPHIS MEETING
10/30 PHOTOGRAPHED CHARTS FOR MEMPHIS MEETING
11/5 PHEASANT HUNTING W/ SAM HOOD, STONE, JIM RICHARDSON (1 PHEASANT)
11/11 MOUNTED SIDES FOR MEMPHIS MEETING (FLASH-HAANDSTADTS-REPAIR) 11/11 KIM’S PACK MEETING
11/12 RAKED LAWN
11/18 DUCK HUNTING AT MCNEIL LAKE W/ SAM HOOD 11/19 PREPARED OUTLINE FOR PRESENTATION AT MEMPHIS
11/22 MORRY, VA, KATHY, KAREN AND MACK VISIT - RETURNED HOME 11/27 11/27 WENT TO CHURCH W/ MORRIS - MORRY AND FAM LEFT FOR DERBY IN AM 12/4 WENT TO DINNER W/ BILL MINTER IN EVENING
12/6 WENT TO MEMPHIS, TN
12/7 DELIVERED PAPER (ASAE) - PLANE 2 HRS LATE, MISSED CONNECT FLIGHT 12/8 AFTER A NIGHT IN DALLAS ARR IN DENVER ON BRANIFF
12/10 CHRISTMAS SHOPPING
12/12 SPENT AFTERNOON @ MARTIN PLANT 12/15 MADE OUT CHRISTMAS CARDS
12/18 SCOUTING TRIP TO DEER CREEK AREA FOR CHRISTMAS BIRD COUNT 12/19 TO FT. COLLINS BY BUS
12/26 CHRISTMAS BIRD COUNT - INDIAN HILLS AREA
12/29 MAILED ORIGINAL VELLUMS OF ARS REPORT TO FT COLLINS 12/29 TOOK GINGER AND KIM TO SEE THE MOVIE “JUNGLE CAT” 12/30 TOOK GINGER AND KIM TO SEE THE MOVIE “GI BLUES”
1960 ADDENDUM
11/1 SPENT 2 HRS WITH MR. JARECKI (REGION) (USBR) - ON THE EFFECT OF PUMP OPERATION ON CEDAR RIVER NEBRASKA - 6 HRS - EVAPORATION SUPPRESSION
11/2 WORKED 7 HRS - USBR - ON DAMS; 1 HR DRAINAGE AND GROUNDWATER 11/3-4 WORKED 8 HRS - USBR - ON EVAPORATION SUPPRESSION
11/7 6 HRS - USBR - EVAPORATION SUPPRESSION; 2 HRS - USBR - DRAINAGE AND GW
11/8 2 HRS - USBR - SALINE WATER; 4 HRS - USBR - DAMS; 2 HRS - DRAINAGE AND GW
11/9 WORKED ALL DAY - USBR - DRAINAGE AND GROUNDWATER
11/10 3 HRS - USBR - SALINE WATER; 1 HR - USBR - EVAPORATION SUPPRESSION - 4 HRS - DRAINAGE AND GW. REP FROM OFFICE OF SALINE WATER INTO DISCUSS OPEN ROTARY STILL WORK - DISCUSSED POSSIBILITY OF
DRIVING THE DISCS AT A LOWER SPEED THAN THE IMPELLER BY MOUNTING MAGNETS ON THE IMPELLER TO DRIVE THE DISCS BY INDUCTION – MR MALETIC SUGGESTED TO DRIVE THE DISCS BY ISSUING VAPOR
11/11 HOLIDAY - MOUNTED SLIDES FOR MEMPHIS MEETING
11/14 USBR - 4 HR EVAPORATION SUPPRESSION; 2 HRS CONCRETE DAMS; 2 HRS LAB STRUCTURES INVESTIGATIONS
11/19 AT HOME - PREPARED OUTLINE FOR PRESENTATION AT MEMPHIS 11/21 WORKED ALL DAY - USBR - STRUCTURES INVESTIGATIONS
11/22 WORKED 4 HRS -USBR - STRUCTURES; 4 HRS - USBR - EVAPORATION SUPPRESSION
11/23 USBR - 7 HRS ON STRUCTURES; 1 HR ON MONO LAYERS
11/28 USBR - 4 HRS - STRUCTURES; 4 HRS EVAPORATION SUPPRESSION 11/29-31 8 HRS EACH DAY - USBR - ON STRUCTURES
12/1 8 HRS - USBR - ON STRUCTURES
12/2 USBR - 2 HRS - EVAPORATION SUPPRESSION
12/5 USBR - 4 HRS - CONCRETE DAMS; 1 HR - EVAPORATION SUPPRESSION, 3 HRS - STRUCTURES - BIG SNOW TODAY
12/6 WENT TO MEMPHIS TENNESSEE
12/7 DELIVERED PAPER ON USE OF MATHEMATICAL MODELS IN DRAINAGE DESIGN BEFORE ASAE IN THE MORNING - CHECKED OUT OF PEABODY HOTEL TO START RETURN TRIP TO DENVER AND PLANE 2 HOURS LATE MISSED CONNECTING FLIGHT IN DALLAS
12/8 AFTER A NIGHT IN DALLAS TOOK BRANIFF TO DENVER - ARRIVED ABOUT NOON - SPENT REST OF DAY AT HOME
12/9 WORKED ALL DAY FOR USBR - NO JOB SPECIFIED
12/12 WORKED 3 HRS - USBR - ON STRUCTURES - WENT TO MARTIN MARIETTA IN THE AFTERNOON
12/13 WORKED 2 HRS - USBR - ON STRUCTURES IN THE MORNING 12/14 WORKED 8 HRS - USBR - ON STRUCTURES
12/16 WORKED 3 HRS - USGS - AM - COMPLETED WORK ON DIFFUSION TEST WORKED 3 HRS - USBR - PM - ON EVAPORATION SUPPRESSION
12/19 USBR - 4 HRS - CONCRETE DAMS; 4 HRS ON STRUCTURES - WENT TO FT COLLINS BY BUS IN THE EVENING
12/20-21 CSU - WORKED 8 HRS BOTH DAYS FOR ARS AT FT COLLINS - RETURNED TO DENVER BY BUS IN THE EVENING
12/22 USBR - 6 HRS ON STRUCTURES; 1 HR - ON EVAPORATION SUPPRESSION 12/29 MAILED ORIGINAL VOLUMES OF THE ARS REPORT ON THE “SPREADING OF A GROUNDWATER MOUND” - TO FT COLLINS IN THE MORNING - WENT TO THE FEDERAL CENTER TO GET CORRESPONDENCE ON THE USERS REPORT ON STREAM DISPERSION TO ANSWER LEOPOLD’S LETTER NO WORK TODAY. TOOK GINGER AND JIM TO SEE “JUNGLE CAT”
Cash Account - December
Research on artificial and natural Recharge of groundwater in Colorado. Proj 112. Bureau of Reclamation Baggins Bay Area Job No. 5-A824-73-10-01.
McMillan Delta. 5-849-0-1-1. Return Flow Study 9-F801-76-30-17
Tuesday, May 3, 1960 124th Day-242 Days to Follow Worked all day [illegible] U.S.G.S. on sediment transportation REG Text given to Mary Ann to be typed on a rough draft
R.E.G.
Wednesday, May 4, 1960 125 Day-241 Days to Follow Worked all day for the U.S.G.S. on bank storage and structure flow. R.E.G.
Talked to Eric Plate at Ft Collins on the phone. They have been able to get a graduate student to work on the text. They have not yet received the reference they have been waiting for. Cermak will be duty until Saturday. Plate will get something together or call us. I stated that the offer waved have to be for and definite program of reacting for rates of peripheral toward wind velocity between O and I. (except for the spot values for checking [illegible]) and for Reynolds number or the range applicable to sediment particles. They waved for around 400. R.E.G.
Thursday, May 5, 1960 126th Day-240 Days to Follow Worked all day for the U.S.G.S. on sediment storage and stream flow R.E.G.
Talked to Eric Plate. They have secured the referral, but it will not help for their McCoil is used Thoni apparatus. They can only get down to Reynold’s number of 1600 but there measure the forces to an accuracy of about [+/-] 50 percent. They could experiment in the range of Reynold’s number 1600 to 16000. The largest sand particles and the wind speed needed to lift at waves give a Reynold’s number of 900. They are not get down to our range.
R.E.G. 5/6/60
Friday, May 6, 1960 127th Day-239 Days to Follow
Worked all day for the U.S.G.S. on bank storage and stream flow R.E.G.
Advised Patricia Box and Walt Garstka that I expected to spend about 3 weeks at the Bureau of
Reclamation during the remainder of the fiscal year. This would amount to about $500. Requested that the fiscal people be [illegible]
R.E.G.
Thursday, May 19, 1960 140th Day-226 Days to Follow
Worked 8 hours for drainage and groundwater at the Bureau of Reclamation R.E.G.
Returned examination for R.H. Brooks in CE 292 format R.E.G.
Friday, May 20, 1960 141st Day-225 Days to Follow Worked 8 hrs for the U.S.G.S. on bank storage and stream flow. R.E.G. May 21 1960
Mr C.C. McDonald in [illegible] unable to talk about my part of the work except at noon or lunch. Call to Cermack at Ft Collins He says they will probably try for a grant from N.S.F to work on the Magnus effect at low Reynolds numbers. He is agreeable to turning back the [illegible] being held [illegible] to give the G.S. the benefit of their investigation. They will send us some notes.
Tuesday, July 12, 1960 194th Day-172 Days to Follow Worked on paper for Ag Engrs.
Talked to Mr Billington about Barr Lake losses. He says they used to be 35 A.F. per day but in the last two years they have gone up to about 80 A.F. per day. They suspect detergents. This is for a [illegible] and includes evaporation loss. At the lowest level the losses are small.
R.E.G. 7-13-60
Friday, August 5, 1960 218th Day-148 Days to Follow
Finished paper for the Western Reserve Conference. Called Dr. A.R. Chamberlain in the morning to tell him about the paper. Called Mr David J. Miller Colorado Bldg Greeley Colorado Elgin-2-9467 to request him to read a copy of the letter of request to Dr Chamberlain to save time. Sent copies of the paper to Dr Chamberlain and to Mr Miller. (Mr Miller’s copy sent special dolwery) In the evening copied maps and pictures on slides for Don Thatcher for the Bird club.
R.E.G. Aug 6 1960
Saturday, August 6, 1960 219th Day-147 Days to Follow At home at 1936 So Lincoln St
R.E.G. Aug 9 1960
Wednesday, August 17, 1960 230th Day-136 Days to Follow
Visited test plots with Messrs Jensen, Bianchi and Johnson. Took photos. Plots visited were Woodside, Warren, Limas, Junio, Huron and Camtra. Worked all day for the A.R.S
R.E.G. Aug 21 1960
Thursday, August 18, 1960 231st Day-135 Days to Follow
Spent the day at the Fresno office outlining studies to be made on analyses of [illegible] with Messrs M. Jensen Bianchi Wm Bianchi and [illegible] Johnson. (For the evening went to Johnsons for supper) Worked all day for the A.R.S
R.E.G. Aug 21 1960
Wednesday, November 9, 1960 314th Day-52 Days to Follow
Worked all day for the Bureau of Reclamation for Drainage [and] Groundwater R.E.G. Nov 10 1960
Thursday, November 10, 1960 315th Day-51 Days to Follow
Worked all day for the Bureau of Reclamation 3 hr for Saline water 1 hr for evaporation suppression 4 hr for drainage and G.W. Mr Cadwallader of the Office of Saline water was in to discuss the open rotor still work. He and I discussed the possibility of driving the discs at a lower speed than the impeller by mounting magnets in the impeller to drive the discs by in junction Robert E. Glover Mr Garstka Suggested to drive the discs for the issuing vapor
Job numbers Monolayers (Non reimbursable) 9-F101-0-5-1.
Non reimbursable research. Concrete 9-F101-0-1-1.’ 812 Structural 9-F101-0-1-2.’ 811 Cement, p02201 and
mixtures 9-F101-0-2-1., 811
Rock foundation, 9-F101-0-4-2. 811 Project services - General
Concrete 23-5504-0-0-1 812 Cement and
p02201 or 23-5504-0-0-2. 811 Structural and materials 23-5504-0-0-5. 811 Rock foundation 23-5504-0-0-9. 811 END TRANSCRIPTION