Amager

bakke- taking

infrastructure

into the

future?

The combination of EfW with recreational activities.

(2)
(3)
(4)

Background

• Replacement of 70’s

plant

• Location beside old

plant

• Growing city- a

(5)

Vision

• Highest possible standard when it comes to

– Energy and environmental performance

– Safety

• Flexibility regarding power production - balancing the grid

• Integrated into the city- with public access to part of the

(6)

De seks kandidater

Gottlieb Paludan Arkitekter A/S - DK

Dominique Perrault Architecture - Fr 3XN A/S - DK

Lundgaard & Tranberg Arkitekter A/S - DK

Bjarke Ingels Group A/S - DK Wilkinson Eyre Architects - UK

(7)

Not only skiing • 80 m climbing wall • Cafe and viewpoint • Running trails • Park

(8)
(9)

Flexibility

High electricity production

– normal heating needs High wind power productionor high heating needs No heatpumps With heatpumps Heatpumps and

turbine by-pass 63 MW Power 157 MW Heating 57 MW Power 190 MW Heating 0 MW Power 247 MW Heating Capacity 560 Mton/year

(10)

Why is this plant important?

• Waste management facilities (and biomass)

suffers badly from NIMBY • Shows that important

infrastructure could/should be part of the city and not

necessarily something to hide away • Combined heat and power can play

an important role in

balancing energy systems with high amount of intermittent renewables

(11)

Thank you for your

attention!

(12)

RISE – Research Institutes of Sweden AB · 010-516 50 00 · info@ri.se · ri.se Lindholmspiren 7 A, 417 56 Göteborg · Box 857, 501 15 Borås

Inge Johansson inge.johansson@ri.se

References

Related documents

High resolution is average power every 6 minutes and low resolution is the average power ev- ery hour, which is the same as energy consumed in kilowatt-hours every hour.. Figure

Factors that, in several studies, have shown to be of importance for creating acceptance for a project in the local community are participation in the planning process, information

skapsdam hos sympatisk herre eller dam att ev. medfölja till badort. F-ria resor och fritt vivre önskas. SAMSKOLELÄRARINNA med flera års under visnings vana önskai

nader. Han visste inte, hur det kom sig, men han hade inte någon matlust — det var, som om han en gång för alla kommit ifrån att äta något vid denna tid på dagen. Det hade

de ihop, fick jag aldrig rätt klart för mig, och jag kunde icke bli fri en misstanke, att vår förmyndare hade något med saken att göra och inte varit värd vår fars förtroende.

In this thesis, the seismic response of a bridge designed according to the current Japanese Design Specifications was evaluated when it is subjected to near-field

On the left-hand side we point out the fact that the electric eld component of the EM wave is nearly perpendicular to the external, geomagnetic eld, which is case for all

Syftet med en avlagringssond är att bestämma mängden påslag som bildas på värmeöverförande ytor. Skillnaden mellan avlagrings- och beläggningssond är hårfin och är främst