Välle broar – arena for applied research

Välle Broar is a local program by the municipality of Växjö to promote increased use of timber in construction. During a 10-15 year period approximately 1000 apartments will be build and, in addition, a total of about 30 000 m2 for commerce and offi ces. All construction within Välle Broar will be realised using timber and timber-based products as the main load-bearing material. Timber construction will be used at a large scale with buildings of up to at least eight storeys. Researchers from Växjö University and from SP Trätek are taking part in several research projects, documenting the birth and growth of the Modern Wooden City.

Limnologen – timber buildings in eight storeys

Acoustics and vibrations

The fi gure below shows the fl oor structure used at Limnologen. By separating the fl oor and the ceiling, good sound insulation is achieved. The fl oor thickness is also larger than for traditional techniques. For walls that separate apartments a classical dou-ble wall is used. At junctions cuts are made in the fl oor structure in order to separate the partitions as much as possible. A fl oa-ting fl oor, not shown in the fi gure below, is placed on top of the CLT-slab. The acoustic performance of the structure at Limnolo-gen is subject to several investigations including measurements of vibrations and airborne sound reduction.

Massive timber fl oor structure at Limnologen

Contacts

Erik Serrano, erik.serrano@vxu.se Hans Andrén, hans.andren@vallebroar.se For acoustics and vibration:

Lars-Göran Sjökvist, lars-goran.sjokvist@sp.se Kirsi Jarnerö, kirsi.jarnero@sp.se

SP Trätek

Växjö, Sweden Välle broar is a new part of Växjö,

south of the city centre.

Limnologen in Växjö, Sweden (4 buildings with totally 134 apartments) is the fi rst building project being realised within the Välle Broar program. At Limnologen seven of the eight sto-reys are made of wood – load bearing parts being made mainly

using cross-laminated timber (CLT). The main eye-catcher at the building site is probably the large tent used to ensure dry wor-king conditions (see middle picture below).

Wood Technology

www.vallebroar.se

COST

FP0702

References

Related documents

The FE simulation performed in the present thesis aims at demonstrating the vertical displacement in the eight-storey timber building of Limnologen under varying moisture

I think the reason for that is that I’m not really writing different characters, I’m only showing different fragments of myself and the things that have stuck to me and become

värmeenergin under ett fullständigt brandförlopp per kvadratmeter omsluten area och kan antas vara mindre än 200MJ/m 2 för flerbostadshus med installerad boendesprinkler.

Also, the Swedish national board of housing, building and planning (Boverket) will require an assessment of life cycle greenhouse gas emissions in the permit process

To gain a deeper understanding of the ionization processes, we have performed extensive calculations for the energy levels of Kr 3+ and Auger rates for transitions from the

I denna studie fann man resultat om att även mentala tankar och målsättningsarbete kan vara källor till hög self-efficacy vilket bör lyftas fram och uppmärksammas då alla

This thesis presents the work of building an automatic parallelization tool that produces an efficient parallel version of the simulation code by building a data dependency graph

När det gäller demonstrationer på gator och torg eller medborgarupprop med krav på en demokratisk kulturpolitik så ser vi inget som liknar de folk- riksdagar och namnlistor