IN

DEGREE PROJECT DESIGN AND PRODUCT REALISATION, SECOND CYCLE, 30 CREDITS

STOCKHOLM SWEDEN 2017,

Auditorium design for niche cinemas

Gathering of general design guidelines and implementation at Cinema Capitol

EMIL SOLLENBY

KTH ROYAL INSTITUTE OF TECHNOLOGY

SCHOOL OF INDUSTRIAL ENGINEERING AND MANAGEMENT

(2)
(3)

Auditorium design for niche cinemas

Emil Sollenby

(4)
(5)

Examensarbete MMK 2017: 115 IDE 297

Auditorium design for niche cinemas

Emil Sollenby

Godkänt

2017-10-24

Examinator

Claes Tisell

Handledare

Anna Holmquist

Uppdragsgivare

Arkitekter Engstrand & Speek

Kontaktperson

Sofie Dahlstedt

Sammanfattning

(6)
(7)

Master of Science Thesis MMK 2017: 115 IDE 297

Auditorium design for niche cinemas

Emil Sollenby

Approved

2017-10-24

Examiner

Claes Tisell

Supervisor

Anna Holmquist

Commissioner

Arkitekter Engstrand & Speek

Contact person

Sofie Dahlstedt

Abstract

(8)
(9)

Förord

(10)
(11)

Content

(12)
(13)

1. Introduction

1.1 Cinema Capitol

1.2 Purpose

(14)

1.3 Method

1.4 Delimitations

1.5 Reading instructions

(15)
(16)
(17)

2. Frame of reference

2.1 Context and historical perspective

2.1.1 The evolution of cinemagoing

(18)

2.1.2 Cinema today and in the future

(19)

2.1.3 The evolution of Capitol (1926-1985)

(20)

2.1.4 Crowdfunding

(21)

2.2 Design guidelines for cinema auditoriums

2.2.1 Recommendations from Film & Kino

(22)
(23)

2.2.2 Design principles at SF Bio

(24)
(25)
(26)
(27)

2.3 Conditions for auditorium design at Capitol

2.3.1 Floor plans

(28)

Screen 1

BYGGHANDLING

BET ÄNDRING AVSER DATUM Sign.

WC

WC

WC

PREL HANDL 20170314

(29)

+21,17 +21,46 -D

TRAPPA

20213,2 m2 WC205a0,9 m2 WC205b1,7 m2

KONTOR

203b15,9 m2 TRAPPA2067,2 m2

(30)
(31)

Screen 2

(32)

4 x 190

= 76

0

1 2 3

(33)

2.3.2 Heritage

(34)

2.3.3 Ambition

(35)

2.3.4 Accessibility

(36)

2.3.5 Governing documents

(37)

3. Implementation

3.1 Analysis of competition and customer segment

3.1.1 Framework

(38)

3.1.2 State of the art and benchmarking

+++/--- ++/-- +/-

(39)
(40)
(41)

Conclusions

(42)
(43)

3.2 User studies

3.2.1 Seating segments and popularity

First row Center Back row Aisle Balcony

(44)
(45)
(46)

3.3.2 Workshops

(47)
(48)

3.3.3 Accessibility studies

(49)

(50)
(51)

3.3 Summary of research

3.3.1 Opportunities for design

3.3.2 Summary of insights

(52)

(53)

3.4 Implementation at Capitol

(54)

3.4.1 Screen 1

(55)
(56)
(57)
(58)
(59)

3.4.2 Screen 2

(60)

S - Seclusion L - Legroom A - Angle

SLA SLA LA

SA SA

LA

SLA

38°

43°

SLA

(61)
(62)
(63)

4. Discussion and conclusions

4.1 Discussion

(64)

4.2 Conclusions

4.3 Recommendations and future work

(65)

References

̈ ̈ ̈ ̊

̈

 

(66)
(67)
(68)
(69)

Appendix 1. Floorplans from the building permit for Capitol

SKALAA2A4NUMMERBET DATUMANSVARIG UPPDRAG NRRITAD AVHANDGGARE

A40-1-10-1:1001:200 2016-12-18Sofie Dahlstedt -SDSD Ark. Engstrand och Speek AB 08-54568460A Kinematografen St Erik AB 08-40010000BYGG-HERRE BIO CAPITOL BYGGLOVHANDLING BETÄNDRING AVSERDATUMSign.

SKALA 1:100

012510

METER OBS: RITNINGEN BASERAD PÅ ÄLDRE HANDLINGSAMT DELVIS KONTROLLMÄTT PÅ PLATS.EJ HELT MÅTTRIKTIG.

3D-SCANNING KOMMER UTRAS INRBYGGHANDLINGSPROJEKTERING. Ändring av verksamhetslokal fn konsertsal till biografAdress: St Eriksgatan 82 StockholmFastighetsbeteckning: Kv Gjutaren Mindre 3

Plan entré- och souterrängning TM

A-AA-A

KV GJUTAREN MINDRE 3 SOUTERRÄNGVÅNING KASSA

+19,70 +19,00

+18,00 +19,00

+18,00 +17,6 +17,6

TillgängligentréVaruinlastningNödutgång +19,70

Nytt entréparti +19,00

+18,85 BAR

TrapphissLiftcat 200el likv

f l ub e t nin g ≈ 1 : 15

b ef lut ning ≈

1 : 10

bef lutning1:10

bef lutning1:10 +18,75 +18,00

parkett82 pl

+19,0

+19,70 +19,68

bef lutnin g ≈1:15

+20,50 +20,32

+17,4

lutning

1:12 +17,4

+17,6+18,0

+18,6 +17,6+18,0

+18,6

+18,0

D - UT

+19,70

BIOGRAFSALONGER MMUNDER GÅRDREDOVISAS PÅ PLAN

KÄLLARVÅNING

VENT BRFFRDcykelparkering

soprl

NEDRE GÅRD SERV.

nedre rader42 pl +17,4

Golv-lucka SALONG 274 m2

NEDRE SALONG 1133 m2

FOA

73 m2 CA

32 m2

RWC

7 m2 WC

2 m2 WC2 m2 WC2 m2

PASS9 m2 INRE FOA17 m2 TRAPPA9 m2

TRAPPA14 m2

PORTGÅNG GITARRSPECIALISTEN PORT BRF

EL/FRD

9 m2 PASSAGE

12 m2 KORRIDOR13 m2

KORRIDOR

16 m2 F/T2 m2 F/T2 m2

KÖK

22 m2 WC/D

3 m2

WC OMKL

6 m2

WC DISK5 m2

FRD

4 m2 INRE FOA

18 m2

PASS3 m2

KORRIDOR

13 m2 RRUM KORRIDOR

16 m2

NÖD-UT

8 m2 RKLARINGAR

RIVEN VÄGG

NY VÄGG

BEF VÄGG

NY ÖPPNING

FLYTTBAR BIOSTOLPLATS FÖR RULLSTOL

N

Souterräng +19,001:100

(70)
(71)
(72)

GJUTAREN MINDRE 3 SEKTION A-A 1:200

(73)

Appendix 2. Reference cinema images

Everyman Screen on the Green

(74)

Electric Cinema Portobello

(75)

Alamo Drafthouse New Mission

Olympic Studios

(76)

Filmstaden Scandinavia

SF Göta

(77)

Bio Rio

(78)

Bar Deco

(79)

Appendix 3. Form variations for seating plans

(80)
(81)

TRITA MMK 2017: 115 IDE 297

www.kth.se

References

Related documents

Spark has previously been used in scientific applications to process large amounts of data [38] and for analytics with Spark’s native modules, and SparkSQL MLlib [40],

The main aim is to look into the Swedish government authorities and give an insight of how a possible path for an increased resilience against a modern

DEGREE PROJECT MEDICAL ENGINEERING, SECOND CYCLE, 30 CREDITS. STOCKHOLM SWEDEN

This scheme essentially relies on consumers making use of other policies like the Green Deal or ECO or it relies on consumers carrying out energy renovations themselves without

DEGREE PROJECT COMPUTER SCIENCE AND ENGINEERING, SECOND CYCLE, 30 CREDITS. STOCKHOLM SWEDEN

I vissa fall är det helt tydligt vem som är kund för en vara eller tjänst, men i andra situationer, så som det blivit belyst vara gällande i detta fall, kan det krävas ett

Då honan är konstruerad för att behandla tryck upp till 400 bar skall denna kunna hantera en liknande kraft av minst 250 Newton vilket gör det mycket svårt att skada kopplingen

The Design Program is very much a response to the building traditions which started to form in Lina Hage and elsewhere in town.. No stone facade or walls, no elaborate roofs