Errata of Licentiate Thesis
Modeling and Simulations of Demand Response in Sweden, by Daniel A. Brodén
● On page iii “Abstract”, the sentence “Simulations show promising results for reducing power imbalances by up to 30% and managing daily congestion of 5-19 MW”, the correct values are 4-19 MW. The same applies for the abstract in Swedish
● On page 4 section “1.2 Current and Future Challenges” the sentence “… as conventional power plants, therefore, if let unmanaged” should be replaced by “left”
● On page 7 section “1.3 Demand Response” the sentence “Furthermore, the thermal inertia of the building provide excellent possibilities to use...” the correct word is
“capabilities”
● On page 8 section “1.4 Demand Response in Sweden” the sentence “… the appliances in houses lead to many insights…” should be replaced by “led”
● On page 12 section “2.1 Control and Scheduling Studies using Demand Response” the sentence “… to minimize the electricity cost of consumers” should be replaced by “for”
● On top of page 34 section ”4.2 Validation of office building consumer load model” the sentence “the total variation in load between weekday and workdays...” should be replaced by “weekends”
● On page 35 section “4.2 Validation of office building consumer load model” the units for the RMSE values of table 4.2 are in kW
Other grammatical mistakes will be corrected for the final digital version of the thesis (available on DiVA)
2017-11-10