PROJECT PLAN

Project group: XX Date: yyyy-mm-dd

1) Group Members

Group Member E-mail Responsibilities in the Project

2) Customer

3) Project Resources

4) Documents to Submit and Deadlines

Document Deadline

Requirement Specification Time Report 1

Time Report 2, 3, ... Every Friday

Project Plan

Design Specification First presentation Project Report Final presentation

(2)

5) Project Tasks

Task

Allocated time (hours)

Group Member in Charge

Project Week*

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

...

TOTAL TIME:

*The duration of the project is 6 weeks, from the first meeting with the supervisor to the final presentation. Write in which week (from 1 to 6) you plan to do each task.

(You can add/remove as many rows in the table as you need. Most projects usually include around 20 tasks.) (The Project Plan should be 2-3 pages.)

References

Related documents

In addition to this aim, this thesis seeks to identify what becomes critical for teacher educators and science center educators when facilitating experiences that enable student

”This doctoral thesis has been prepared within the framework of the graduate school in educational science at the Centre for Educational and Teacher Research, University of

If the PC is not satisfiable then we continue searching until we reach the assertion point through an alternative code path or until we run out of possible code paths, meaning

• To evaluate whether activity performance in individuals with a cervical spinal cord injury level between C5 and C7 changes in basic ADL after reconstruction of elbow extension

In addition, the US individual side (B1) shows similarities to novel PM views, always indicating change as their objective (i.e. influencing legislation by effectuating change

To execute this and get the right expression I wanted in my result, I´ve been testing different construction methods to find the technique that was good for me?. Eventhough this

Because bicycle study tours are themselves experiential activities, a review of the responses provided by the Amsterdam hosts demonstrates that activities in the concrete

“We will create a concept where the replenishment of was- her fluid is conducted in a user friendly and ergonomic way that meets Volvo Cars requirements in design, safety, ergo-