Under InFOrMATIOn FACTS The SwedISh ePA PreSenTS FACTS AbOUT dIFFerenT IS-SUeS

in

fo

r

m

at

io

n

fa

ct

s

information facts beST PrACTICe eXAMPLeS

enerGY SwITCh LIP – LOCAL InVeSTMenT PrOGrAMMeS MAY 2011

enVIrOnMenTALLY eFFICIenT

PeLLeT heATInG In GrYCKSbO

In Grycksbo near Falun, the Municipality replaced electricity-based and oil-based heating with a biofuel-fired district heating plant. As a result, Falun replaced 550 m3 of oil and 2 400 MWh of electricity with renewable energy.

The Municipality of Falun in 2000 received grants from the Local Investment Pro-gramme (LIP) to build a biomass-based hot water plant with associated distribution system to replace heating based on electricity and oil in Grycksbo. A school, a health-care centre and around 20 apartment blocks are now heated by renewable energy from the new plant. The switch mainly took place in 2002, but the last customers were connected in 2004.

PositiVE EnVironmEntaL anD Economic imPacts

• Switch from electricity to renewable energy: 550 MWh/year. • Switch from oil to renewable energy: 500 m3/year.

• Carbon dioxide emissions decreased by 1 385 tonnes/year. • The price of heating has fallen for the customers.

(2)

swedish EPa Se-106 48 Stockholm. Visiting address: Stockholm - Valhallavägen 195, Östersund - Forskarens väg 5 hus Ub, Kiruna - Kaserngatan 14.

Tel: +46 8-698 10 00, fax: +46 8-20 29 25, e-mail: registrator@naturvardsverket.se Internet: www.swedishepa.se orders Ordertel: +46 8-505 933 40,

orderfax: +46 8-505 933 99, e-mail: natur@cm.se Address: CM Gruppen, box 110 93, Se-161 11 bromma. Internet: www.swedishepa.se

information facts beST PrACTICe eXAMPLeS

enerGY SwITCh LIP – LOCAL InVeSTMenT PrOGrAMMeS MAY 2011 ISbn: 978-91-620-8586-5

imPLEmEntation

The municipality built a boiler plant with a hot-water boiler, a reserve boiler, a boiler-house and a heating network to each customer and connected the customers. The boiler plant has a 1.5 MW wood pellet boiler. The plant today produces 4.5 GWh of heat. During the summer when the load is too low a smaller electric boiler is used. At first there was also an oil-fired boiler for peak loads, but that is not longer used.

The network was built early in the project, which meant that connecting the cus-tomers went smoothly once construction of the boiler plant was completed.

The ash is spread to a varying extent in the forests and is used to cover a landfill. It was intended to be possible in principle to spread all the ash in the forest, but there is a lack of interest today from the forest owners in spreading all the ash. The fuel for the boiler comes from local suppliers in Gästrikland.

Falun is examining the options for carrying out a similar reconstruction in Bjursås, and plans to use woodchips for firing there. The concepts are otherwise identical.

PotEntiaL anD fUtUrE BEnEfit

District heating systems reduce air pollution locally, and often signify efficient fuel use. The biomass fuels in the systems have substantial positive climate effects. Increased urbanisation is improving the prospects for expanding district heating.

whY beST PrACTICe

Many customers are connected to the district heating plant. Implementation went well thanks to good planning. The fact that the fuel for the boiler comes from local suppliers creates employment for local suppliers. The return of ash contributes towards closing the cycle of nutrients between town and country. It is possible to convert the plant to combined heat and power if the technology for small-scale combined heat and power from biomass fuels becomes competitive.

FOr FUrTher InFOrMATIOn Contact

bengt Östling, head of district heating, Falu energi & vatten

Telephone: +46 (0)23-77 49 90 e-mail: bengt.ostling@ev.se. Per-erik Olsson, plant manager

Telephone: +46 (0)23-77 49 00 (switchboard) Contractors/providers

Osby Parca supplied the boilers Siemens supplied the control systems.

Standard suppliers were used for the boilerhouse, the pipeline system and the groundworks.

The project on the Internet: www.fev.se

Further information on best Practice www.swedishepa.se/bestpractice www.naturvardsverket.se/mir FACTS

LIP Falun 2000 Action 14

environmental investment: SeK 11m Grant: SeK 1.6m

References

Related documents

46 Konkreta exempel skulle kunna vara främjandeinsatser för affärsänglar/affärsängelnätverk, skapa arenor där aktörer från utbuds- och efterfrågesidan kan mötas eller

Exakt hur dessa verksamheter har uppstått studeras inte i detalj, men nyetableringar kan exempelvis vara ett resultat av avknoppningar från större företag inklusive

The increasing availability of data and attention to services has increased the understanding of the contribution of services to innovation and productivity in

The aims are to implement a concept, consisting of a mechanical dewatering press with a packed moving bed dryer in a pellet process chain, then (a) investigate both its energy and

Since communication is a key to success in a company (Butchibabu et al., 2016) and communication differs between cultures (Tange & Lauring, 2009) it is important to further

The possibility of using the fundamental principle of the solar water heating system at the hospital on residential houses in Dragash was considered, and if so what changes need to

Decision support systems are PC based systems intended for interactive utilization by users or decision makers having the capability to handle the progression of interaction as

With grants from the Local Investment Programme (LIP), the Borås municipal energy company built a pellet-fired local heating plant in Dalsjöfors.. As a result, the small com-