• No results found

Simulation of alternative load paths after a wall removal in a platform-framed cross-laminated timber building

N/A
N/A
Protected

Academic year: 2021

Share "Simulation of alternative load paths after a wall removal in a platform-framed cross-laminated timber building"

Copied!
1
0
0

Loading.... (view fulltext now)

Full text

(1)

ISBN: 978-91-88898-64-7

33

Simulation of Alternative Load Paths After a Wall Removal in a Platform-Framed

Cross-Laminated Timber Building

Johannes A. J. Huber†*, Mats Ekevad, Ulf Arne Girhammar, and Sven Berg

Division of Wood Science and Engineering, Luleå University of Technology, Forskargatan 1, 93187 Skellefteå, Sweden, johannes.huber@ltu.se

An increasing number of multi-storey timber buildings use cross-laminated timber (CLT) for their bearing structure. Platform-framed CLT buildings consist of vertical repetitions of floors resting upon one-storey tall walls, squeezing-in the floor panels between the walls. Tall buildings need to be structurally robust because many lives would be at stake in case of a disproportionate collapse. Robustness is the ability of a system to survive the loss of components. For collapse resistance, it poses the last line of defence, after an unforeseen exposure (e.g. accident, terrorism) has already occurred and after the exposed components could not resist failure. A robust building offers alternative load paths (ALPs) which come into action when a part of the bearing structure has been removed [1].

Many alternative load path analyses (ALPA) have been conducted for tall concrete and steel buildings using the finite element method (FEM), but for timber, ALPA are still scarce. ALPs depend on the behaviour of the connections after a loss [1]. Studies on timber so far have accounted for connections in a simplified manner by lumping their aggregate behaviour into single points. Our goal is to elicit the ALPs after a wall removal in a platform-framed CLT building, study their development and quantify their capacity, to determine whether they can prevent a collapse.

We investigated a corner bay of an 8-storey platform-framed CLT building (see Figure 1) and removed a wall at the bottom storey. We studied the ALPs of each storey by pushing down the walls above the gap in a non-linear quasi-static analysis in the FE software Abaqus. We accounted for contact and friction, considered plastic timber crushing, and accounted for brittle cracking in the panels. We modelled single fasteners with connector elements which simulated the elastic, plastic, damage and rupture behaviour. We recorded the force-displacement curves, i.e. pushdown curves, for each storey and used them to conduct a dynamic analysis of the entire bay in a simplified model, as suggested by [2].

Figure 1: Model of the bay, a single storey and a single connector element

The results show that the structure could engage the following ALPs after a wall removal: I) arching action in the outer floor panels, II) arching action of the walls, III) quasi-catenary action in the floor panels, and IV) hanging action from the roof panels. The ALPs were limited by various parameters, but they sufficed to resist a collapse of the bay. We observed that the inter-storey stiffness influenced the load-sharing among storeys, which affected the structural robustness. In the compressed connections, friction, and not the fasteners, transferred most of the horizontal loads. Future research should test the squeezed-in platform joint experimentally, to quantify its capacity for transverse shear loads. We also advise to assess the inter-storey stiffness to estimate the capacity for load-sharing among storeys.

References

[1] J.A.J. Huber, M. Ekevad, U.A. Girhammar, S. Berg: Structural Robustness and timber buildings – a review. Wood

Material Science & Engineering, 14/2 (2019), 107-128, DOI: 10.1080/17480272.2018.1446052.

[2] B. Izzudin, A. Vlassis, A. Elghazouli, D. Nethercot: Progressive collapse of multi-storey buildings due to sudden column loss – Part I: Simplified assessment framework, Engineering Structures, 30/5 (2008), 1308-1318.

Figure

Figure 1: Model of the bay, a single storey and a single connector element

References

Related documents

However, CLT and other mass timber products are not commonly used low rise housing (below 4 stories) since the same buildings can be built more cheaply with less wood by using

In the nurse home visit workflow illustrated in figure 3, a patient is first sent to the homeVisit event from the agent based model and immediately moves to the sendNurse event to

management’s outlook for oil, heavy oil and natural gas prices; management’s forecast 2009 net capital expenditures and the allocation of funding thereof; the section on

By visualizing their heating demand and consumption, including the inside temperature of the apartment, people could turn down their radiator in order to decrease

Since the fall of the Berlin Wall, Ostalgie and Westalgie have emerged in both German film and literature as a way to invoke a nostalgia for the past, or

46 Konkreta exempel skulle kunna vara främjandeinsatser för affärsänglar/affärsängelnätverk, skapa arenor där aktörer från utbuds- och efterfrågesidan kan mötas eller

The increasing availability of data and attention to services has increased the understanding of the contribution of services to innovation and productivity in

Office Medical Locker room men Locker room women Exchange resin Storage Recreation area Water collection pool Water collection tanks Parking.. Loading zone