to double tracks through Varberg

Expansion of the West C oast Line

(2)

This is how the West Coast Line will be developed through Varberg.

(3)

The aim of the double track expansion is to create a fast, efficient, and environmentally friendly means of transport.

With a fully expanded double track, the capacity on the West Coast Line will increase, thereby making increased frequency of both passenger and goods train services possible.

The Varberg tunnel is planned as an approximately 3.1 km long tunnel under central Varberg (2.8 km rock tunnel and 300 m concrete tunnel).

There will be a new station house with a descent to the platforms, which are situated in an approximately 900 m long concrete trough at the north tunnel portal. In addition, a new freight yard will be built north of Var- berg. In total, 7.5 km of new double track will be built.

As the tunnel is built, the barrier effect in the form of rail tracks in central Varberg will disappear. This will create opportunities for better contact between the city and the sea. At the same time, a large, centrally situated area where the rail yard is situated today will be freed up for development.

Implementation and procurement

Preliminary studies and railway studies for the expansion of the West Coast Line through Varberg were conducted at the beginning of the last decade. The decision on permissibility for the Varberg tunnel came from the Government in March 2013. Procurement of consultants for planning (producing railway plans, system documents, and detailed development plans) are now under way.

Planning and design 20 13-2018, production ca. 2019-2024 2.9 BSEK (ca. 320 MEUR) (2009 price levels) The Swedish Transport Administration, 2.4 BSEK;

Varberg Municipality, 290 MSEK;

Region Halland, 210 MSEK;

and Jernhusen 60-100 MSEK Timeline:

Cost:

Financing:

(4)

SWEdiSH TRAnSPoRT AdMiniSTRATion. oRdER nUMBER: 100642. SEPTEMBER 2013. PRodUCTion: GRAfiSK foRM, SWEdiSH TRAnSPoRT AdMiniSTRATion. PRinT: inEKo.

Trafikverket, SE-781 89 Borlänge. Street address: Röda vägen 1 Telephone: +46 771 921 921, Text telephone: +46 10 123 50 00 www.trafikverket.se

References

Related documents

Besides this we present critical reviews of doctoral works in the arts from the University College of Film, Radio, Television and Theatre (Dramatiska Institutet) in

I have chosen to quote Marshall and Rossman (2011, p.69) when describing the purpose of this thesis, which is “to explain the patterns related to the phenomenon in question” and “to

By comparing the data obtained by the researcher in the primary data collection it emerged how 5G has a strong impact in the healthcare sector and how it can solve some of

Generella styrmedel kan ha varit mindre verksamma än man har trott De generella styrmedlen, till skillnad från de specifika styrmedlen, har kommit att användas i större

I dag uppgår denna del av befolkningen till knappt 4 200 personer och år 2030 beräknas det finnas drygt 4 800 personer i Gällivare kommun som är 65 år eller äldre i

Detta projekt utvecklar policymixen för strategin Smart industri (Näringsdepartementet, 2016a). En av anledningarna till en stark avgränsning är att analysen bygger på djupa

DIN representerar Tyskland i ISO och CEN, och har en permanent plats i ISO:s råd. Det ger dem en bra position för att påverka strategiska frågor inom den internationella

Av 2012 års danska handlingsplan för Indien framgår att det finns en ambition att även ingå ett samförståndsavtal avseende högre utbildning vilket skulle främja utbildnings-,