• No results found

1959, copies

N/A
N/A
Protected

Academic year: 2021

Share "1959, copies"

Copied!
17
0
0

Loading.... (view fulltext now)

Full text

(1)

Item Metadata

Collection: Glover (Robert E.) Papers Author: Glover, Robert E. (Robert Ellsworth) Title: 1959, copies

Date: 1959

File Name: WREG02909.pdf Date Transcribed: December 2020 Editors: Trista Barker

Transcription Platform: Microsoft Word BEGIN TRANSCRIPTION JAN-MAR 1959 AT HOME 1/1-4, 18, 23, 29-2/1, 8, 15, 22, 28-3/1, 14-15, 18, 20-29 USGS 1/5-9, 12-14, 15 (½), 16, 19 (4), 20-22, 2/2 (2), 3(4), 4-5, 6 (4), 24 (4), 4-5, 6 (4), 24 (4), 25, 3/16 (4), 3/17 (4), 19 (2), 30, 31 (7) TGWH 1/2, 6, 23-24, 3/28 USBR 1/19 (4), 2/6 (4), 24 (4), 26-27, 3/9-13, 16 (4) CSU 1/15 (4), 17 (6), 25-28, 29 (4), 2/9-13, 14 (4), 16-20, 21 (4), 3/2-6, 7 (4) 1/2 WORKED ON GROUNDWATER TEXT

1/3 10[DEGREES FARENHEIT] BELOW ZERO THIS MORNING 1/5 WORKED ALL DAY FOR USGS ON COOPER’S PROBLEM

1/6 WORKED 4 HRS FOR USGS; IN AM WORKED ON DRAFT OF ‘GW’ TEXT 1/7 8 HRS - USGS: MADE RECONNAISSANCE OF SITES FOR DISPERSION

TESTS ON HORSE TOOTH AND PUDRE SUPPLY CANALS NEAR LOVELAND AND FORT COLLINS 1/8 WORKED ALL DAY FOR USGS ON STREAM DISPERSION

1/9 WORKED ALL DAY FOR USGS ON SEA WATER ENCROACHMENT (COOPER’S PROBLEM) 1/11 TO CHERRY CREEK DAM AREA WITH R STONE

(2)

1/12 WORKED ALL DAY FOR USGS ON COOPER’S PROBLEM

1/13 8 HRS - USGS PREPARING REPORT ON CANAL RECONNAISSANCE AND MAKING COMPUTATIONS FOR DISPERSION TESTS

1/14 WORKED ALL DAY FOR USGS ON COOPER’S PROBLEM

1/15 4 HRS - CSU - CORRECTING STENCILS FOR REPORT ON BENDING MOVEMENTS AND PRESSURES DUE TO SLAMMING - SPENT AFTERNOON WITH THE FLU AND PRESSURES DUE TO SLAMMING = SPENT AFTERNOON WITH THE FLU

1/16 WORKED ALL DAY FOR USGS ON COOPER’S PROBLEM

1/17 WORKED 6 HRS - CSU - PREPARING MEMO ON POSSIBLE SOLAR ENERGY RESEARCH 1/19 4 HRS - USBR - SALINE WATER; 4 HRS - USGS; 1/20 8 HRS USGS - COOPER’S PROBLEM

1/21 WORKED FOR USGS - 4 HRS ON DISPERSION, 4 HRS ON EVAPORATION - AM CONFERENCE ON DIFFUSION TESTS; 1/22 - WORKED ALL DAY FOR USGS

1/23 AT HOME TO WORK ON GROUNDWATER TEXT; ALSO 1/24 ON TEXT 1/25 TOOK BUS TO FT COLLINS

1/26-28 WORKED ALL DAY EACH DAY AT CSU; 1/29 5 HRS - FLU - RETURNED TO DENVER 1/30 AT HOME RECOVERING FROM FLU.

2/2 WORKED 1 HR FOR USGS

2/3 4 HRS - USGS; DISCUSSION AT STATE OFFICE BLDG - NEED FOR S PLATTE STUDIES - AM 2/4 8 HRS - USGS - REPS IN FROM VALPARAISO, CHILE - SEA WATER ENCROACHMENT 2/5 8 HRS - USGS; 2/6 4 HRS - USGS, 4 HRS, USBR

2/8 TOOK BUS TO FT COLLINS IN EVENING = EXPENSES FOR WEEK $19.59

2/9-13 WORKED ALL DAY EACH DAY AT CSU; 2/14 4 HRS CSU - DRAINAGE DISCUSSION 2/15 RETURNED TO FT COLLINS BY EVENING BUS

(3)

2/16 8 HRS - CSU - ON THE S.N.A.M.E SEGMENTED MODEL REPORT

2/17-20 8 HRS EA DAY - CSU; 1/21 4 HRS - CSU, RETURNED HOME - EXPENSES $21.15 2/23 HOLIDAY - TOOK TRIP WITH CAROL TO GET PICTURES - KIOWA AND BIJOU CREEKS 2/24 4 HRS - USGS ON EVAPORATION; 4 HRS - USBR ON DRAINAGE

2/25 8 HRS - USGS ON EVAPORATION

2/26-27 8 HRS EACH - USBR - ON GLEN CANYON DAM 3/1 WENT TO FT COLLINS BY BUS IN EVENING

3/2 8 HRS - CSU; 3/3 8 HRS CSU - COMPLETED REPORT FOR SOCIETY OF NAVAL ARCHITECTS AND MARITIME ENGINEERS - (S.N.A.M.E)

3/4 8 HRS - CSU; COMPLETED PROPOSAL FOR S.N.A.M.E 3/5-7 8 HRS EACH DAY - CSU; 2/7 WORKED 4 HRS

3/9-12 WORKED ALL DAY EA DAY AT USBR - GLEN CANYON DAM

3/13 WORKED ALL DAY AT USBR ON GLEN CANYON DAM - OUR CAR EAS HIT FROM BEHIND BY A TRUCK WHILE STOPPED AT A REDLIGHT

3/14 AT HOME - GOT PRINT FROM ENGLEWOOD, GOT GROCERIES, WASHED WINDWOODS 3/16 4 HRS - USBR ON GLEN CANYON DAM; 4 HRS - USGS - ON EVAPORATION

3/17 4 HRS - USBR - GLEN CANYON DAM; 4 HRS USGS - EVAPORATION - MORRIS AND FAMILY ARRIVED ABOUT 4:30 FOR A VISIT

3/19 WORKED 2 HRS - USBR - SALINE WATER; MORRIS AND FAMILY LEFT IN AM 3/20 BILL AND JEAN ARRIVED FOR A VISIT

3/22 BILL AND I WENT OUT TO THE FEDERAL CENTER

3/24 BILL, JEAN, CAROL AND I WENT UP TO THE LAKE TO FISH 3/27 BILL AND JEAN LEFT FOR FORT HUENEME, CALIFORNIA

(4)

3/28 WORKED ON GROUNDWATER TEXT 3/30 WORKED ALL DAY AT USGS

3/31 WORKED 7 HRS AT USGS ON SEDIMENT TRANSPORATION - TOOK THE EVENING BUS FOR FT COLLINS

(5)

APR-JUN 1959 NO ENTRIES: 4/4, 4/255-26, 5/10 AT HOME 4/7-12, 15-19, 5/11, 18-19 (½), 23-26, 6/7, 13-15, 20, 22, 23 (½)

USGS 4/3, 6 (5), 13-14, 20-21, 22 (7), 23-24, 5/5 (6), 6 (2), 11-15, 6/2 (4), 3 (2) TGWH 4/6 (3), 4/22 (1), 6/2 (4), 3 (6), 4-5, 8-12, 16, 23 (4), 25 (2), 26

CSU 4/1-2, 5/7-8, 9 (4)

4/1 WORKED ALL DAY AT CSU - DISCUSSED APPLICATION OF MATHEMATICS OF BIOLOGICAL SITUATIONS 4/2 WORKED ALL DAY AT CSU - RETURNED TO DENVER - GOT CAR BACK/FROM BURET CHEVROLET 4/3 WORKED ALL DAY FOR USGS

4/5 FISHING AT MCNEIL LAKE - R STONE DROVE HIS NEW “LARK” - BASS/BILLIEGILL CAUGHT 4/6 3 HRS USBR - GLEN CANON DAM; 5 HRS FOR USGS

4/8-12 WORKED ON NOTES ON “GROUNDWATER HYDRAULICS” - 4/12 FINISHED NOTES 4/13-14 WORKED ALL DAY EACH DAY FOR USGS - WATER LOSS RESEARCH

4/20-21 WORKED ALL DAY BOTH DAYS FOR USGS - “SEDIMENT TRANSPORTATION” 160 HOURS BUDGETED FOR THIS PROJECT DURING REMAINDER OF FISCAL YEAR

4/22 WORKED 7 HRS - USGS - SEDIMENT TRANSPORT; 1 HR - USBR - GLEN CANYON DAM AUTHORIZATION FOR 100 HOURS WORK FOR USBR CAME TODAY

4/23 WORKED ALL DAY FOR USGS ON SEDIMENT TRANSPORT - MR MICHEL BATISSE AT UNESCO IN TO TALK ABOUT ARID LAND - HAS OFFICE IN PARIS

4/24 WORKED ALL DAY FOR USGS ON SEDIMENT TRANSPORT

4/27 BEGINNING OF TRIP FOR USGS TO CAMBRIDGE MASSL WASH DC - ARRIVED IN BOSTON - TOOK A ROOM AT CAMBRIDGE HOTEL IN CAMBRIDGE, MASS - MET A CIVIL ENGINEER FROM UNIV OF CALIF - A SPECIFLIAST IN ATMOSPHERIC POLLUTION

4/28 VISITED BAIRD - ATOMIC COMPANY IN AM; TO NORWALK CT IN AFTERNOON

4/29 VISITED PERKIN - ELMER CO IN NORWALK CT IN AM; BARNES ENGINEERING IN STAMFORD CT IN AFTERNOON AND RETURNED TO NORWALK CT

(6)

4/30 TO MT VERNON NY TO VISIT FERRAND OPTICAL CO IN AM; VISITED BULD VA RESEARCH LABORATORIES IN THE AFTERNOON

5/1 TO MORRISTOWN NJ TO VISIT THE UNITED STATES RADIUM CORPORATION; RETURNED TO NORWALK CT

5/2-3 VISITING MARJORIE AND FAMILY IN NORWALK, CT; 5/3 TO NEW YORK IN PM

5/4 TO WASHINGTON, DC VIA UNITED - FLIGHT DELAYED ONE HOUR AT IDLEWILD; GAVE 45 MINUTE SUMMARY OF THE RESULTS OF THE TRIP - LATER HAD A DISCUSSION OF WORK AND STATUS OF REPORT ON STREAM DISPERSION

5/5 WORKED 6 HRS FOR USGS ON EVAPORATION PROBLEM AFTER RETURNING HOME 5/6 2 HRS SPENT AT HOME FOR USGS - EVAPORATION PROBLEM - TOOK BUS TO CSU 5/7-8 WORKED ALL DAY BOTH DAYS AT CSU; 5/9 HALF DAY - CSU - TOOK BUS HOME 5/11-15 WORKED ALL DAY EACH DAY FOR USGS

5/16 PLANTED FLOWERS AT THE HOUSE

5/17 FISHING AT MCNEIL LAKE WITH R STONE - CAUGHT BASS, PERCH, TROUT 5/18 WASHED WINDOWS, CUT LAWN

5/19 WORKED 4 HRS FOR USGS IN THE AFTERNOON - DISCUSSION ABOUT WORK IN FISCAL YEAR 5/20-22 DROVE TO ORD, NEBRASKA WITH CAROL AND VISITED MOTHER

5/23 ARRIVED IN DENVER AND HOME ABOUT 2:15 AM

5/27 LEFT FOR VERNAL UTAH FOR TRIP DOWN GREEN RIVER - LODGED AT DINOSAUR MOTEL 5/28 TWO BOATLOADS; CAMPED AT WADE AND CURTIS CABIN - RIGHT BANK OF GREEN RIVER 5/29 FLOATED DOWN GREEN RIVER TO RIPPLING BROOK CAMPSITES - ALSO ON RIGHT SIDE

5/30 FLOATED DOWN TO JUNCTION WITH THE YAMPA AT STEAMBOAT ROCK - ATE LUNCH - FLOATED DOWN TO JONES CREEK CAMP ON RIGHT BANK

(7)

5/31 FLOATED DOWN TO DINOSAUR HEADQUARTERS - MET AND TAKEN TO VERNAL, UTAH - STAYED AT DINOSAUR MOTEL

6/1 RETURNED TO DENVER IN JOHN SPENCER’S CAR

6/2 4 HRS - USGS - PREPARING A BUDGET PROPOSAL; 4 HRS - USBR - PREPARING AN ITINERARY FOR RICE

6/3 2 HRS - USGS - PROPOSAL FOR WORK IN EY 1960; 6 H4S - USBR - WORK ON DAMS 6/4 8 HRS - USBR - WORK ON DAMS; 6/5 8 HRS - USBR - GLEN CANYON DAM

6/6 WENT FISHING AT MCNEIL LAKE WITH GOERGE POWELL

6/8-12 WORKED 8 HRS EACH DAY AT USBR ON THE GLEN CANYON DAM

6/12 MORRIS AND FAMILY ARRIVED ABOUT MIDNIGHT; 22 HRS REMAIN ON USBR ALLOTMENT 6/16 WORKED ALL DAY AT USBR ON SALINE WATER

6/17 MORRIS AND FAMILY LEFT FOR KANSAS IN AM

6/18 AT HOME - WORKED ON DISCUSSION OF THOMAS PAPER; 6/22 ALSO 6/19 WENT FISHING AT MCNEIL LAKE WITH W MO. PARKER

6/21 WENT TO PFRETSCHNER’S PLACE TO PREPARE FOR TALKING BIRD PHOTOS 6/22 AT HOME - WORKED ON DISCUSSION OF DR THOMAS’S PAPER

6/23 WORKED 4 HRS - USBR - ON THE GLEN CANYON DAM

6/24 WENT FISHING AT MCNEIL LAKE WITH WM AND JOHN MOODY

6/25 WEDDING ANNIVERSARY - MARRIED 34 YEARS TODAY; 2 HRS - USBR - ON SALINE WATER 6/26 WORKED ALL DAY AT USBR ON SALINE WATER

6/29 WORKED ON UNION CARBIDE APPLICATION - CAR WOULD NOT START - BROKEN DISTRIBUTOR - A WRECKER CAR TOWED IT AWAY

(8)

JUL-SEP 1959 NO ENTRY - 8/15 8/30, 9/13, 26-27 AT HOME 7/4-5 10-12, 18-19, 25-26, 8/2, 9, 16, 22-23, 9/7

USHR: 7/1 (2), 6-9, 13-15, 17, 20-24, 29-31, 8/3-7, 10-14, 24-28, 31-9/4, 8-10, 11 (4), 9/14-16, 28-29 TGWH - MENTIONED 7/6, 9

USBR - 7/1 (6), 9/11 ROTARY STILL 8/14 OPERATED (1ST TIME)

AMERICAN ELEC POWER SVC CORP - 9/30 CSU 7/2-3, 27-28, 8/1, 8, 17-21, 29, 9/5, 12, 17-19, 21-25

7/1 6 HRS - USBR - ON SALINE WATER; 2 HRS - USGS; GINGER AND KIM ARRIVED 7/2 WENT TO FT COLLINS BY BUS IN AM - ATTENDED ASCE MEETINGS IN AFTERNOON 7/3 ATTENDED ASCE MEETING IN FT COLLINS - RETURNED HOME IN EVENING

7/4 WENT TO AMERICAN LEGION SALUTE TO AMERICA WITH CAROL, GINGER AND KIM 7/5 WENT TO DANIEL’S PARK WITH CAROL, GINGER AND KIM TO HAVE A PICNIC

7/6 WORKED ALL DAY - USGS - ON MEASUREMENT OF STREAM DLOW BELOW A GLACIER ON MY SHASTA; LEFT DRAFT OF “TGWH” WITH JOHN MALETIC FOR HERB RIESBOL

7/7 8 HRS - USGS - ON CHEMICAL STREAMFLOW DETERMINATION METHOD 7/8 8 HRS - USGS - ON BANK STORAGE PROBLEM

7/9 8 HRS - USGS - ON BANK STORAGE PROBLEM; TGWH DRAFT RETURNED 7/10 SPENT DAY AT LAKE WITH CAROL, GINGER AND KIM

7/11 AT HOME - CAROL AND GINGER WENT SHOPPING, KIM AND I STAYED HOME

7/12 WENT WITH CAROL, GINGER AND KIM TO RED ROCKS PARK IN THE AM - IN THE AFTERNOON, WENT WITH GINGER AND KIM TO SEE “SHAGGY DOG” AT THE MAYAN

7/13-15 WORKED ALL DAY EACH DAY AT USGS ON BANK STORAGE PROBLEM

7/16 SPOKE AT WESTERN RESOURCES CONFERENCE MEETINGS TODAY - BOULDER COLO (TRIP UP AND BACK - BOS)

(9)

7/18-19 WENT SWIMMING BOTH DAYS AT PROGRESS PLUNGE WITH GINGER AND KIM

7/20-24 8 HRS EACH DAY AT USGS ON BANK STORAGE PROBLEM - OBTAINED 2ND APPROXIMATION TODAY

7/25 WENT TO SUMMIT LAKE WITH CAROL, GINGER AND KIM - CAROL FELL AND HURT HER LIP 7/26 TOOK EVENING BUS TO FT COLLINS

7/27 WORKED ALL DAY - CSURG - GW REPLACEMENT - DR CHAMBERLAIN WILL SEND LETTER - MY NEW STATUS

7/28 WORKED ALL DAY - CSURF = GROUNDWATER REPLACEMENT - RETURNED TO DENVER BY BUS 7/29-31 WORKED ALL DAY EACH DAY - USGS - ON DISPERSION REPORT REVISION DISCUSSION ON BANK STORAGE IN CONNECTION WITH PROBLEM OF RETURN FLOWS IN PACIFIC NEW

8/1 8 HRS - CSURG - (AT HOME) ON GW REPLENISHMENT - LETTER SENT TO BITTINGER 8/2 WENT TO MCNEIL LAKE WITH CAROL, GINGER AND KIM

8/3 WORKED ALL DAY FOR USGS ON DISPERSION POINT REVISION

8/4 WORKED ALL DAY - USGS - ON BANK STORAGE, STREAMFLOW RELATIONSHIP - MADE COMPUTATIONS FOR YUE CANADIAN RIVER

8/5-7 WORKED ALL DAY EACH DAY ON BANK STORAGE PROBLEMS

8/8 8 HRS - CSURG - GW REPLENISHMENT - WORK DONE IN DENVER - LETTER TO BITTINGER 8/9 WENT TO MCNEIL LAKE WITH CAROL, GINGER AND KIM

8/11-14 WORKED ALL DAY EACH DAY AT USGS - BANK STORAGE, STREAMFLOW PROBLEM

8/14 ROTARY STILL OPERATED FIRST TIME - CASING TEMPERATURES IN RIGHT RANGE TO PRODUCE DISTILLATION AND DISTILLATE WAS BEING PRODUCED

8/16 TO FT COLLINS BY BUS IN THE EVENING

8/17-21 8 HRS - PROJECT 112 - “RESEARCH ON ARTIFICIAL-NATURAL RECHARGE OF GW IN COLO” 8/22 12 HRS AT HOME ON PROJECT 112. (8/17-21 WORKED 8 HRS EACH DAY)

(10)

8/24-28 WORKED 8 HRS EACH DAY ON BANK STORAGE PROBLEM 8/29 WORKED 8 HRS EACH DAY ON BANK STORAGE PROBLEM 8/31-9/4 8 HRS EACH DAY - USGS - ON BANK STORAGE PROBLEM

9/3 IN THE EVENING WENT WITH CAROL, GINGER. KIM TO RINGLING BROS/BARNUM AND BAILEY CIRCUS

9/5 WORKED 8 HRS FOR CSU ON OLD’S RESERVOIR RECHARGE PROBLEM 9/6 MR FRETZSCHNER, KIM AND I WENT FISHING AT MCNEIL LAKE

9/8-10 WORKED ALL DAY EACH DAY FOR USGS ON BANK STORAGE PROBLEM

9/11 WORKED 4 HRS - USBR - SALINE WATER; 4 HRS - USGS - BANK STORAGE PROBLEM REVISED CLAIMS ON OPEN ROTARY STILL SENT TO ASST SOLICITOR - MARGIE ARRIVED

9/12 WORKED 8 HRS - CSU - PROJECT 112

9/14-16 WORKED ALL DAY EACH DAY - USGS - BANK STORAGE - STREAMFLOW PROBLEM 9/15 THIRTY YEAR PIN AWARDED TODAY

9/17-19 WORKED ALL DAY EACH DAY AT HOME FOR CSU ON PROJECT 112, ROUNDTRIP $4.29 9/20 CLIMBED ON DEVILS HEAD WITH CAROL, MARGIE, GINGER AND KIM - BUS TO FT COLLINS IN EVENING

9/21-25 WORKED ALL DAY EACH DAY - CSU ON PROJECT 112 - RETURNED TO DENVER - EXP 18.26 9/23 CONFERENCE (CSU) ON POSSIBILITY OF APPLYING THE METHOD OF RITZ = OR SIMILAR ENEGERY METHOD TO THE ANALYSIS OF ARCH DAMS - I HAD SUGGESTED THIS IN A PREVIOUS LETTER - FINANCIAL - SUPPORT IS THE GREATEST PROBLEM

9/28-29 WORKED ALL DAY BOTH DAYS - USGS - REVISION OF STREAM DISPERSION REPORT

9/30 WORKED ALL DAY FOR AMERICAN ELECTRIC POWER SERVICE CORPORATION BASED IN NEW YORK - 13 OF US PRESENT FOR CONSIDERATION OF THE 1.E.P.S.C PENSTOCK DESIGN

(11)

OCT-DEC 1959 AT HOME 10/3-4, 17-18, 11/22, 26, 29, 12/5, 6, 20, 25-27 USGS 10/5, 11/12 (4), 23, 12/7-11, 28 USBR 10/1-2, 6-9, 12-16, 27-30, 11/2-6, 9-10, 12 (4), 16-20, 24, 27, 12/4, 21 CSU 10/3, 10, 19-21, 31-11/1, 7, 13-14, 21, 28, 30-12/3, 5, 12, 14-18, 19, 12/22-24, 29-31 NO ENTRIES 11/15, 12/13

10/1-2 WORKED ALL DAY BOTH DAYS - USBR - BAFFING BAY PROBLEM 10/3 WORKED 8 HRS FOR CSU ON PROJECT 112 - AT HOME

10/5 WORKED ALL DAY - USGS - ON STREAM DISPERSION REVISION 10/6-9 WORKED 8 HRS EACH DAY - USBR - BAFFIN’S BAY PROBLEM

10/10 REPORT ON OLDS RESERVOIR INVESTIGATION SENT TO BITTINGER (CSU) TODAY 10/11 WENT TO MCNEIL LAKE WITH CAROL MARJORIE, GINGER AND KIM

10/12-16 WORKED 8 HRS EACH DAY - USBR - BAGGINS BAY PROBLEMS 10/18 - TO FT COLLINS BY BUS EXPENSES FOR 3 DAYS $25.83

10/19-21 WORKED ALL DAY EACH DAY FOR CSU ON PROJECT 112 - RETURNED HOME

10/22 LEFT FOR ORD, NEBRASKA WITH CAROL, MARJORIE, GINGER AND KIM - SPENT NIGHT AT STAR MOTEL AT AXTELL NEBRASKA

10/23 LEFT AXTELL AT 6:50 AM - ARRIVED IN ORD ABOUT NOON - VISITED WITH MOTHER GLOVER AND LEFT ORD FOR RETURN TRIP ABOUT 5:45 PM - SPENT NIGHT IN BELLVILLE, KANSAS (9 PM)

10/24 DROVE FROM BELLEVILLE, KS TO DERBY KS TO VISIT MORRIS, VIRGINIA, KATHY, KAREN LEFT THEIR HOUSE ABOUT 5:30 PM - ARRIVED PODGE CITY 9:30 PM - CLAUSEN MOTOR CT

10/25 SAW BOOT HILL MUSEUM AT DODGE CITY - LEFT DODGE CITY ABOUT 8:30 AM AND ARRIVED IN DENVER ABOUT 4:00 PM

10/26 WORKED 8 HRS ON CSU PROJECT 112 IN DENVER

10/27-3 WORKED 8 HRS EACH DAY FOR USBR ON MCMILLAN DELTA 10/31 WORKED 8 HRS FOR CSU ON PROJECT ½

(12)

11/1 COMPLETED REPORT ON OLDS RESERVOIR (CSU PROJECT 112) - COMPUTATION SENT TO BITTINGER

11/2 WORKED 8 HRS FOR USBR ON THE MCMILLAN DELTA 11/3 WORKED 8 HRS FOR USBR ON BAFFIN BAY

11/4 4 HRS - USBR - ON BAFFIN BAY, 4 HRS - USBR ON MCMILLAN DELTA - COMPLETED MEMO ON BAFFIN BAY WORK - CONFERENCE IN THE MORNING

11/15 8 HRS - USBR - MCMILLAN DELTA PROBLEM; TOTAL ALLOTTED TIME FOR DRAINAGE AND GROUNDWATER IS 120 HOURS - 76 HOURS REMAINING

11/6 WORKED 8 HRS ON MCMILLAN DELTA PROBLEM (USBR) - 2 MEMOS - ONE FOR JOHN MALETIC ON BAFFINS BAY WORK - REQUIRING SIGNATURE ONLY - ONE ON THE MCMILLAN DELTA

11/7 WORKED 8 HRS - CSU - ON THEIR PROJECT 112 ON STORAGE OF GROUNDWATER 11/8 WENT TO RED ROCKS PARK WITH MARFORIE AND KIM

11/9 8 HRS - USBR - 2 HRS HYO BRANCH, 6 HRS - MALETIC 11/10 8 HRS - USBR - ON BAFFINS BAY

11/12 WORKED 4 HRS - USGS; 4 HRS - USBR

11/13-14 (EA DAY_ 8 HRS - CSU - RESEARCH UNIT ON PROJECT 112 11/16-17 8 HRS EACH DAY - USBR - ON BAFFINS BAY

11/18 4 HRS - USBR - BAFFINS BAY, 4 HRS - USBR - MCMILLAN DELTA 11/19-20 8 HRS EACH DAY - USBR - MCMILLAN DELTA

11/21 WORKED ALL DAY FOR CSU ON PROJECT 112

11/23 8 HRS - USGS - ON REVISION OF THE DISPERSION REPORT

11/24 8 HRS - USBR - MCMILLAN DELTA - CONFERENCE ON MODEL VS. TRIAL LOAD - GLEN CANYON DAM

(13)

11/25 WENT FUCK HUNTING AT MCNEIL LAKE WITH SAM HOOD 11/27 WORKED ALL DAY FOR USBR ON RETURN FLOW HYDROLOGY 11/28 WORKED ALL DAY FOR CSU ON PROJECT 112

11/30 WORKED ALL DAY FOR CSU ON PROJECT 112 TO FT COLLINS BY BUS, EXPENSES $25.65 12/1-3 WORKED ALL DAY EACH DAY FOR CSU ON PROJECT 1/2, RETURNED HOME BY BUS 12/4 WORKED ALL DAY FOR USBR ON SLAINE WATER

12/5 AT HOME - WORKED ALL DAY - CSU - PROJECT 112; MR CLARK CAME TO VISIT CHILDREN 12/7-11 WORKED 8 HRS EACH DAY FOR USGS - REVISION OF STREAM DISPERSION REPORT 12/12 WORKED 8 HRS FOR CSU ON PROJECT 112

12/14-18 WORKED 8 HRS FOR USGS ON STREAM DISPERSION 12/19 WORKED 8 HRS FOR CSU ON PROJECT 112

12/21 WORKED ALL DAY AT USBR ON RETURN FLOW PROBLEM 12/22-24 WORKED ALL DAY EACH DAY FOR CSU ON PROJECT 112

12/25 NO WORK - CHRISTMAS WITH CAROL, MARJORIE, GINGER AND KIM 12/28 WORKED ALL DAY FOR USGS ON SEDIMENT TRANSPORATION 12/29-31 WORKED ALL DAY FOR CSU ON PROJECT 112 (ALL DAY EACH DAY)

12/31 PRELIMINARY VERSION OF A REPORT ON THE SOUTH PLATTE SENT TO BITTINGER TODAY. Monday, February 9, 1959

40th Day-325 Days to Follow Worked all day at the Colorado State University

(14)

Possibilities of The “living barrier” for water conservation on intermittent streams [illegible] with

Bittenger Robinson and Dirmayer. This is a line of trees and erosion controlling plains constructed across the stream channel to retard floor flows until the runs [and] can reach into the water table and replenish the underground reservoir. It would be built, if possible at a narrow [illegible] which [illegible] back water up to spread it over a wide area.

R.E.G Feb 10 1959

Tuesday, February 10, 1959 41st Day-324 Days to Follow Worked all day at the Colorado State University

R.E.G Feb 15 1959

Tuesday, March 3, 1959 62nd Day-303 Days to Follow Worked all day at the Colorado State University. REG Mar 7 1959

Completed report for The Society of Naval Architects and Marine Engineers. R.E.G Mar 7 1959 Wednesday, March 4, 1959

63rd Day-302 Days to Follow Worked all day at the Colorado State University

REG Mar 7 1959

Completed proposal for [illegible] study for S.N.A.M.E.

Dr chamberlain [illegible] of the possibility that I might have to take steps to make better use of my time which might make a preparation for C. S. U. He [illegible]

R.E.G Mar 7 1959

Saturday, March 7, 1959 66th Day-299 Days to Follow Worked until noon for the Colorado State University

R.E.G

Returned to Denver by Bus in the afternoon REG MA 10 1959

The [illegible] with Dr Chamberlain and Ed Schultz. Ed Cecil was present. Some research of the augmented model tests were reviewed. Schultz [illegible] are getting low. I offered by resignation to

(15)

help out this [illegible] if needed. Dr Chamberlain suggested that -- we [illegible] the former practice of [illegible] day [illegible] when I don’t work my free time [illegible]

Sunday, March 8, 1959 67th Day-298 Days to follow At home at 1936 So Lincoln St

REG Mar 10 1959

Sunday, April 26, 1959 116th Day-249 Days to Follow [Blank]

Monday, April 27, 1959 117th Day-248 Days to Follow

Beginning of trip for U.S.G.S. to Cambridge Mast, Wash D.C. and return to Denver. Left Denver via United Airlines flight 502 at 3:20 A.M. Arrived at Boston and took a room at the Continental Hotel at Cambridge Mass

REG May 6 1959

Met Mr Tibbetts Civil Engineer of the University of California He is a specialist in atmospheric pollution REG May 6 1959

Tuesday, April 28, 1959 118th Day-247 Days to Follow

Visited the Baird-Atomic Company in the morning in the afternoon went to Norwalk Connecticut via New York, New Haven and Hartford railroad

Railroad fare $8.93 R.E.G May 6 1959

Wednesday, April 29, 1959 119th Day-246 Days to Follow

Visited the Perkin-Elmer Company in Norwalk in the morning and the Barnes Engineering Company at Stanford Connecticut in the afternoon and returned to Norwalk. The return was made by auto. REG May 6 1959

Thursday, April 30, 1959 120th Day-245 Days to Follow

(16)

Went to New York City and back to Mt Vernon N.Y. to visit the Farraud Optical Company in the forenoon and returned to New York City.

Visited The Bulora Research Laboratories at Woodside in the afternoon. R.E.G

May 6 1959

Friday, May 1, 1959 121st Day-244 Days to Follow

Went to New York City from Norwalk and by Bus to Morristown N.J. to visit the United States Radiation Corporation. Returned to New York City and from there to Norwalk Connecticut.

R.E.G May 6 1959

Monday, May 4, 1959 124th Day-241 Days to Follow

Traveled to Washington D.C. via United Airlines (Plane delayed one hour leaving Idlewild airport at 8:45 AM.) At Washington D.C. gave a 45 minute summary of the results of the trip and decreased work and statues of report on stream dispersion with Parker and Leopold. Left Washington via United Airlines 15 5:30 P.M. Eastern Daylight savings time and [illegible] at 9:10 P.M. std time

REG May 6 1959

Tuesday, May 5, 1959 125th Day-240 Days to Follow Worked 6 hours for the U.S.G.S. on the evaporation problem. R.E.G May 6 1959

Tuesday, May 12, 1959 132nd Day-233 Days to Follow Worked all day for the U.S.G.S. REG May 13 1959

Wednesday, May 13, 1959 133rd Day-232 Days to Follow Worked all day for The U.S.G.S. R.E.G

Note: A call from Mrs Box of the Bureau of Reclamation was reviewed today. She says that they did not recall 16 hours of my time spent with them. In one case there was to have been 2 days at 8 hours each

(17)

which the timekeeper put down as 2 days with 8 hours total. To clear their records they will put me down for 8 hours today and 8 hours tomorrow Even though they are aware that my records may show otherwise. Mr Boyder was advised of their plan. He thought some record should be made of this return. This is the purpose of the note.

R.E.G.

Two instruction manual returned to Baird-Atomic Inc today. R.E.G. Tuesday, September 29, 1959

272nd Day-93 Days to Follow

Worked all day for the U.S.G.S. on revision of The Stream Dispersion report. REG Oct 1959 Wednesday, September 30, 1959

273rd Day-92 Days to Follow

Worked all day for the American Electric Power Service Corporation 30 Church St New York 8 N.Y. REG Oct 3 1959

Those present for consideration of the AEPSC penstock design were. F.W. Scheidenhelm. Cons Engr

Roy W. Carlson “” Harry W. Stuber EBASCO. John B. Smethlaige M.J. Hroncich H.A. Krammer. N.J. Hronicle Louis Puls R.E. Glover John Portmakiar I.A. Winter Fritz Heidinger Harold Sheda O. Rice.

References

Related documents

 Institutional Reform: Economic reforms need to be accompanied by political and institutional reforms that reduce the risk of state capture to the benefit of a narrow elite.

Lena Lid Falkman, PhD, Rhetorician and Leadership Expert, Member of Svenska Dagbladet’s Election Panel. 17.15 Parallel

economic efficiency perspective, as a truly meritocratic system that makes no differential assessments based on gender, race or ethnicity can best take advantage of a society’s

Gratis lräomedel från KlassKLur – KlassKlur.weebly.com – Kolla in vår hemsida för fler gratis läromedlet – 2019-03-26 17:58... After I couple of lessons, it is

Wheter it is a normal day, a story about what you enjoy daily or

In trying to critically investigate mathematics classroom work, and to go beyond “prototypic mathematics classroom” research, it is essential to bring in the power executed

När han kommer hem från skolan har han inte lika behov av tavlan mer än att se att tiden går; han har väldigt svårt att veta om det är morgon eller kväll och det har tavlan

x selektera patienter i behov av förebyggande behandling mot illamående x identifiera patienter med förväntad ökad smärta efter operation x ge individanpassad smärtlindring