• No results found

TIME REPORT Project group: XXReport number: XDate: yyyy-mm-dd1) Hours spent on the project and tasks.

N/A
N/A
Protected

Academic year: 2021

Share "TIME REPORT Project group: XXReport number: XDate: yyyy-mm-dd1) Hours spent on the project and tasks."

Copied!
1
0
0

Loading.... (view fulltext now)

Full text

(1)

TSIU03

TIME REPORT

Project group: XX Report number: X Date: yyyy-mm-dd

1) Hours spent on the project and tasks.

Group Member Worked hours

this week Worked hours

so far Tasks done this week

2) Status of the project.

Finished tasks

Ongoing tasks

Planned tasks

Difficulties found this week and if/how you have faced them

References

Related documents

Moreover, the costs of connecting to the network might be too high (redevelopment of a new network).The wind turbines produce a large amount of energy and Komossa is

It is also important to say that the biodiesel tank will work with an air filter positioned on top (illustration 81), removing the moisture of its interior, diminishing the water

Informations- och kommunikationsteknologi (IKT) har mycket att erbjuda för dem som har Special Learning Difficulties (SpLD), särskilt när det gäller att skriva och/ eller läsa, som

The results from the new filter pack combined with a PM 10 inlet agree well with the EMEP filter pack (without inlet and defined cut-off) for sulphur dioxide, sulphate and

assumptions into several simpler decision models. These are later combined using a structural framework, for instance a traditional four-step travel model. The framework

The main goal of the project was to create better routines of collaboration with V¨axj¨o Kommun and V¨axj¨obost¨ader to jointly plan for research on the consumption of energy and

Kommentera nedan hur du anser att kursen har bidragit till kursdeltagarnas kunskaper om hållbar utveckling och hållbart nyttjande av naturresurser.. Kursen har inte tagit upp

The evaluation model included the following evaluation criteria: (1) sum of time spent on each individual activity within the scope of the project, (2) distribution of the time