• No results found

Josefina Posch and Leslie Johnson’s first collaborative artwork “The Metamorphosis of Power”

N/A
N/A
Protected

Academic year: 2021

Share "Josefina Posch and Leslie Johnson’s first collaborative artwork “The Metamorphosis of Power” "

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

Lecturer Josefina Posch and Prof. Leslie Johnson Fine Art Akademin Valand The Metamorphosis of Power

2018

3

rd

Tbilisi Triennial, Gori, Georgia

Josefina Posch and Leslie Johnson’s first collaborative artwork “The Metamorphosis of Power”

responds to the specific situation of an electric bus transformer station in central Gori behind Stalin

Avenue. Gori, the birthplace of Josef Stalin, is part of the ancient silk route significant not only for

commercial trade but also knowledge exchange and communication. Closeby is Uplisciche, an an-

cient cave village and sun temple from 6000 BC. Gori, the windiest city in Georgia, is developing

as a center for alternative energy such as wind and solar power. The artwork links together the de-

velopment of wind and solar power as a transformation of the ancient silk trade route and historic

power structures.

(2)
(3)
(4)
(5)

References

Related documents

Re-examination of the actual 2 ♀♀ (ZML) revealed that they are Andrena labialis (det.. Andrena jacobi Perkins: Paxton & al. -Species synonymy- Schwarz & al. scotica while

This study has focused on how two countries, Sweden and the Netherlands, work with implementing wind power by exploring what policies they have concerning wind power development,

However, to successfully teach culture, media literacy and intercultural competence through film, preparational as well as follow-up work are essential and the

So I’m assuming we now have an agreement to sell you a car.” One agency I trained with taught us to test the assumed closed by stating/asking (auto salespeople are good at

There were two proteins were labeled, Proliferating Cell Nuclear Antigen (PCNA) and methyltransferase for lysine 9 of histone H3 (G9a) and In situ investigation techniques offered

In contrast to reducing the applicability of the theory, this shows how it can be utilized in practice as a means of enhancing intergroup relations (Pettigrew & Tropp, 2006:

We observe that demand response makes the power system flexible until 30% wind power integration independent from the decrease in the wind power production and the

The prices of electricity are taken from Nordpool which handle the entire Nordic market of electricity.[5] Wind data was gathered from Svenska Kraftnät on