Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Often nowadays architect and modern architecture is questioned by different sides that their visions is too expensive, too modern and too futuristic.

Sometimes that might be true, but is there maybe a deeper answer. What is the reason they are questioned, is it that the viewer does not understand how the finished product is created?

And what if the architect is even going further is his/hers reasoning in the creation. What if it is not a simple red thread that is simple to follow in creating the building? But is actually 5, 10 or 20 different red threads that all start from the same point but all follow different paths and are then developed differently and then finally brought together to form the final product at end.

Kenneth Eriksson Manifesto ’’Black and White! Gray?’’2020

(2)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Umeå Castle 2020

Housing complex for an informal competition

Studio 1 UMA 3

Finals

Degree project (UMA3 15,0hp)

Spring Semester 2019/2020

Creator/Examinee Kenneth Eriksson Tutors Toms Kokins, Sara Zetterlund, Joël Jouannet

(3)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

To create a large housing complex with a parking ratio of 0,9 per

household. Furthermore, with offices and businesses on the first floor.

Having a max floor limit from the municipality of 8 floors. Adding that the nation is planning to build a second track of railway, and adding a community stop at that railway.

Länstyrelsen demanded that the promenade was to be activated that the citizens has the possibility to access the water. Furthermore,

laying out some restrictions on the building area. As such 40 meters of no living zone from the bridge and with a 30 meter from the

railway. And having a 20-meter open space towards the water. To

ease up tensions from current residents of Sofiehem by creating view lines to the water of the river.

Design criteria for competition entry

Area for invention Restriction from Highway bridge

Restriction from railway Residents of Sofiehem

Restriction from river

(4)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Site //

The site is Strömpilen 2 & Sofiehem 2:1 situated in the southeastern part of Umeå.

On the north bank of the river of Umeå.

This challenging site with 2 highways for cars with one of them on a bridge.

One railway track that would possibly

expand to a two-track railway. A beautiful river view and a group of citizens from Sofiehem that are used to a riverside view.

Map of Umeå Map of Bottnia

Map of Site

(5)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

https://easytourchina.wordpress.com/tag/fujian-tulou/

https://museot.fi/utstallningar/index.php?nayttely_id=1002

https://www.domusweb.it/en/architecture/2018/11/13/big-unveils-79park- in-stockholm-an-artificial-landscape-in-cedar-wood-and-glass.html

Finding a concept

Castle of Raseborg Fujian Tulou 79 & Park

(6)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Process

Concept of a wall

Concept of round castle wall

Concept of round tower mix Concept of round tower break up

Concept of round tower

Concept of castle structure Concept of castle

Concept of castle Concept of broken wall

Concept of two-point wall Concept of standard sugar cube high rises Adapting normal high rises

Concept from opposition design

(7)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

https://boards.cruisecritic.com/topic/2625046-iona-construction/page/8/

(8)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Importance of Structure //

The building is built with a wooden structure of glue laminated pillars and

beams. With a simplified structure built onsite will create its own design. This will also cut the cost of the building and having the openings between the

pillars filled with insulation will decrease the unit’s sizes.

Building structure Building structure

(9)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Cubes adaptable //

The apartments follow a system of combining units of cubes. Either as 1, 2 or 3, this gives the apartments their sizes of either 25, 50 or 75 m².

These cubes are adaptable in their positioning and will maximizing the use of the area. Furthermore, the inside is fully adaptable according to the needs and wishes of the customer.

75 m² 50 m²

25 m²

(10)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Cubes is cost efficent //

These cubes will be built off-site to maximize productivity. Built with a timber frame method that are easy to handle and construct. The unit will be built as modules with roof, floors and walls built separately and then put together before transportation. This method is taken from the cruise ship industry, were the structure is first built and the cabins are built offsite before installments into the structure. This method will drastically reduce building time and reduce building cost.

Cube as units

Cube structure Axonometric partial cube

(11)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Movement in plans //

As the underground parking takes up most of the

ground floor added with businesses and shops. The first floor is where the housing areas start together with a large open courtyard. The second floor and upwards is weaved together with housing and semiprivate

balconies for the residents and open spaces that can be seen through by the sofiehem residents.

Ground floor

1:st Floor

2:nd Floor

3:rd Floor

4:th Floor

5:th Floor

6:th Floor

7:th Floor

8:th Floor

Legend Garage

Open Courtyard

Semiprivate resident area Housing

Offices and businesses

(12)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Section

(13)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Facade as a billboard //

soundproofing and a forest in one

The façade is designed to work in a similar way as when

soundproofing a music studio. Just as the main building structure the structure of the façade will be built on site on the main structure. And modules of panels will be built offsite. These panels are simply made without complicated methods and this makes them both cost-, time- and material efficient. With the design combined with woods natural good sound absorption will help toward the noise from the highways and railway.

Reference

Lifting a single panel

Collage of panels

(14)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

With the irregular structure combined with the standing panels of wood and passages to the river background. This will create a mirage of standing in a forest and seeing the river in the distance.

Facade towards Sofiehem Sight through the building Openings in the building

(15)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Partial facade towards Sofiehem

With the pathways rails made out of timber frame and filling out of glass for minimizing obstruction to see through the building. This to ensure the

maximum result of seeing through the building.

(16)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Concept of Promenade

(17)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Courting the water// getting regulators in on the idea

To increase the use of the river a small boats harbor is created, and small shops,

restaurants and cafeterias will make the citizens more interested in using the riverfront.

In combination of adding birch trees, this will create a feeling of walking down a French canal.

Vision of Promenade

Partial section of the Promenade Promenade highlighted

(18)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Design with parks on the roofs// Getting occupants involved into the design

As the large courtyard is an open public space. The roof parks will become a semipublic common area for the residents. And by the term become outdoor living rooms for the resident to create a better community.

https://archello.com/story/63362/attachments/renders/5?fullscreen=1

Reference for parks ’’Miami Produce’’ Two types of parks open and semi-private

(19)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Partial axonometric projection of building Open corridor spaces

Semiprivate balcony parks

Private balconies

Open public courtyard

Underground garage

First floor business

Entry to public park Walking paths for residents

Railway

Bicycle lane

Open use of the river

(20)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

A view upon the castle and over the courtyard

(21)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Structure model over the project

(22)

Studio 1

UMA 3 Spring Semester

2019/2020

Umeå Castle 2020

Housing complex for an informal competition

3D view over the project

References

Related documents

Att vara arbetslös eller inte ha möjlighet till att arbeta på grund av njursvikten gör att många upplever att deras egenvård blir sämre, något som även kan hända när

The “new value” of the dependent variable and lagged value of the variable on the right hand side of the equation (the logarithm of building starts both in level and as

Flera pågående ärenden Om ägaren skulle vilja använda SMS eller e-post för att kommunicera med upphittare och nytt ärende kommer in till ägaren så kunde inte SMS och e-post

A government inquiry has been prepared from the state with the name "A joint housing supply responsibility" (SOU 2018: 35). Municipalities work in many ways different and

Elevator no 3 is code operated and gives you access to the the stairwells and the basement with laundry and garbage room.. Use your apartment key for the key operated elevator and to

good quality: the buildings are well preserved and that is sign of a well accepted social housing neighborhood. Good quality makes the

Since all the municipalities in the table have low residential construction levels coupled with higher levels of demand, the purchasing prices move oppositely with the

En tredje manlig rektor diskuterar hur både män och kvinnor begränsas av föreställningar kopplade till deras respektive könsidentitet när jämställdhet inte råder:..