Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Often nowadays architect and modern architecture is questioned by different sides that their visions is too expensive, too modern and too futuristic.
Sometimes that might be true, but is there maybe a deeper answer. What is the reason they are questioned, is it that the viewer does not understand how the finished product is created?
And what if the architect is even going further is his/hers reasoning in the creation. What if it is not a simple red thread that is simple to follow in creating the building? But is actually 5, 10 or 20 different red threads that all start from the same point but all follow different paths and are then developed differently and then finally brought together to form the final product at end.
Kenneth Eriksson Manifesto ’’Black and White! Gray?’’2020
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Umeå Castle 2020
Housing complex for an informal competition
Studio 1 UMA 3
Finals
Degree project (UMA3 15,0hp)
Spring Semester 2019/2020
Creator/Examinee Kenneth Eriksson Tutors Toms Kokins, Sara Zetterlund, Joël Jouannet
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
To create a large housing complex with a parking ratio of 0,9 per
household. Furthermore, with offices and businesses on the first floor.
Having a max floor limit from the municipality of 8 floors. Adding that the nation is planning to build a second track of railway, and adding a community stop at that railway.
Länstyrelsen demanded that the promenade was to be activated that the citizens has the possibility to access the water. Furthermore,
laying out some restrictions on the building area. As such 40 meters of no living zone from the bridge and with a 30 meter from the
railway. And having a 20-meter open space towards the water. To
ease up tensions from current residents of Sofiehem by creating view lines to the water of the river.
Design criteria for competition entry
Area for invention Restriction from Highway bridge
Restriction from railway Residents of Sofiehem
Restriction from river
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Site //
The site is Strömpilen 2 & Sofiehem 2:1 situated in the southeastern part of Umeå.
On the north bank of the river of Umeå.
This challenging site with 2 highways for cars with one of them on a bridge.
One railway track that would possibly
expand to a two-track railway. A beautiful river view and a group of citizens from Sofiehem that are used to a riverside view.
Map of Umeå Map of Bottnia
Map of Site
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
https://easytourchina.wordpress.com/tag/fujian-tulou/
https://museot.fi/utstallningar/index.php?nayttely_id=1002
https://www.domusweb.it/en/architecture/2018/11/13/big-unveils-79park- in-stockholm-an-artificial-landscape-in-cedar-wood-and-glass.html
Finding a concept
Castle of Raseborg Fujian Tulou 79 & Park
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Process
Concept of a wall
Concept of round castle wall
Concept of round tower mix Concept of round tower break up
Concept of round tower
Concept of castle structure Concept of castle
Concept of castle Concept of broken wall
Concept of two-point wall Concept of standard sugar cube high rises Adapting normal high rises
Concept from opposition design
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
https://boards.cruisecritic.com/topic/2625046-iona-construction/page/8/
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Importance of Structure //
The building is built with a wooden structure of glue laminated pillars and
beams. With a simplified structure built onsite will create its own design. This will also cut the cost of the building and having the openings between the
pillars filled with insulation will decrease the unit’s sizes.
Building structure Building structure
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Cubes adaptable //
The apartments follow a system of combining units of cubes. Either as 1, 2 or 3, this gives the apartments their sizes of either 25, 50 or 75 m².
These cubes are adaptable in their positioning and will maximizing the use of the area. Furthermore, the inside is fully adaptable according to the needs and wishes of the customer.
75 m² 50 m²
25 m²
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Cubes is cost efficent //
These cubes will be built off-site to maximize productivity. Built with a timber frame method that are easy to handle and construct. The unit will be built as modules with roof, floors and walls built separately and then put together before transportation. This method is taken from the cruise ship industry, were the structure is first built and the cabins are built offsite before installments into the structure. This method will drastically reduce building time and reduce building cost.
Cube as units
Cube structure Axonometric partial cube
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Movement in plans //
As the underground parking takes up most of the
ground floor added with businesses and shops. The first floor is where the housing areas start together with a large open courtyard. The second floor and upwards is weaved together with housing and semiprivate
balconies for the residents and open spaces that can be seen through by the sofiehem residents.
Ground floor
1:st Floor
2:nd Floor
3:rd Floor
4:th Floor
5:th Floor
6:th Floor
7:th Floor
8:th Floor
Legend Garage
Open Courtyard
Semiprivate resident area Housing
Offices and businesses
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Section
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Facade as a billboard //
soundproofing and a forest in one
The façade is designed to work in a similar way as when
soundproofing a music studio. Just as the main building structure the structure of the façade will be built on site on the main structure. And modules of panels will be built offsite. These panels are simply made without complicated methods and this makes them both cost-, time- and material efficient. With the design combined with woods natural good sound absorption will help toward the noise from the highways and railway.
Reference
Lifting a single panel
Collage of panels
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
With the irregular structure combined with the standing panels of wood and passages to the river background. This will create a mirage of standing in a forest and seeing the river in the distance.
Facade towards Sofiehem Sight through the building Openings in the building
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Partial facade towards Sofiehem
With the pathways rails made out of timber frame and filling out of glass for minimizing obstruction to see through the building. This to ensure the
maximum result of seeing through the building.
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Concept of Promenade
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Courting the water// getting regulators in on the idea
To increase the use of the river a small boats harbor is created, and small shops,
restaurants and cafeterias will make the citizens more interested in using the riverfront.
In combination of adding birch trees, this will create a feeling of walking down a French canal.
Vision of Promenade
Partial section of the Promenade Promenade highlighted
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Design with parks on the roofs// Getting occupants involved into the design
As the large courtyard is an open public space. The roof parks will become a semipublic common area for the residents. And by the term become outdoor living rooms for the resident to create a better community.
https://archello.com/story/63362/attachments/renders/5?fullscreen=1
Reference for parks ’’Miami Produce’’ Two types of parks open and semi-private
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Partial axonometric projection of building Open corridor spaces
Semiprivate balcony parks
Private balconies
Open public courtyard
Underground garage
First floor business
Entry to public park Walking paths for residents
Railway
Bicycle lane
Open use of the river
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
A view upon the castle and over the courtyard
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Structure model over the project
Studio 1
UMA 3 Spring Semester
2019/2020
Umeå Castle 2020
Housing complex for an informal competition
3D view over the project