Item Metadata
Collection: Glover (Robert E.) Papers Author: Glover, Robert E. (Robert Ellsworth) Title: 1965, copies
Date: 1965
File Name: WREG03016.pdf Date Transcribed: October 2020 Editors: Trista Barker
Transcription Platform: Microsoft Word BEGIN TRANSCRIPTION 1965 JAN-MAR AT HOME: 1/1-3, 5, 10, 17, 24, 31, 2/7-11, 14, 21-22, 25, 27-28, 3/6 (½), 7, 15 (½), 3/20-24, 28 USBR: 1/4, 6, 7 (½), 11 (½), 12 (½), 13 (½), 18, 20 (½), 25 (½), 26 (½), 2/15-17, 2/23-24, 3/1-3, 4 (½), 9-10, 16-18, 19 (½), 25, 29 (½), 31 1/1 MR LUBER CALLED
1/2 TO CHERRY CREEK WITH KIM TO TAKE PICTURES
1/3 MARJORIE + I TOOK GINGER BACK TO FT COLLINS FOR WINTER QUARTER 1/5 TO DR HAGER FOR CHECKUP
1/7 WORK ON COURSE PREPARATION - 1 HRS
1/8 TO FT COLLINS, FINAL ARRANGEMENT FOR CLASS (CE293-GW) WITH DR FEAD SPENT 1 HR - WORK FOR DR MADISON - PM, WORKED 4 HRS OGALLALA ANALOG REPORT IN THE EVENING HAD SUPPER W/ GINGER IN CAFETERIA
1/9 TAUGHT CE293 CLASS - RETURNED TO DENVER - EXPENSES $16.60 1/11 WORKED ON OGALLAL[A] ANALOG REPORT - 4 HRS
1/12 WORKED ON OGALLALA REPORT - MAILED REVISED REPORT TO LONGENBAUGH 1/14 PREPARATION FOR TEACHING CE293 - 7 HRS
1/15 WORKED 5 HRS ON CE293, TO FT COLLINS (PM) CONFERRED W/ MADISON, ET AL ON TELESCOPE FOR PROJECTED OBSERVATORY
1/16 TAUGHT CLASS, RETURNED TO DENVER - EXPENSES $14.19 1/17 TO CHERRY CREEK WITH KIM TO TAKE PICTURES
1/19 WORKED 2 HRS CLASS PREPARATION, WORKED ON WILDERNESS (TETON) REPORT 1/20 WATCHED PRESIDENTS INAUGERATION ON TV
1/21 COURSE PREPARATION FOR CSU - 2 HRS, MAILED TECHNICAL MATERIAL AND FORMS CONTRACT TERMINATION FORM TO OAK RIDGE TODAY
1/22 TO FT COLLINS - SAW FEAD, MADISON OAKLEAF (WHO SAID “BOOM + BUST NOT GOOD ECONOMICS FOR OGALLALA; PREPARED FOR LECTURES, SUPPER WITH GINGER
1/23 3RD SET OF LECTURES IN CE293, RETURNED TO DENVER - EXPENSES $16.65 1/24 TO CHERRY CREEK WITH MARJ, CAROL HAD BIRTHDAY CAKE/SPGC DINNER (1/22) 1/25 WORKED ON INFORMATION FOR PROF MADISON - 1 HR
1/27 COURSE (CE293) PREPARATION - 5 HRS: TO ENGINEER’S CLUB - HEARD TALK ON G.W. 1/28 WORKED ON CE293 - 10 HRS
1/29 WORKED ON CE293 - 10 HRS, TO FT COLLINS W/ LONGENBAUGH - DISCUSSED OGALLALA
1/30 TAUGHT CLASS IN CE293, FURTHER DISCUSSION, RETURNED HOME - EXP $11.86 1/31 CHURCH, MET NEW MINISTER PARKER, SNOWED AFTERNOON + EVENING 2/1 WORKED ON OGALLALA PROBLEM - 3 HRS, COURSE PREPARATION - 3 HRS 2/2 TO FT COLLINS, CONFERENCE W/ CHAMBERLAIN, MADISON, ETAL REGARDING TELESCOPE - I AM TO WORK OUT A BUILDING DESIGN FOR OBSERVATORY TALKED WITH FEAD WILL TEACH GW SPRING QUARTER, GRADED PAPERS
2/3 WORKED ON OGALLALA ANALOG STUDIES - 6 HRS, GORDON BRAUDAWAY VISITED 2/4 WORKED ON OGALLALA - 6 HRS; CE293 - 5 HRS (HOME) EXP 11.53
2/5 TO FT COLLINS CORRECTED PAPERS FOR CE293, PREPARED LESSON FOR TOMORROW 2/6 TAUGHT CLASS; RETURNED HOME, WORKED 1 HR ON OBSERVATORY ROOF DESIGN 2/7 WORKED ON WILDERNESS REVIEW PANEL REPORTS
2/8 WORKED FOR CSU ON MADISON’S WORK (OBSERVATORY) 8 HRS
2/9 WORKED 5 HRS FOR CSU (MADISON), 3 HRS ON CE293, BOLIBAUGH - HOME ELECTRIC 2/10 WORKED 3 HRS ON OBSERVATORY ROOF DESIGN; 3 HRS ON CE293 IN THE
EVENING WORKED ON HE BOOK OF WILDERNESS PANEL REPORTS
2/11 WORKED ON CE293 - 1 HR; COMPLETED BOOK OF WILDERNESS REVIEW PANEL - SENT IT TO VICE-PRESIDENT HUBERT HUMPHRIES
2/12 TO FT COLLINS, WORKED ON MADISON’S PROBLEM ALL DAY - EXPENSES $15.74 2/13 TAUGHT CLASS, RETURNED TO DENVER: 2 HRS - CE293, 2 HRS - MADISON PROBLEM 2/14 TO ENGLEWOOD W/ ULIS MIZELL ET AL TO SEE ABOUT NETS
2/18 TO FT COLLINS - MET WITH PROF MADISON ET AL, MET WITH ARCHITECT, DISCUSSED TREES
2/19 TO NURSERY AM, AT FOOTHILLS LAB (OGALLALA REPORT), CORRECTED PAPERS - 4 HRS OGALLALA, 5 HRS - CE293
2/20 TAUGHT CE293 CLASS, RETURNED HOME (2/18 8 HRS - MADISON) EX $24.57 2/21 CHURCH 2/22 WORKED FOR CSU ON THE OBSERVATORY - 10 HRS 2/25 WORK CSU - 1 HR ON CE293; 9 HRS ON OBSERVATORY
2/26 TO FT COLLINS MET W/ MADISON (OBSERVATORY, W/ BITTINGER, PREPARED A MEMO ON ASCE PAPER, SPENT TIME W/ STUDENTS + CORRECTED PAPERS UNTIL 8PM -
EXPENSES $22.89
2/28 WORKED ON A PANEL REPORTS
3/5 TO FT COLLINS - WORKED ON OBSERVATORY
3/6 TAUGHT CLASS, RETURNED HOME - EXP 16.75 - CLASS PREPARATION (CE293) - 4 HRS 3/7 CHURCH, CHERRY CREEK WITH CAROL
3/8 WORKED 1 HR ON OBSERVATORY; ELECTRICIAN - TO PLACE LIGHT, FIXTURES, SWITCHES, ETC
3/11-15 TO FT COLLINS; 3/12 - 8 HRS ON OBSERVATORY; 3/13 - TAUGHT CLASS, GRADED PAPERS, TURNED IN GRADES, WROTE LETTER ON OBSERVATORY, RETURNED HOME, EXPENSES $38.33
3/20 WORKED ON OBSERVATORY - 4 HRS; CALLED CAVEOPTICAL - GOT DIMENSIONS OF TELESCOPE, WORKED OUT [illegible], WROTE TO MADISON
3/21 DAY TRIP TO FT COLLINS WITH MARI TO TAKE GINGER BACK TO COLLEGE (CSU) 3/22-23 WORKED ON OBSERVATORY 10 HRS; 3/23 - 5 HRS OBSERVATORY, 2 HRS CE293 3/24 XRAYS YESTERDAY @ PRESBY. HOSP, WORKED ON INCOME TAX
3/26-27 TO FT COLLINS - WORKED ON OBSERVATORY; 3/27 TAUGHT 1ST CLASS, HOME EXP $20.53
3/28 CHURCH, KIM’S PIANO RECITAL IN AFTERNOON” CHERRY CREEK WITH CAROL 3/29-31 2 HRS PREP CLASS: 30 - 3 HRS PREP CLASS: 31 - PREP TIME SUMMARY FOR MADISON (OBSERVATORY) APR-JUN 1965 AT HOME: 4/1, 3-4, 9, 11, 16 (½), 18, 20-22, 5/8-9, 11, 22-23, 29-31, 6/3-4, 6, 11-13, 17-20 6/21-27 USBR: 4/1 (½), 5-8, 12-15, 19, 20 (½), 5/3-4, 5 (½); 10, 12-13, 17-18, 19 (½), 20, 5/26 (½), 28, 6/3-4, 7-8, 9 (½), 10, 21, 26 (½), 28
4/1 TO ENGLEWOOD TO TRANSFER $500 FROM TRUST FUND TO GINGER’S ACCOUNT FOR COLLEGE; COURSE PREP (CE293) - 4 HRS
4/2 WORKED 8 HRS FOR CSU - COMPLETED SOME COMPUTATIONS - WENT TO FT COLLINS - CHECKED ON OBSERVATORY, PREPARED FOR CLASS (CE293) 4/3 WITH PROF MADISON LOOKED AT POSSIBLE SITES FOR OBSERVATORY TAUGHT CLASS (G.W. TRANSIENTS), RETURNED 2/ GINGER, EXP $17.40 4/4 GINGER HOME TODAY - SNOW IN AFTERNOON
4/5-8 CONFERENCE AT BUREAU OF RECLAMATION ON WELLTON - MOHAWK + YUMA PROBLEMS
4/9 TO FT COLLINS - WORKED 8 HRS FOR CSU; SITE FOR OBSERVATORY CHOSEN BETWEEN PHYSICAL PLANT AND GREENHOUSE - THIS IS A GOOD SITE
4/10 TAUGHT CLASS (CE293), RETURNED TO DENVER - EXPENSES $16/75 4/11 CHURCH
PAPERS
4/17 TAUGHT CLASS IN CE29, RETURNED HOME BY BUS 4/18 WENT WITH KIM TO CHERRY CREEK
4/20-22 WORKED FOR CSU: 4/20 - 2 HRS, 4/21 - 4 HRS, 4/22 (ALL CE293)
4/23 TO FT COLLINS, CORRECTED PAPERS IN AFTERNOON; KIRK ALAN GLOVER BORN - HOORAY - COLO RIVER ANALOG
4/24 TAUGHT CLASS, RETURNED TO DENVER
4/25 FLEW TO BOULDER CITY NEVADA; 4/26 LISTED DATA NEEDED TO CONSTRUCT COLO RIVER ANALOG
4/27-28 TO BLYTHE CA - TO RIVER TO SEE DREDGEOWKR AND CONDITIONS
4/29 TO BOULDER CITY FOR FLIGHT HOME, PLANE HAD LEFT, FIXED UP WITH ANOTHER FLIGHT
4/30 ARRIVED HOME 1: AM; TO FT COLLINS; CLASS PREP, MET GINGER FOR SUPPER 5/1 TAUGHT CLASS RETURNED HOME
5/2 WENT TO LAKE MCNEIL ABOUT 6:45 WITH ULIS MIZELL TO SEINE CARP 5/3-5 WORKED 1 HR ON CE293, 5/4 WORKED 2 HRS - CE293, 5/5 - 4 HRS - CE293 5/5-7 TO FT COLLINS IN EVE, CORRECTED NOTES, TAUGHT CLASS, RETURNED HOME 5/9 CHURCH TO MUSIC FESTIVAL IN AFTERNOON - KIM PLAYED PIANO
5/11 WORKED ON CE293 - 3 HRS, PALLBEARER AT CAROL SANDELL’S FUNERAL, IN THE EVENING WENT TO CHERRY CREEK WITH KIM
5/12 WORKED 2 HRS ON CE293
5/13 CALLED TO GET DATA FROM TAYLOR FERRY + CEBOLA GAGES TO TEST ANALOG 5/14 TO FT COLLINS BY BUS, CORRECTED PAPERS FOR CE293
5/15 TAUGHT CLASS CE293, RETURNED HOME
5/16 DROVE TO FT COLLINS WITH MARJORIE TO ATTEND GINGER’S [DELTA]Z OPEN HOUSE
5/19 WORKED 4 HRS FOR CSU CE293
5/21 TO FT COLLINS - TAUGHT CLASS IN EVENING, WENT TO FOOTHILLS LAB TO SEE OGALLALA ANALOG
5/22 RETURNED TO DENVER 5/23 CHURCH WITH KIM
5/24-26 TO FT COLLINS ON BUS, CORRECTED NOTES ON CE293, RETURNED HOME 5/27 WENT WITH CLASS TO PROSPECT VALLEY, 8AM-3PM, RETURNED HOME 6PM BUS 5/29 HAIRCUT, WASHED WINDOWS, TOOK DOWN STORM SASH
6/1 TO FT COLLINS TO PREPARE FOR FINAL GRADES (CE293 GROUNDWATER TRANSIENTS) 6/2 EXAMINATION PERIOD 8-9AM, COMPLETED GRADES, TURNED THEM IN -
SIGNED NEW AGREEMENT, RETURNED TO DENVER
6/5 DOROTHY, CAROL NELL, CHUCK + SIFF ARRIVED HOME FROM EL PASE @ SUPPER TIME
6/6 TO CHURCH AT JOHN COLLINS WITH GINGER, TO RED ROCKS WITH CHUCK + KIM 6/12 TO CHERRY CREEK WITH CHARLES + WILLIAM IN THE MORNING
6/14 MOST OF THE DAY IN THE LIBRARY, TALKED TO G. COLBURN ABOUT THE POSSIBILITY OF A CLSAS IN GROUNDWATER MOVEMENTS
6/15 TO FT COLLINS
6/16 WORKED 8 HRS FOR CSU, SPENT DAY AT FOOTHILLS LAB, WROTE MEMO ON RECOVERY OF LEVELS IN OBSERVATION, LOOKED FOR WORK ON ARKANSAS GROUNDWATER STUDIES - COULD NOT BE FOUND, RETURNED TO DENVER, DESTRUCTIVE FLLOD DOWN TTHE SOUTH PLATTE TODAY
6/17 TRIED TO GET TO THE FEDERAL CENTER 6/18 PUT LIME ON LAWN, SPRAYED GRAPES
6/19 WENT TO CHERRY CREEK WITH CHUCK, BIFF + KIM
6/20 WENT TO PIANO RECITAL IN AFTERNOON, KIM PLAYED PIANO
6/21 DOROTHY, CAROL NELL, CHUCK + BIFF LEFT FOR EL PASE, PHONED TO SAY HOME OK
6/22 PLANTED FLOWERS
6/23 FINISHED PLANTING FLOWERS, SPRAYED GRAPES, PUT UP CABINET IN BATHROOM 6/24 MADE LEAF FOR TABLE
6/25 CAROL + I CELEBRATED 40TH ANNIVERSARY 6/27 TO CHURCH AT JOHN COLLINS WITH GINGER
JUL-SEP 1965 NO ENTRIES 7/17-25 AT HOME: 7/3-5, 10-11, 31-8/1, 6-8, 11-15, 21-22, 28-29, 9/4-6, 11-12
9/18-19, 25-26
USBR: 7/1-2, 6-9, 12-3, 16 (½), 26-28, 29 (½), 30, 8/2-4, 9, 10 (½), 16-17 8/19-20, 23-24, 25 (½), 27, 30-9/3, 8-10, 13-17, 20-24, 27-30
7/3 TO CHERRY CREEK, GINGER DROVE THE CAR 7/4 TO CHURCH WITH GINGER
7/11 WENT TO GATES TO GET GINGER SO WE COULD DO TO CHURCH, RETURNED HER TO GATES
7/14 LEFT FOR WASHINGTON DC TO RECEIVE MEDAL
7/15 AT WASHINGTON DC FOR THE CONVOCATION, RETURNED HOME 7/17-25 NO ENTRIES
7/29 AFTERNOON AT HOME RESTING
8/1 CHURCH WITH GINGER, TO WASHINGTON PARK WITH CAROL IN THE EVENING 8/5 WROTE UP PARAGRAPH ON THE TETON REPORT
8/8 TO CHURCH WITH GINGER - WALKED BECAUSE CAR NOT IN USABLE SHAPE 8/9 PHONED RAMBLER CO TO GET CAR AS THE STEERING GEAR LOCKED AFTER THEY HAD FIXED IT
8/10 FOT CAR FROM RAMBLER CITY - NO CHARGE - THEY SAY IT SHOULDN’T HAPPEN AGAIN
8/15 TO CHURCH AT JOHN COLLINS, TO CHERRY CREEK WITH HENRY HOWE 8/18 DAY TRIP TO FT COLLINS, RETURNED TO DENVER 6PM - EXPENSES $6.36 8/21 TO ENGLEWOOD FOR GROCERIES
8/22 DID NOT GO TO CHURCH BECAUSE GINGER WAS RECOVERING FROM DENTAL WORK 8/26 WENT TO TUCSON AZ ON FRONTIER AIRLINES, ARRIVED ABOUT MIDNIGHT
DUE TO PLANE FAILURE
8/27 PRESENTED PAPER ON “THE MECHANICS OF AQUIFER-SWEETENING” AT THE ASCE MEETING AT TUCSON, RETURNED ON FRONTIER - ARR 8:15 DENVER TIME 8/28 TO ENGLEWOOD FOR GROCERIES
8/29 TO CHURCH WITH GINGER IN THE MORNING
9/2 JO + TONI DEAL CAME IN THEIR BIG BUS ABOUT 4:30 PM 9/4 TOM + I WENT TO CHERRY CREEK TO TEST OUT BINOCULARS 9/5 WENT TO CHURCH WITH GINGER
9/7 TOOK GINGER TO FT COLLINS; SAW DR FEAD AND WE WENT TO THE LAB, TALKED TO LONGENBAUGH, DROVE BACK TO DENVER
9/11 TO ENGLEWOOD FOR GROCERIES, TO GOTHIC THEATER WITH MARJORIE AND KIM TO SEE CAT BALLOON
9/12 TO CHURCH AT JOHN COLLINS, TO WASHINGTON PARK WITH CAROL IN AFTERNOON, CALLD MR LUBER
9/18 PUT UP DOOR TO KITCHEN
9/19 TO CHURCH AT JOHN COLLINS, RAINY WEEKEND
9/23 ATTENDED MEETING AT ENGINEER’S CLUB - PAUL BERG SPOKE ON THE SOUTH PLATTE FLOOD CONTROL AND WATER CONSERVATION 9/25 GINGER AT HOME TODAY, WORKED 4 HRS ON THE EFFECT OF PUMPING DISTRIBUTED OVER A RECTANGLE
9/26 WENT TO CHURCH WITH GINGER AND MARJORIE - GINGER WENT BACK TO FT COLLINS AT 7PM
9/29 LAST WEEK I SAW A COMPLETE TRIAL LOAD STUDY MADE BY MACHINE- LLOYD SCRIVNER HAD THE STUDY
OCT-DEC 1965
AT HOME: 10/2-3, 9-10, 16-17, 23-24, 29, 31, 11/6-7, 11, 13-14, 19-21, 27-28, 12/4-5, 11-12, 17-19, 24-26
USBR: 10/1, 4-5, 7-8, YUMA 11-12, YUMA 13 (11 HRS), YUMA 14, 15, 18, 21-22, 25-26, 27 (½),
11/1-5, 8-10, 12, 15, 16 (5 HRS), 17, 18 (2 HRS), 22-23, 24 (½), 26, 29-12/3, 6 (½), 9-10, 13-16, 20-23, 12/27
10/2 WASHED WINDOWS, PUT UP STORM SASH
10/3 WENT WITH ULIS MIZELL TO FIX DUCK BLINDS (MCNEIL LAKE) 10/4 KIM AND I FIXED THE BACK LAWN AND MADE A DRAIN 10/6 WENT WITH CAROL TO ENGLEWOOD TO PREPARE FOR OUR
OCTOBER REPORT AS TRUSTEE - BOUGH BIG GAME LICENSE - WENT TO SEE SOCIAL SECURITY PEOPLE, MADE APPLICATION 10/9 WENT TURKEY HUNTING WITH BARBOUR AND LORD - SAW GIVE TURKEYS - DID NOT GET ANY
10/10 TO CHURCH - TO YUMA ARIZONA IN THE AFTERNOON 10/14 RETURNED TO DENVER FROM YUMA BY AIR - ARR 6 PM
10/15 PROF MADISON CALLED FROM CSU TO SAY THAT THE TELESCOPE WILL ARRIVE MONDAY. TO BE INSTALLED MONDAY AND TUESDAY 10/17 TO CHURCH A JOHN COLLINS, WITH KIM TO CHERRY CREEK 10/19 TO FT COLLINS - TALKED WITH DR FEAD ABOUT COURSEWORK - WENT WITH PROF MADISON TO INSPECT NEW OBSERVATORY AND TELESCOPE - ARRANGEMENT LOOKS GOOD THE TELESCOPE IS MOUNTED AND READY TO USE - SOME TROUBLE WITH ROOF DRIVE
10/20 MET WITH DR FEAD, HAROLD DUKE AND GEORGE COLBURN (WHO CAME UP TO ARRANGE SPECIAL COURSE IN GROUNDWATER MOVEMENTS) - TENTATIVE OUTLINE DISCUSSED FOR 12 HOURS OF INSTRUCTION - MR COLBURN
WILL ARRANGE FINAL DETAILS - RETURNED TO DENVER BY BUS 10/22 GINGER HOME FROM COLLEGE
10/24 TO CHURCH AT JOHN COLLINS WITH GINGER, KIM, CAROL + MARJORIE GINGER JOINED THE CHURCH AT THIS MEETING
10/27 CALLED DR FEAD IN THE AFTERNOON
10/27-28 OVERNIGHT TRIP TO MCNEIL LAKE WITH KIM - HUNTED IN MORNING CAUGHT 1 MALLARD - ROUND TRIP 108 MILES - VALLEY HWY TO BERT HOOD TO MCNEIL LAKE
10/29 WORKED 4 HRS ON PROBLEM OF PUMPING DISTRIBUTED OVER A RECTANGLE 10/29-30 OVERNIGHT WITH MAR LORD TO HUNT DUCK - TOO MANY TRIGGER HAPPY HUNTERS - MR LORD BAGGED ONE MALLARD - RETURNED HOM
10/31 TO CHURCH IN THE MORNING
11/6 TOOK FILMS TO ENGLEWOOD, WORKED UP NOTES FOR LECTURE ON 11/23 11/7 CHURCH, WENT WITH HENRY HOWE TO CHERRY CREEK
11/12 GINGER CAME HOME TONIGHT FROM CSU
11/13 SPENT 6 HRS MAKING COMPUTATIONS FOR CHART FOR THE EFFECT OF PUMPING OVER A RECTANGULAR AREA
11/14 TO CHURCH WITH GINGER
11/15 PROPOSED VISIT TO BOULDER CITY
11/18 PERMISSIBLE TO USE PAT HURLEY’S CORRELATION IN NEXT WEEK’S TALK 11/20 EARTHQUAKE FELT IN DENVER AT 9PM
11/21 PETUNIAS STILL IN BLOOM 11/25 GINGER AT HOME TODAY
11/26 TALKED TO DR FEAD G COLBURN SUGGESTED A HYDROLOGY SERIES TREATMENT OF GROUNDWATER MOVEMENTS
11/28 TO CHURCH WITH GINGER + CHARLES, STARTED TRIP TO BOULDER CITY (EVE) 11/29-12/1 IN BOULDER CITY - ON IMPERIAL DAM, 12/1 PM - RETURNED HOME 12/4 CALL FROM RUTH (SISTER) - ADDIE RALSTON PASSED AWAY IN ORD 12/5 CHURCH AT JOHN COLLINS
12/7-8 ATTENDED ADDIE’S FUNERAL, STAYED AT ROY’S, RETURNED HOME 12/11 WENT TO ENGLEWOOD TO MAIL CHRISTMAS PACKAGES
12/12 TO CHURCH
12/13 GINGER HOME FROM COLLEGE IN EVENING, 12/14 SNOW
12/17 TO FT COLLINS - TALKED WITH DR FEAD ABOUT NEED COURSE IN MASONRY
DAMS - A GRADUATE COURSE ON SAT. - ADJUSTMENTS NEEDED ON TELESCOPE (NO AGE LIMIT-)
12/18 HAIRCUT, GROCERIES - 8 HRS SPENT ON MASONRY DAMS COURSE 12/19 CHURCH REV PARKERS LAST DAYS - GINGER - NEW RING
12/24 WORKED 4 HRS ON PREPARATION FOR COURSE ON MASONRY DAMS 12/25 CALLS FROM MORRIS + BILL
12/26 ATTENDED LORETTA’S WEDDING - GIVER BRIDESMAID, MARJORIE SERVED @ RECEP
12/28 WENT TO UNION DEPOT FOR MORRIS + FAMILY
12/29 WORKED 2 HRS ON COURSE (CE253); 12/30 2 HRS COURSE PREPARATION 12/31 MORRIS + FAMILY LEFT FOR TENNESSEE (U.P. - SPIRIT OF ST LOUIS) - GINGER AND I TOOK THEM TO THE TRAIN
1965 ADDENDUM 1/4 USBR - 8 HRS - EVAPORATION SUPPRESSION
1/6 USBR - 2 HRS - SNAKE RIVER ANALOG, 6 HRS - EVAPORATION SUPPRESSION 1/7 USBR - 3 HRS (AFTERNOON) - EVAPORATION SUPPRESSION
1/11 USBR - 4 HRS (MORNING) - AQUIFER SWEETENING PROBLEM 1/12-13 USBR - 4 HRS (BOTH DAYS) - AQUIFER SWEETENING PROBLEM
1/18 USBR - 8 HRS - NEBRASKA MID-STATE PROBLEM (JOB #37-7-1033-73-30-01) CALL FROM JOHN SPENCER - MESSELI WILL MAKE WILDERNESS
PUBLICATION
1/20 USBR - 2 HRS - AQUIFER SWEETENING, 2 HRS - EVAPORATION SUPPRESSION TO FEDERAL CENTER IN AFTERNOON - OBTAINED CHECK OF OBSERVED EXPERIMENTAL SALINITIES WITH PREVIOUSLY COMPOSED SALINITIES IN THE FORST PUMPED 2 PART AQUIFER TEST
1/25-26 USBR - 4 HRS - EVAPORATION SUPPRESSION (4 HRS BOTH DAYS) 2/15 USBR - 3 HRS - FOR JOHN MALETIC, 5 HRS - EVAP. SUPPRESSION 2/16 USBR - 2 HRS - PORTALES, 6 HRS - EVAPORATION SUPPRESSION 2/17 USBR - 8 HRS - PORTALES PROBLEM
NEBRASKA (#37-7-1033-73-30-01); AM CONFERENCE 2/24 USBR - 8 HRS - PORTALES
3/1 USBR - 4 HRS - AQUIFER SWEETENING, 4 HRS - DRAINAGE + GW (CC 700 - GENERAL STAFF #71-0-9300-0-2-1)
3/2 USBR - 8 HRS - MID-STATE NEBRASKA ANALOG DESIGN
3/3 USBR - 4 HRS - MID-STATE NEBRASKA, 4 HRS - DRAINAGE + GW 3/4 USBR - 4 HRS - DRAINAGE + GW PROBLEMS
3/9 USBR - 4 HRS - DRAINAGE + GW, 1 HR - PORTALES, 3 HRS - FOR HIGGINSON ON ROCK PROPERTIES
3/10 USBR - 8 HRS - DRAINAGE + GW
3/16 USBR - 4 HRS - PROTALES, 4 HRS - WITH AUSTIN ON WALL EXP. 3/17 USBR - 4 HRS - AQUIFER SWEETENING, 4 HRS - MEXICAN SALINITY 3/18 USBR - 8 HRS - MEXICAN SALINITY
3/19 USBR - 2 HRS - AQUIFER SWEETENING (CC 242), 2 HRS - MEXICAN SALINITY 3/25 USBR - 8 HRS - LOWER COLO RIVER GW RECOVER RIVER REGULATION - (JOB #21-3-423-00-09-01, CC242)
3/29 USBR - 4 HRS - MEXICAN SALINITY 3/31 USBR - 8 HRS - MEXICAN SALINITY
4/1 USBR - 4 HRS - MEXICAN SALINITY PROBLEM
4/5-8 USBR - 8 HRS - MEXICAN SALINITY (8HRS EACH DAY) - CONFERENCES ON WELLTON - MOHAWK AND YUMA PROBLEMS
4/12 USBR - 8 HRS - MEXICAN SALINITY
4/13 USBR - 2 HRS - MEIXCAN SALINITY, 6 HRS - EVAP. SUPPRESSION 4/14-15 USBR - 8 HRS (BOTH DAYS) - EVAPORATION SUPPRESSION 4/19 USBR - 4 HRS - LAKE GLACE PROJECT (JOB #11-8-585-72-C1-O1), 4 HRS - MEXICAN SALINITY
4/20 USBR - 4 HRS - MEXICAN SALINITY
5/3-4 USBR - 8 HRS (BOTH DAYS) - ON COLORADO RIVER ANALOG 5/5 USBR - 4 HRS - COLORADO RIVER ANALOG
5/10 USBR - 8 HRS - COLORADO RIVER ANALOG
5/12-13 USBR - 8 HRS - (BOTH DAYS) - COLORADO RIVER ANALOG
5/17 USBR - 3 HRS - MARIA’S UNIT (MRBP) (JOB #37-6-988-73-10-01, CC 700) 5 HRS - COLORADO RIVER ANALOG
5/18 USBR - 4 HRS - REVIEWING PAPERS (JOB #71-0-9307-00-06-01, CC242, 4 HRS - COLORADO RIVER ANALOG
5/19 USBR - 2 HRS - ON MARIAS UNIT, 2 HRS - COLORADO RIVER ANALOG 5/20 USBR - 8 HRS - COLORADO RIVER ANALOG
5/26 USBR - 3 HRS - COLORADO RIVER ANALOG 5/28 USBR - 8 HRS - COLORADO RIVER ANALOG
6/3 USBR - 8 HRS (BOTH DAYS) - COLORADO RIVER ANALOG
6/7 USBR - 4 HRS DRAINAGE + GW, 4 HRS - COLORADO RIVER ANALOG
NEBRASKA ANALOG, 4 HRS - MEXICAN SALINITY
6/9 USBR - 4 HRS - MEXICAN SALINITY (MADE COMPUTATION ON YUMA MESA MOUND +CONDUIT NO. 1 PUMPS)
6/10 USBR - 4 HRS - MEXICAN SALINITY, 4 HRS - COLORADO RIVER SALINITY 6/21 USBR - 4 HRS - COLORADO RIVER ANALOG - CAME HOME ON 12:30 PM BUS - DUE TO FLOOD CONDITIONS, WAITED ANOTHER HOUR FOR #3 BUS 6/28 USBR - 2 HRS - COLORADO RIVER ANALOG, 6 HRS FOR DRAINAGE + GW ON SWEETENING OF AQUIFER
6/29-30 USBR - 8 HRS - COLORADO RIVER ANALOG - REPRESENTATIVE IN FROM BOULDER CITY TODAY (8 HRS BOTH DAYS)
1965 ADDENDUM 7/1-2 USBR - 8 HRS (BOTH DAYS) - COLORADO RIVER ANALOG 7/6 USBR - 8 HRS - COLORADO RIVER ANALOG
7/7 USBR - 8 HRS - ON TECHNICAL PAPERS
7/8 USBR - 6 HRS - ON TECHNICAL PAPERS, 2 HRS - COLORADO RIVER ANALOG 7/9 USBR - 8 HRS - COLORADO RIVER ANALOG
7/12-13 USBR - 8 HRS - COLORADO RIVER ANALOG - TALKED TO SMITH AT BOULDER CITY ABOUT HARDER’S SUGGESTIONS
7/14-15 LEFT FOR WASHINGTON DC TO RECEIVE MEDAL + ATTEND CONVOCATION - RETURNED HOME
7/16 USBR - 4 HRS - COLORADO RIVER ANALOG
7/26 USBR - 4 HRS - COLORADO RIVER ANALOG, 4 HRS - WITH MR THOMAS, (JOB #84-0-2305-1-1-1)
7/27 USBR - 4 HRS - EVAPORATION SUPPRESSION, 4 HRS - COLO RIVER ANALOG 7/28 USBR - 6 HRS - MIO-STATE, 2 HRS - TECHNICAL PAPERS
7/29 USBR - 4 HRS - TECHNICAL PAPERS; SPENT AFTERNOON AT HOME RESTING 7/30 USBR - 8 HRS - TECHNICAL PAPERS
8/2 USBR - 2 HRS - PORTALES, 2 HRS - MIO STATE, 2 HRS - TECHNICAL PAPERS, 2 HRS - COLORADO RIVER ANALOG
8/3-4 USBR - 8 HRS - (BOTH DAYS) - COLORADO RIVER ANALOG 8/9 USBR - 4 HRS - SNAKE RIVER, 4 HRS - COLORADO RIVER ANALOG 8/10 USBR - 2 HRS - SNAKE PLAIN, 2 HRS - COLORADO RIVER
8/16 USBR - 8 HRS - PORTALES ANALOG - CONFERENCE ON BOUNDARY CONDITIONS 8/17 USBR - 2 HRS - TECHNICAL PAPERS, 2 HRS - COLORADO RIVER ANALOG,
4 HRS - PORTALES; REP FROM MANHATTAN UNIV TO TALK ABOUT GW 8/19 USBR - 2 HRS - TECHNICAL PAPER, 2 HRS - COLORADO RIVER ANALOG, 4 HRS - SNAKE RIVER - VISITOR FROM ISRAEL IN TODAY
8/20 USBR - 6 HRS - COLORADO RIVER, 2 HRS - TECHNICAL PAPERS
4 HRS - ON TECHNICAL PAPERS
8/24 USBR - 8 HRS - STUDY OF DRAFT TUBE SURGES 8/25 USBR - 3 HRS - SNAKE RIVER, 1 HR - COLORADO RIVER
8/26 USBR - 2 HRS - DRAFT TUBE SURGES, 6 HRS - ON TECHNICAL PAPERS, WENT TO TUCSON VIA FRONTIER AIRLINES - ARRIVED ABOUT MIDNIGHT - PLANE FAILURE TURNED ON 8 HRS - (JOB #71-0-9803-01-01-01) - TECHNICAL PAPERS
8/27 USBR - 8 HRS - TECHNICAL PAPERS, PRESENTED THE PAPER ON “THE MECHANISM OF AQUIFER SWEETENING” AT TUCSON - RETURNED HOME 8/30 USBR - 8 HRS - DRAFT TUBE SURGE
8/31 USBR - 6 HRS - DRAFT TUBE SURGE, 2 HRS - COLORADO RIVER
9/1 USBR - 4 HRS - COLORADO RIVER, 4 HRS - DRAFT TUBE SURGE, (JOB # CHANGED TO 18-01-801-76-06-17)
9/2-3 USBR - 8 HRS - DRAFT TUBE SURGE PROBLEM (8 HRS BOTH DAYS) 9/8-10 USBR - 8 HRS - (EACH DAY) - COLORADO RIVER PROBLEM
9/13 USBR - 4 HRS - DOTOMAL RIVER STUDIES (JOB #85-0-2435-1-1-1), 4 HRS - DRAFT TUBE SURGE
9/14 USBR - 2 HRS - COLORADO RIVER ANALOG, 6 HRS - DRAFT TUBE SURGE, 1 HR - WITH AIR ABRAHAM MERCADO OF ISRAEL (JOB #71-0-9307-0-2-1 FOREIGN VISITORS) 9/15 USBR - 2 HRS - ROCK MECHANICS RESEARCH (JOB #18-0-801-76-11-11, CC813, 2 HRS - DRAFT TUBE SURGE, 4 HRS - COLORADO RIVER ANALOG
9/16 USBR - 4 HRS - COLORADO RIVER, 4 HRS - DRAFT TUBE SURGES
9/17 USBR - 4 HRS - COLORADO RIVER ANALOG, 4 HRS - DRAFT TUBE SURGES 9/20 USBR - 2 HRS - DRAFT TUBE SURGE, 6 HRS - COLORADO RIVER
9/21 USBR - 6 HRS - MID-STATE, 2 HRS - COLORADO RIVER
9/22-24 USBR - 8 HRS (EACH DAY) - COLORADO RIVER ANALOG; ATTENDED MEETING AT ENGINEER'S CLUB - SPEAKER GAVE A TALK ON THE SOUTH PLATTE FLOOD CONTROL AND WATER CONSERVATION
9/27 USBR - 1 HRS - ROCK MECHANICS RESEARCH, 7 HRS COLORADO RIVER ANALOG
9/28 USBR - 4 HRS - COLORADO RIVER, 4 HRS - ROCK MECHANICS RESEARCH 9/29 USBR - 8 HRS - ROCK MECHANICS RESEARCH
9/20 USBR - 4 HRS - ROCK MECHANICS, 4 HRS - COLORADO RIVER 1965
ADDENDUM
10/1 USBR - 4 HRS - ROCH MECHANICS, 4 HRS - COLORADO RIVER; CONFERENCE ON YUMA AREA GEOLOGY, 2ND CONFERENCE ABOUT A MACHINE
PROGRAM FOR COLORADO RIVER FLOWS 10/4 USBR - 8 HRS - ROCK MECHANICS
10/5 USBR - 2 HRS - COLORADO RIVER, 6 HRS - ROCK MECHANICS 10/6 NO WORK FOR THE BUREAU TODAY
10/7 USBR - 6 HRS - MEXICAN SALINITY, 1 HR - ROCK MECHANICS, 1 HR - COLORADO RIVER
10/8 USBR - 2 HRS - POTOMAC PROBLEM, 6 HRS - MEXICAN SALINITY 10/11 USBR - 8 HRS - AT YUMA ON CONDUIT
10/12 USBR - 8 HRS - AT YUMA ARIZONA ON CONDUIT #1 - CHARGE TO GW RECOVERY (JOB #21-3-423-00-09-01)
10/13 USBR - 11 HRS - ON CONDUIT #1 AT YUMA ARIZONA
10/14 USBR - 8 HRS - CONDUIT #1, YUMA - RETURNED HOME BY AIR 10/15 USBR - 8 HRS - ON YUMA GW RECOVERY
10/18 USBR - 4 HRS - YUMA WATER RECOVERY, 4 HRS - COLORADO RIVER 10/19 CSU -WORKED ON EFFECTS OF PUMPING IN A RECTANGLE IN THE AM 10/21 USBR - 2 HRS - SNAKE RIVER, 2 HRS - ROCK MECHANICS, 4 HRS - COLO RIVER 10/22 USBR - 4 HRS - COLORADO RIVER, 4 HRS - YUMA WATER SALVAGE
10/25 USBR - 8 HRS - ON YUMA WATER SALVAGE
10/26 USBR - 2 HRS - COLORADO RIVER, 6 HRS - YUMA WATER SALVAGE 10/27 USBR - 4 HRS - YUMA WATER SALVAGE
10/28 USBR - NO WORK TODAY
11/ 1 USBR - 8 HRS - YUMA WATER SALVAGE
11/2 USBR - 4 HRS - EVAPORATION SUPPRESSION, 4 HRS - COLORADO RIVER 11/3 USBR - 4 HRS - YUMA WATER SALVAGE, 4 HRS - COLORADO RIVER 11/4 USBR - 4 HRS - YUMA WATER SALVAGE, 4 HRS - COLORADO RIVER 11/5 USBR - 8 HRS - YUMA WATER SALVAGE
11/8 USBR - 8 HRS - COLORADO RIVER
11/9 USBR - 4 HRS - YUMA WATER SALVAGE, 2 HRS - DRAFT TUBE SURGE, 2 HRS - ON COLORADO RIVER
11/10 USBR - 2 HRS - PORTALES, 2 HRS - YUMA WATER SALVAGE, 2 HRS - COLORADO RIVER, 2 HRS - DRAFT TUBE SURGE
11/12 USBR - 8 HRS - ON PORTALES
11/15 USBR - 6 HRS - PORTALES, 2 HRS - COLORADO; LEFT SKETCH + BATES’ COPY OF PAPER ON LAB DRAFT TUBE ARRANGEMENT WITH MARTIN -
DISCUSSED PROPOSED VISIT TO BOULDER CITY
11/16 USBR - 1 HR - COLORADO RIVER, 4 HRS - ON PORTALES 11/17 USBR - 8 HRS - DRAFT TUBE SURGE
11/18 USBR - 2 HRS - DRAFT TUBE SURGE - WENT HOME WITH THE FLU - RECEIVED PERMISSION TO USE PAT HURLEY’S CORRELATION IN MY TALK ON TUESDAY
11/22 USBR - 1 HR - PORTALES, 4 HRS - YUMA WATER RECOVERY, 3 HRS ON SUGGESTION BY L.G. MOORE (JOB #21-4-526-1-3-2)
11/23 USBR - 4 HRS - DRAFT TUBE SURGE, 4 HRS - YUMA WATER SALVAGE
11/24 USBR - 3 HRS - YUMA WATER SALVAGE, 1 HR - MONOGRAPHS (JOB #71-0-9307- 0-7-1, CC931)
11/26 USBR - 4 HRS - MONOGRAPHS, 4 HRS - COLORADO RIVER
11/29-12/1 USBR - 8 HRS (EACH DAY) - AT BOULDER CITY TO WORK ON THE PROBLEM OF PROGRAMMING PARKER RELEASES TO MEET DEMANDS AT
IMPERIAL DAM - RETURNED TO DENVER IN PM 12/2 USBR - 4 HRS - COLORADO RIVER
12/3 USBR - 2 HRS - YUMA WATER SALVAGE, 6 HRS - MONOGRAPHS
12/6 USBR - 4 HRS - YUMA WATER SALVAGE, CONFERENCE ON YUMA SITUATION LATER, AT HOME CALLED DR FEAD
12/9 USBR - 5 HRS - COLORADO RIVER, 1 HR - MONOGRAPH 31, 2 HRS - EVAPORATION SUPPRESSION
12/10 USBR - 4 HRS - YUMA WATER SALVAGE, 4 HRS - EVAP. SUPPRESSION 12/13 USBR - 2 HRS - YUMA WATER SALVAGE; 6 HRS - EVAP. SUPPRESSION 12/14 USBR - 4 HRS - YUMA WATER SALVAGE, 4 HRS - EVAP. SUPPRESSION
12/15 USBR - 7 HRS - EVAPORATION SUPPRESSION, 1 HR - YUMA WATER SALVAGE 12/16 USBR - 5 HRS - EVAPORATION SUPPRESSION, 2 HRS - YMA WATER SALVAGE, 1 HR - DRAFT TUBE SURGE
12/20-23 USBR - 8 HRS (EACH DAY) - ON EVAPORATION SUPPRESSION
12/27 USBR - 4 HRS - COLORADO RIVER, 4 HRS - EVAPORATION SUPPRESSION Sunday, April 4, 1965
94th Day-271 days to follow At home at 1936
South Lincoln St Ginger was home today
Snow on afternoon REG 5-5-65
Monday, April 5, 1965 95th Day-270 days to follow Worked 8 hours for
the Bureau of Reclamation on Mexican salinity
REG [illegible] on today
says they can [illegible] 250 ft/sec [illegible] with 185000 hr/yr
salinity on convergence channel 100 AZ/SEC 3500 ppm 200 4000 to k500 ppm (?) 250 5000 ppm (?) 300 6000 ppm Cannel [illegible] 380
Winter to 280 ft/sec summer Base flow 600 ft/sec at 1200 ppm [illegible]
3 pumps 30 p3/sec 2200 ppm 5” 40 “ 2300 ppm
Sunday, April 18, 1965 108th Day-257 days to follow
Easter Sunday At home at 1936 So
Lincoln St except in the afternoon when Kim and I Went to Cherry Creek Reservoir REG 4-19-65
Monday, April 19, 1965 109th Day-256 days to follow Worked 8 hours for
The Bureau of Reclamation 4 hr on Lake Gree Project job no 11-8-585-72-61-01.’ 4 hr on Mexican Salinity REG Wednesday, June 9, 1965 160th Day-205 days to follow Worked 4 hours
for the Bureau of Reclamation on Mexican salinity (Made computations on Yuma Mesa mound and II consult No 1 pumps)
REG
Thursday, June 10, 1965 161st Day-204 days to follow Worked 8 hours for
The Bureau of Reclamation 4 hr on Mexican Salinity 4 hr on the Colorado River analog. REG 6-11-65 Sunday, November 28, 1965 332nd Day-33 days to follow Want to church at
Jolen calling with Ginger and Charles. In the evening started trip to Boulder City. REG 12-2-65
Monday, November 29, 1965 333rd Day-32 days to follow At Boulder City to
work on the presentation of programming [illegible] [illegible] to [illegible] demands at proposal day
REG 12-2-65 8 hr for the Bureau of Reclamation Telephone Numbers Pat Fabry 8021 Cost center 242 MC 756 Addresses Portales - [illegible] Studies
12-5-1057-73-30-01 CC 242
Memoranda Nebraska Mid State
37-7-1033-73-30-01 Jan 17 1965
Aquifer Sweetening 17-0-801-76-59 Mar 16 1965
Colorado River Analog 51-3-423-22-22-01 C.C. 242
Technical Papers 71-0-9307-00-06-01’ Draft tube surge 18-01-801-76-06-17 CC 3741 New No 9-1-65 END TRANSCRIPTION