Advance Notice Denver, Colorado, September 20, 1961.

To all prospective bidders for construction of Blue Mesa Dam and Power-plant, Curecanti Unit, Gunnison Division, Colorado River Storage Project.

It is anticipated that invitation for bids for construction of Blue Mesa Dam and Powerplant will be issued in December 1961.

Inasmuch as weather conditions at the time of issuance of specifications may make access to and examination of the site of the proposed work difficult, prospective bidders are invited to inspect the site in the near future, in order that they will be informed and in a position to submit a bid when the work is advertised. The approximate location of the work is shown on the attached location map.

The work will consist of construction of an earthfill dam 350 feet high and 800 feet long at the crest with a 16-foot diameter outlet tunnel, a 21-foot-diameter spillway tunnel, a powerplant constructed for installat10n of two 30, 000-kilowatt generating units, construct10n of 1. 1 miles of powerplant service road, and relocation of 4. 7 miles of State Highway No. 92. The generating units will be installed under a separate contract.

The principal items of work and the approximate quantities are as follows: 700, 000 cu yd 61. 000 cu yd 1, 000, 000 cu yd 2, 100, 000 cu yd 30, 000 cu yd 25, 000 cu yd 4,000,000 pounds 1, 000,000 pounds 900 lin ft

Excavation in open cut Excavation in tunnels

Earthfill in dam embankment

Rock and gravel fill in dam embankment Concrete in structures

Concrete in tunnel linings Reinforcing steel

Structural steel

Steel penstock, 16-foot-diameter Time allowed for completion: 1, 400 days.

The quantities listed above will necessarily be revised as detail plans and specifications are completed.

(2)

Prospective bidders wishing to visit the site are advised to contact James D. Seery, Project Construction Engineer, Bureau of Reclamation, Post Office

Box 179, Gunnison, Colorado.

Attachment

2

GRANT BLOODGOOD Assistant Commissioner and Chief Engineer

(3)

R 94W R 93W R 91W R90W R 69W R.88W R.87W R 66W SCALE OF lollLES EXPLANATION PAVfO UNCLASSIFIED UNITED STATES

0£,-,UtTMENT o, THE INTElflOlt

BUREAU OF lfECLAMATION

R &5W

COLORADO RIVER STORAGE PROJECT GVNNISON OIVISION-CVRECANTI VNIT·COLO/IIAOO

BLUE MESA DAM

KEY MAP LOCATION MAP

OltfAWN- WW o ___ auetwlTTEO- - - --- ' " ' - - - • - • • - · - - - -...

----W ----W ·- /lt6CQMMEfVOED- - - - -

-CH~CKEO

OENVElt,CQL.OltAOO

References

Related documents

46 Konkreta exempel skulle kunna vara främjandeinsatser för affärsänglar/affärsängelnätverk, skapa arenor där aktörer från utbuds- och efterfrågesidan kan mötas eller

The increasing availability of data and attention to services has increased the understanding of the contribution of services to innovation and productivity in

Generella styrmedel kan ha varit mindre verksamma än man har trott De generella styrmedlen, till skillnad från de specifika styrmedlen, har kommit att användas i större

I regleringsbrevet för 2014 uppdrog Regeringen åt Tillväxtanalys att ”föreslå mätmetoder och indikatorer som kan användas vid utvärdering av de samhällsekonomiska effekterna av

Denna genomgång kommer vi att kunna koppla till vår första frågeställning, vilket handlingsutrymme upplever sig socialsekreterarna ha när det gäller att inkludera barnperspektivet i

Re-examination of the actual 2 ♀♀ (ZML) revealed that they are Andrena labialis (det.. Andrena jacobi Perkins: Paxton & al. -Species synonymy- Schwarz & al. scotica while

Samtidigt som man redan idag skickar mindre försändelser direkt till kund skulle även denna verksamhet kunna behållas för att täcka in leveranser som

The EU exports of waste abroad have negative environmental and public health consequences in the countries of destination, while resources for the circular economy.. domestically