Item Metadata
Collection: Glover (Robert E.) Papers Author: Glover, Robert E. (Robert Ellsworth) Title: 1961, copies
Date: 1961
File Name: WREG02911.pdf Date Transcribed: December 2020 Editors: Trista Barker
Transcription Platform: Microsoft Word BEGIN TRANSCRIPTION JAN-APRIL 1961 Age: (65) AT HOME: 1/1-2, 7-8, 13, 21-22, 28-29, 30-31, 2/2(½), 5, 14, 18, 22, 25-26, 3/4-5, 12, 18-19, 24-28, 4/6, 15-16, 29 USBR: 1/3, 9, 13. 16, 18-20, 23-27, 2/6-10, 13, 17, 20-21, 27-3/3, 6-10, 3/13-17, 20-23, 29-31, 4/3+4, 11 (½)-12 (½), 13-14 (½), 20, 24 USGS:
CSU: 1/3-6 (ARS @ HOME), 10-12, 17, 2/1-2 (½), 3, 15-16, 23-24, 4/7, 4/10-11 (½), 17-19, 21, 25-28 NO ENTRIES: -
BOOKS RETURNED: 2/21
1/1 TOOK GINGER AND KIM TO SEE “GOLIATH AND THE DRAGON” (PM) 1/2 TOOK CAROL TO SEE AL HAGLUND AND FAMILY
1/2 DAVID AND CAROLINE VISITED W/ GARY AND RODGER 1/14 BIRD CLUB HIKE @ BARR LAKE
1/15 TOOK GINER AND KIM TO THEIR AUDITIONS (PIANO) 1/25 SLIDE SHOW OF WILDERNESS TRIP @ NOON
1/29 TOOK CAROL TO CHERRY CREEK DAM - MARY, GINGER/KIM - CENTER CITY W/ BILL MINTER 2/1 WENT W/ P. ALEXANDER TO TAKE PHOTOGRAPHS @ CHERRY CREEK DAM
2/4 BIRD CLUB HIKE - WATERTON AND VICINITY 2/11 BIRD CLUB HIKE - BARR LAKE
2/12 CHURCH W/ KIM - CUB SCOUT TROOP TOOK PART IN SERVICE 2/14 WORKED ON INCOME TAX
2/25 BOUGHT RING FOR CAROL’S BIRTHDAY PRESENT 2/26 WENT TO CHURCH W/ KIM
3/4 BOUGHT FILM
3/5 WENT TO CHURCH W/ KIM
3/8 LIST OF ATTENDEES @ CONFERENCE
3/11 DENTAL APPOINTMENT; REPLACED DAYLILIES 3/25 DR TREATED ENLARGED VEIN
3/26 WENT TO HEAR KIM PLAY @ RECITAL
3/27 WENT TO FEDERAL CENTER, TALKED W/ SEVERAL MEN - NO WORK 3/29 2nd VEIN TREATMENT
4/1 3RD VEIN TREATMENT
4/2 WENT TO VISIT BILL MINTER W/ CAROL
4/5 WENT TO FEDERAL CENTER TO DELIVER CHARTS - NO WORK (TO REG 7-5, PLATTE) 4/8 5th VEIN TREATMENT - 4/12 NO MORE TREATMENTS FOR 1 MONTH
4/9 ATTENDED MUSIC FESTIVAL @ AUDITORIUM - WHERE GINGER/KIM PLAYED PIANOS 4/10 CAROL SICK IN AM: 4/15 HAIRCUT: 4/22 CUT GRASS, RAKED LEAVES, SPADED GARDEN 4/23 MCNEIL LAKE W/ STONE
4/24 SNOW
4/28 CALL FROM OAK RIDGE
4/29 MOWED LAWN FIXED GARDEN, FERTILIZED; 4/30 MCNEIL LAKE W/ OLLIE PARKER - CAUGHT CATFISH MAY-AUG 1961 AT HOME: 5/10, 12, 20-21, 28-30, 6/3-4, 6, 10, 18, 23-25, 7/4, 6, 8-9, 15-16 7/21-23, 29-30, 8/6, 19, 22 USBR: 5/1-5, 11, 19, 5/31-6/2, 5, 7-9, 6/16, 19-22, 26-30, 7/3, 5, 7, 7/10-12, 14, 17-20, 24-28, 31-8/4, 7-11, 14-18, 21(½), 24 USGS: CSU: 5/12 (ARS), 22-26 UNION CARBIDE: 8/21 (½), 22-23 (½), 25 NO ENTRIES: 7/1-2, 9/10 BOOKS RETURNED: 5/5, 6/1, 9, 20, 7/26, 8/16
5/6 (SISTER) LAURA CALLED TO SAY MOTHER IN HOSPITAL, HAD HEART ATTACK IN ORD (NE)
5/7 WENT TO ORD, MOTHER SEEMED BETTER 5/8 DINNER @ ADA AND ADDOES - MOTHER BETTER
5/9 LEFT ORD - ARRIVED DENVER 9:10 PM - CAROL MET ME AT AIRPORT 5/10 HOME W/ SORE THROAT
5/12 MOTHER PASSED AWAY - FLEW TO SCOTTSBLUFF - DROVE TO ORD 5/13 ARR ORD ABOUT DAY BREAK - SISTERS ARRIVED LATER
5/14 AT ORD NEBRASKA 5/15 MOTHER’S FUNERAL 5/16 ARRANGED FOR MARKER 5/17 FURTHER ARRANGEMENTS
5/18 DRIVEN TO GRAND ISLAND TO CATCH THE FLIGHT HOME 5/27 MADE SHELVES W/ GINGER’S HELP
5/29 REMOVED STORM WINDOWS, WORKED AROUND HOUSE 6/3 TO TOWN
6/6 WORKED ON PAPER FOR AAAS MEETING IN DEC. PHYSICAL CHECK-UP - OK 6/10 MOWED LAWN, SPRAYED GRAPES - COMPLETED ESTIMATES FOR OAK RIDGE 6/11 MCNEIL LAKE W/ STONE AND LANGHORNE
6/12-15 MEETINGS ON CONCRETE RESEARCH @ FT COLLINS
6/17 FINISHED WORK FOR OAK RIDGE AND MAILED OFF; DEEDS TO LAURA; HAIRCUT LAWN WORK 6/23 CALL FROM BILL - DAUGHTER TRACY BORN; CARPENTER WORK/PAINT BSMT BEDROOM 6/24 ESTIMATE ON GLASS BRICK FOR BASEMENT ROOM
6/25 WEDDING ANNIVERSARY - TOOK CAROL FOR DRIVE TO CHERRY CREEK DAM 6/30 FIELD TRIP TO BIG DRY CREEK AREA
7/4 LEGION DISPLAY @ DU STADIUM W/ CAROL, GINGER AND KIM 7/9 MORRIS AND FAMILY ARR FOR VISIT - 7/23
7/13 MCNEIL LAKE W/ MORRIS: 7/16 CHURCH W/ MORRIS
8/5 FLASH FOR REPAIR, PD GUEST FEEL TO MIZELL, SWIM @ WHITE SANDS W/ KIM 8/12-13 SWIMMING W/ KIM @ WHITE SANDS
8/15 CALLED RUTH AND ARLIE (SISTER AND BROTHER-IN-LAW) 8/18 CALL FROM UNION CARBIDE
8/19 LAID TILE IN GINGER’S ROOM, MOWED LAWN
8/20 HIKE TO JAMES LAKE ON JAMES PEAK W/ MOUNTAIN CLUB 8/23 TO COLO COSTUME CO TO PICK UP A PAIR OF CHAPS 8/26-9/2 POPO AGIE WILDERNESS AREA; HOME 9/3 SEPT-DEC 1961
AT HOME: 9/4, 17-18, 22-24, 10/1, 5-6 (PCA JOB), 7 (COMPLETED PCA JOB), 8,
10/15, 21-29, 11/2, 10, 12, 18-19, 23, 25-26, 12/2-3, 9-10, 12, 16-18, 20, 23-25 AND 12/31 USBR: 9/6 (½), 8, 11-15, 19-21, 25-29, 10/2-4, 9-13, 16-20, 30(½)
10/31-11/1, 3, 6-9, 13-17, 20-22, 27-12/1, 4-8, 11, 13, 15, 17, 21-22, 26-28 USGS: 10/30*
UNION CARBIDE [OAK RIDGE]: 9/5 (½), 9/7 COMPUTATIONS COMPLETED, 9/9, REPORT SENT
NO ENTRIES: 9/10
BOOKS RETURNED, 10/12, 12/11, 22, 26, 27
9/3 RETURNED HOME FROM POPO AGIE WILDERNESS TRIP 9/7 OAK RIDGE COMPUTATIONS COMPLETED
9/9 HAIRCUT, PRINTS MADE AND REPORT SENT TO UNION CARBIDE, BOUGHT CAMERA ATTACHMENT 9/15 LAST DAY IN OFFICE FOR LOISPOLS
9/16 MCNEIL LAKE W/ OLLIE PARKER - SAW 3 GOLDEN EAGLES
6/19 TALKED TO ELECTRICIAN BOLIBAUGH ABOUT A CIRCUIT FOR HEATER 9/20 TOOK PICTURES OF CARTOONS (POPO AGIEZ)
9/22 WORKED ON PAPER (DRAINS)
9/28 MORRIS SKINNER DOWN FROM CSU TO DISCUSS PAPER OF GW STORAGE 9/30 MCNEIL LAKE W/ RAY WINGER, LLOYD TIMBLIN - FISH WOULD NOT COOPERATE 10/7 COMPLETED PCA JOB(?), HAIRCUT, MOWED LAWN, CALLED RUTH RE: CEDAR CHEST 10/8 WENT TO AUDITION (PIANO) IN AFTERNOON WITH KIM
10/14 BOUGHT COAT, GLOVES AND HAT 10/15 TOOK DRIVE TO CHERRY CREEK DAM
10/21 WASHED WINDOWS, PUT ON STORM WINDOWS, HAIRCUT
10/22 CELEBRATED GINGER’S BIRTHDAY, BILL MINTER BROUGHT STEAKS, CHARCOAL 10/23 TOOK CAROL TO DR; ALSO SAMPLES TO COMPLETE MY TESTS
10/24-29 SPENT IN OAK RIDGE
10/30 RETURNED CORRESPONDENCE ON STREAM DISPERSION BY REG 11/2 CORRESPONDENCE, LIBRARY
11/4 TO TOWN TO EXCHANGE BUSHNELL TELEPHOTO ATTACHMENT 11/5 MCNEIL LAKE W/ ULIS MIZELL TO PUT IN DUCK BLINDS
11/5 TO SPENCERS HOUSE TO REVIEW SLIDES OF POPO AGIE TRIP
11/11 PHEASANT HUNTING NEAR BYERS W/ SAM HOOD, RICHARDSON, STONE [1 PHEASANT] 11/21 ATTENDED A LECTURE SLIDESHOW BY DR. HAGER - CANYON DUCHELLY AREA
11/24 RETURNED BUSHNELL TELEPHOTO ATTACHMENT - NOT WORKING 11/25 KIM GOT GLASSES IN MORNING - MOVIE IN AFTERNOON
11/25 SENT REVIEW OF PAPER ON “ANALOG MODELS FOR FLOOD CONTROL SYS TO ASCE (BY JA ARDER) 11/26 PRESBYTERIAN CHURCH IN MORNING
12/2 HAIRCUT
12/7 PROPOSED CONTACT W/ UNION CARBIDE AND LETTER FROM USGS - NO CONFLICT
12/12 WORKED ON PAPER “PARALLEL DRAINS FROM LA PLACE STANDPOINT” FOR CSU (MIGHT OFFER COURSE SPRING) SEMINAR
12/16 GOT NEW TELEPHOTO LENS
12/17 BOUGHT CHRISTMAS TREE - 12/18 MADE OUT [CHRISTMAS] CARDS (PAYMENT AS TRUSTEE OF MOTHER’S ESTATE)
12/30 ATTENDED MEETINGS AT HILTON - PAPERS PRESENTED 1961 ADDENDUM
1/3 USBR - 1 HR ON DAMS, 1 HR ON STRUCTURES; IN THE AFTERNOON WORKED 4 HRS FOR ARS ON GROUNDWATER MOUNDS
1/4-6 8 HRS FOR ARS - WORK DONE EACH DAY AT HOME
1/9 USBR - 1 HR ON DAMS, 7 HRS ON STRUCTURES; CALLED MR MUCKLE AT FT COLLINS, SAYS TO GO AHEAD WITH THE CONSTRUCTION OF CHARTS FOR THE MOUND - WILL CHECK ON FUNDS
1/10-12 8 HRS FOR ARS - WORK DONE AT HOME
1/13 USBR -1 HR EVAPORATIVE SUPPRESSION; 6 HRS ON STRUCTURES; TALKED WITH CECIL OSBORN - HE PUTS CONSUMPTIVE USE AT 1 FOOT PER ACRE - THINKS ⅔ RETURN MAY BE REASONABLE
1/16 USBR - 2 HRS ON EVAPORATIVE SUPPRESSION, 6 HRS ON STRUCTURES
1/17 WORKED 8 HRS (AT HOME) FOR A.R.S - COMPLETED WORK ON DEVELOPMENT FOR DETERMINING AQUIFER PROPERTIES FROM THE MOUND CREATED BY A LINE SOURCE AND DEVELOPMENT - FOR THE MOUND CREATED BY A WIRE SOURCE OVER A PERCHING LAYER - PRINTS WERE OBTAINED - 26 PRESENT TO FT COLLINS
1/18 USBR - 8 HRS ON STRUCTURES; MR MUCKLE AT FT COLLINS WILL GIVE FIGURES ON FINANCES AND SEND THEM TO ME - WILL GO OVER DEVELOPMENT AND INDICATE WHAT IS NEEDED NEXT
1/19 WORKED 8 HRS - USBR - ON STRUCTURES
1/20 USBR - 1 HR - EVAPORATION SUPPRESSION, 7 HRS ON STRUCTURES: MR MUCKLE SAY FUNDS OK TO GO AHEAD - WILL ARRANGE FOR TWO WEEK IN FEBRUARY
1/21 SENT AN EXTRA COPY OF THE LINE SOURCE TO FT COLLINS 1/22 AT HOME - 65th BIRTHDAY
1/23 USBR - 3 HRS ON EVAPORATION SUPPRESSION, 5 HRS ON STRUCTURES 1/24 USBR - 1 HR FOR REGION 7, 7 HRS ON STRUCTURES
1/25 USBR - 3 HRS EVAPORATION SUPPRESSION, 6 HRS ON STRUCTURES 1/26 USBR - 1 HR EVAPORATION SUPPRESSION; 7 HRS ON STRUCTURES 1/27 USBR - 8 HRS ON STRUCTURES
1/30 USBR - 1 HR - EVAPORATION SUPPRESSION; 7 HRS ON STRUCTURES 1/31 USBR - 8 HRS ON STRUCTURES
2/1 WORKED 1 HR FOR A.R.S; 2/2 WILL BE SOME TIME BEFORE MY LARGE SCALE RECHARGE CAN BE DONE
2/2 A.R.S. - 4 HRS; USBR - 4 HRS FOR DRAINAGE AND GROUNDWATER UNIT 2/3 A.R.S. - 8 HRS - WORK DONE AT HOME
2/6-7 USBR - 8 HRS BOTH DAYS - WHEATLAND GW STUDY - MCDONALD'S SECTION 2/8 USBR - 8 HRS - MCDONALD’S CASES - WHEATLAND PROJECT AND SOUTH PLATTE 2/9 USBR - 2 HRS ON EVAPORATION SUPPRESSION, 6 HRS ON WHEATLAND
2/10 USBR - 4 HRS WHEATLAND PROJECT, 4 HRS ON STRUCTURES; LAST OF 4
LECTURES ON POISSON’S RATIO, ELASTICITY, TRIAL LOAD PROCEDURES, COMPUTATION OF ABUTMENT DEFORMATIONS AND TESTING ROCK FOR ELASTIC MODULES
2/13 USBR - 1 HR WHEATLAND PROJECT, 7 HRS STRUCTURES
2/15-16 WORKED 8 HRS BOTH DAYS FOR A.R.S. - WORK DONE AT HOME
2/17 USBR - 2 HRS DRAINAGE AND GW, 2 HRS FOR MCDONALD, 4 HRS STRUCTURES
2/20 USBR - 8 HRS EVAPORATIVE - REVIEW A PAPER TO COMPUTE INCREASE IN HUMIDITY AT OBSERVATION STATION IN A LAKE
2/21 USBR - 2 HRS - EVAPORATIVE SUPPRESSION, 6 HRS ON STRUCTURES, COMPLETED TEXT AT THE MEMO ON TUNNELING
2/23-24 A.R.S 8 HRS - WORKED AT HOME - MR MUCKER HAS NO OBJECTION TO SUBSTITUTING
RECTANGULAR PLOTS FOR CIRCULAR PLOTS - COULD PROBABLY PREPARE A PAPER ON GROUNDWATER MOUND UNDER A RECTANGULAR PLOT
2/27 USBR - 4 HRS - STRUCTURES, 4 HRS EVAP SUPPRESSION; 2/28 USBR - 8 HRS - STRUCTURES 3/1 USBR 8 HRS - ON STRUCTURES; 3/2 USBR - 8 HRS ON DRAINAGE AND GROUNDWATER 3/3 USBR - 6 HRS - DRAINAGE AND GROUNDWATER, 2 HRS ON STRUCTURES
3/6 USBR - 4 HRS - DRAINAGE AND GROUNDWATER, 4 HRS ON STRUCTURES
3/7 USBR - 4 HRS - STRAINAGE AND GW, 1 HR - EVAP SUPPRESSION, 3 HRS - STRUCTURES. TALKED TO R. SAILOR - TESTS ON DOUBLY REINFORCED BEAMS - INTERESTED IN RESISTANCE
3/8 USBR - 2 HRS - DRAINAGE AND GW, 4 HRS - SOUTH PLATTE, 2 HRS - STRUCTURES
3/9 USBR - 1 HR FOR REGION 7 - S PLATTE STUDIES; 7 HRS ON STRUCTURES - COMPLETED TEXT ON TUNNELS AND BEGAN REVIEW ON TESTS FOR DESIGN OF PIPE
3/10 USBR - 5 HRS STRUCTURES, 3 HRS DRAINAGE AND GW 3/13 USBR - 8 HRS FOR DRAINAGE AND GROUNDWATER
3/14 USBR - 7 HRS FOR DRAINAGE AND GW, 1 HR FOR POE ON PATENTS 3/15 USBR 8 HRS ON POE’S PATENT CORRESPONDENCE
1961 ADDENDUM
3/6 USBR - 6 HRS FOR POE’S PROBLEM, 2 HRS DRAINAGE AND GW; CALL FROM MR MUCKLE (A.R.S.) - NO WORK DONE BY ME THIS MONTH - HE WILL ASK FOR 2 WEEKS IN APRIL
3/17 USBR - 4 HRS FOR PIE, 4 HRS FOR DRAINAGE AND GW 3/20 USBR - 4 HRS FOR PIE; 4 HRS FOR DRAINAGE AND GW 3/21-22 USBR - 8 HRS - FOR DRAINAGE AND GROUNDWATER
3/23 USBR - 6 HRS - STRUCTURES, 1 HR - DRAINAGE AND GW, 1 HR EVAP SUPPRESSION 3/29 USBR - 5 HRS - STRUCTURES, 1 HR DRAINAGE AND GW
3/30 USBR - 2 HRS - DRAINAGE AND GW, 2 HRS ON STRUCTURES 3/31 USBR - 8 HRS - ON STRUCTURES
4/3 USBR - 7 HRS - REGION 7 ON S PLATTE - 1 HR ON STRUCTURES
4/4 USBR - 5 HRS - REG 7 - S PLATTE 2 HRS - EVAP SUPPRESSION, 1 HR FOR DAMS
4/5 MR JENSEN AT FT COLLINS SAYS TO GO AHEAD WITH RECTANGULAR STRIPS - RATIOS OF 1 TOI, 2 TOI, 30 TOI, WILL BE NEEDED - ANALOG WORK DISCONTINUED
4/8 8 HRS FOR A.R.S. ON RECTANGULAR PLOTS 4/10 2 HRS FOR A.R.S.
4/11 2 HRS FOR A.R.S. IN AM, 4 HRS - USBR - ON STRUCTURES
4/12 USBR - 1 HR DRAINAGE AND GW, 2 HRS - DAMS, 1 HR - STRUCTURES 4/13 8 HRS - USBR - ON STRUCTURES
4/14 4 HRS - USBR - ON STRUCTURES; 2 HRS FOR A.R.S. 4/17-19 8 HRS EACH DAY FOR A.R.S. - WORK DONE AT HOME 4/20 USBR - 8 HRS ON USES OF NUCLEAR ENERGY
4/21 8 HRS FOR A.R.S.
4/24 USBR - 6 HRS - STRUCTURES, 2 HRS - EVAPORATION SUPPRESSION - (SNOW) 4/25-29 WORKED 8 HRS EACH DAY FOR A.R.S.
4/28 6 HRS FOR A.R.S.; MR STRUKNERS CALLED FROM OAK RIDGE TODAY
5/1 USBR - 2 HRS ON STRUCTURES, 4 HRS - TIMS PROBLEM - (NUCLEAR EXPLOSIVES) 5/2-3 USBR - 8 HRS - ON TIM BLINES PROBLEM - (8 HRS EACH DAY)
5/4 8 HRS - USBR - WORK DONE FOR MCDONALD
5/5 USBR - 4 HRS - STRUCTURES, 4 HRS - TIMS PROBLEM (NUCLEAR EXPLOSIVES) 5/11 USBR - 2 HRS ON TIMS PROBLEM (NUCLEAR EXPLOSIVES), 6 HRS ON STRUCTURES 5/12 1 HR FOR A.R.S.
5/19 USBR - 2 HRS ON STRUCTURES, 1 HR ON TIM’S PROBLEM 5/22-25 WORKED 8 HRS EACH DAY FOR A.R.S.
5/26 WORKED 2 HRS FOR A.R.S. TODAY
5/31 USBR - 8 HRS ON MCDONALD’S GROUNDWATER RESEARCHES AND CORRELATIONS 6/1-2 USBR - 8 HRS - WITH MCDONALD (8 HRS BOTH DAYS)
6/5 USBR - 8 HRS - MCDONALD’S GROUP; BEGAN PREPARATION OF A MONOGRAPH ON GW 6/6 WORKED ON PAPER FOR A.A.A.S. MEETING
6/7-8 USBR - 8 HRS BOTH DAYS ON MONOGRAPH OF GROUNDWATER 6/9 WORKED 4 HRS FOR USBR - ON PREPARATION FOR FT COLLING MEETING 6/10 COMPLETED ESTIMATES FOR OAK RIDGE LAB AND SENT THEORY 6/11 WENT TO FT COLLINS BY BUS IN THE EVENING
6/12 ATTENDED ON CONCRETE RESEARCH AT FT COLLINS (MEETINGS)
6/13-14 ATTENDED MEETINGS ON CIVIL ENGINEERING RESEARCH AT FT COLLINS
MET WITH MR JENSEN AND MR TODD TO DISCUSS CORRELATION OF THEORY AND ANALYSIS OF SPREADING OF A POUND ON A IMPERMEABLE FOUNDATION JENSEN WILL SEND TODD THE PRINTS OF MY WORK
6/15 ATTENDED MEETING OF THE CIVIL ENGINEERING SYMPOSIUM AT FT COLLINS 6/16 USBR - 2 HRS ON SYMPOSIUM; 6 HRS ON MONOGRAPH
6/17 FINISHED WORK FOR OAK RIDGE AND MAILED THE MATERIAL TO THEM
6/19 USBR - 1 HR FOR ELFURT - CONCRETE RESEARCH PROBLEM, 7 HRS ON MONOGRAPH 6/20 USBR - 1 HR FOR ELFURT - CONCRETE RESEARCH, 7 HRS - PULS - CONCRETE DAMS 6/21 USBR - 4 HRS FOR CONCRETE DAMS, 4 HRS FOR MONOGRAPH
6/22 USBR - 2 HRS FOR CONCRETE DAMS, 6 HRS ON MONOGRAPH 6/26 USBR - 8 HRS ON GROUNDWATER MONOGRAPH
6/27 USBR - 1 HR FOR DRAINAGE AND GROUNDWATER, 7 HRS ON MONOGRAPH
6/29 USBR - 8 HRS ON RESEARCH (9-F801-76-30-04)
6/30 USBR - 8 HRS ON RESEARCH, MADE FIELD TRIP TO BIG DRY CREEK AREA WITH SEVERAL OTHER ENGINEERS
1961 ADDENDUM 7/3 USBR - 6 HRS WHEATLAND, 2 HRS SOUTH PLATTE 7/5 USBR - 4 HRS WHEATLAND, 4 HRS - MONOGRAPH
7/7 WORKED 8 HRS - USBR - ON WHEATLAND - CHIEF ENGINEERING GEOLOGIST FROM CALIFORNIA IN TODAY TO TALK ABOUT GROUNDWATER
7/10 USBR - 4 HRS ON WHEATLAND, 4 HRS ON MONOGRAPH 7/11 USBR - 4 HRS ON RESEARCH, 4 HRS ON MONOGRAPH 7/12 WORKED 8 HRS - USBR - ON RESEARCH
7/14 WORKED 8 HRS - USBR - ON RESEARCH
7/17 8 HRS - USBR - ON RESEARCH (MINIDOKA GROUNDWATER STORAGE)
7/18 3 HRS ON RESEARCH (MINIDOKA GW), 4 HRS REVIEW REPORT ONCE RESEARCH VISITORS IN FROM FORMOSA
7/19 USBR - 4 HRS ON CIVIL ENGINEERING RESEARCH REPORT, 4 HRS ON MONOGRAPH
7/20 USBR - 4 HRS ON CE RESEARCH REPORT, 4 HRS ON MONOGRAPH - CONFERENCE ON THE REPORT IN BLDG 56 - LEFT A REVISED COPY, TO BE COPIED AND SENT OUT TO MEMBERS OF PANEL 2
7/24-25 WORKED 8 HRS - USBR - ON THE MONOGRAPH (8 HRS BOTH DAYS) 7/26 USBR - 4 HRS ON THE MONOGRAPH, 4 HRS ON CACHUMA
7/27-28 WORKED 8 HRS BOTH DAYS - USBR ON CACHUMA EVAPORATION 7/31-8/3 WORKED 8 HRS EACH DAY - USBR - ON CACHUMA EVAPORATION 8/4 USBR - 6 HRS ON CACHUMA, 2 HRS ON MONOGRAPH
8/7-8 USBR - 8 HRS BOTH DAYS ON MONOGRAPH ON GROUNDWATER
8/9 USBR - 4 HRS ON THE MONOGRAPH, 4 HRS ON EVAPORATION SUPPRESSION (CACHUMA) 8/10 USBR - 3 HRS ON CACHUMA, 5 HRS ON MONOGRAPH
8/11 USBR - 1 HR ON CACHUMA, 3 HRS ON MONOGRAPH 8/14 USBR - 8 HRS ON GROUNDWATER MONOGRAPH
8/15 USBR - 6 HRS ON MONOGRAPH, 1 HR MINIDOKA (MCDONALD), 1 HR - S. PLATTE - D. ROUT 8/16 USBR - 7 HRS ON CACHUMA, 1 HR ON SOUTH PLATTE
8/17-18 WORKED 8 HRS BOTH DAYS ON CACHUMA
8/18 CALL FROM DAVID WILLIS OF UNION CARBIDE OF OAK RIDGE TENNESSEE ORDER #, WORK SPECIFICATIONS - WORK CAN BEGIN NOW - TABULATE AND PLOT ON LOG-LOG PAPERPRICE $250 8/21 USBR - 4 HRS ON CACHUMA, WORKED ON UNION CARBIDE COMPUTATIONS IN PM
8/22-23 BOTH DAYS WORKED ON COMPUTATIONS FOR UNION CARBIDE 8/24 WORKED ALL DAY FOR USBR ON CACHUMA
8/25 AT HOME - WORKED ON UNION CARBIDE COMPUTATIONS
8/27 WENT WITH JOHN SPENCER TO REMOTE OUTFITTERS CAMP AT DICKINSON, WYO 8/28 RODE WITH PACK TRAIN TO FIRST CAMP ON TRIP INTO POP AGIE WILDERNESS AREA
8/29 MADE TRIP TO ‘ICE LAKES’ AND RETURN TO FIRST CAMP 8/30 BROKE CAMP AND RODE TO WAKASHIE CAMPGROUND
8/31 RODE TO WAKASHIE LAKE TO TAKE PICTURES - PM RETURNED TO WAKASHIE CAMP 9/1 IN WAKASHIE CAMP ALL DAY BECAUSE OF RAIN, WIND, SLEET AND SNOW
9/2 RODE TO SOUTH FORK LAKE IN THE MORNING, IN THE AFTERNOON BROKE CAMP AND RODE BACK TO REMOTE OUTFITTERS CAMP AT DICKINSON PARK - IN THE EVENING WENT WITH JOHN SPENCER TO LAUDER AND RIVERTON -SPENT THE NIGHT IN A MOTEL IN RIVERTON
9/3 RETURNED TO DENVER WITH JOHN SPENCER IN HIS CAR
9/5 WORKED ON UNION CARBIDE (OAK RIDGE) COMPUTATIONS IN THE AFTERNOON
9/6 USBR - 2 HRS ON CACHUMA, 1 HR ON SALINE WATER - IN THE AFTERNOON - HELPED JOHN SPENCER AND DON YOUNG AT THE FEDERAL CENTER TO DRAFT A REPORT ON THE POPO AGIE AREA - (WORK NOT CHARGED TO BUREAU TIME; DISCUSSED DEMINERALIZATION POSSIBILITIES SBY NATURAL FREEZING IN THE WATER WITH DANIELS - CITED SHADEHILL RESULTS
9/7 WORKED ON OAK RIDGE COMPUTATIONS AT HOME - COMPLETED COMPUTATIONS 9/8 USBR - 7 HRS FOR MCDONALD ON MONOGRAPH, 1 HR ON EVAPORATION SUPPRESSION 9/9 BOUGHT A BUSHNELL TELEPHOTO ATTACHMENT
9/11 USBR - 7 HRS ON THE MONOGRAPH; 9/12 USBR - 8 HRS ON THE MONOGRAPH
9/13 USBR - 4 HRS ON MONOGRAPH, 1 HR ON DAMS, 3 HRS - MR NEDDY’S OF COMPUTATIONS OF GROUNDWATER MOVEMENTS - MR BITTINGER AND MR NEDDY DOWN FROM FT COLLINS
9/14-15 WORKED 8 HRS - USBR (BOTH DAYS) ON THE MONOGRAPH, L. PULS LAST DAY IN THE OFFICE 9/19 USBR - 2 HRS IN THE AFTERNOON ON THE MONOGRAPH
9/20 USBR - 7 HRS ON CACHUMA EVAPORATION SUPPRESSION - TOOK PICTURE OF POPO AGIE CARTOONS IN THE REGION 7 OFFICE
9/21 USBR - 8 HRS ON CACHUMA EVAPORATION SUPPRESSION 9/22 AT HOME - WORKED ON PAPER ON PARALLEL DRAINS
9/25 USBR - 8 HRS ON CACHUMA; 9/26 USBR - 7 HRS ON CACHUMA
9/27 USBR - 5 HRS - CACHUMA, 3 HRS - DRAINAGE AND GROUNDWATER, #22-4405-0-0-1, 6S5CTR 700 9/28 USBR - 5 HRS ON CACHUMA, 3 HRS - MORRIS SKINNER FROM CSU
9/29 USBR - 8 HRS ON CACHUMA
1961 ADDENDUM 10/2-4 USBR - 8 HRS (EACH DAY) ON CACHUMA
10/5-6 AT HOME TO WORK ON P.C.A. JOB
10/7 COMPLETED P.C.A. WORK AND SENT 2 COPIES OF REPORT BY AIRMAIL 10/9 USBR - 8 HRS ON CACHUMA
10/10 USBR - 4 HRS ON CACHUMA
10/11 USBR - 8 HRS ON MR MALETICS WORK
10/12-13 USBR - 8 HRS ON MR MALETICS WORK - BAFFIN’S BAY SOILS PROBLEM (8 HRS [illegible]) 10/16 USBR - 4 HRS ON CACHUMA, 4 HRS ON TEXAS BASIN
10/18 USBR - 3 HRS ON CACHUMA; 5 HRS ON TEXAS BASIN 10/19-20 USBR - TEXAS BASIN
10/24-29 THESE DAYS SPENT AT OAK RIDGE WITH UNION CARBIDE
10/30 USBR - 2 HRS ON CACHUMA, 1 HR ON TEXAS BASIN; AFTERNOON AT HOME - CORRESPONDENCE 10/31-11/1 USBR - 8 HRS (EACH DAY) ON CACHUMA
11/2 NO WORK AT US BUREAU OF RECLAMATION 11/3 USBR - 8 HRS ON CACHUMA
11/6 USBR - 6 HRS ON CACHUMA, 2 HRS ON YUMA #3-423-00-05-01
11/7 USBR - 3 HRS ON YUMA RESERVOIR (POWELL LAKE), 5 HRS CACHUMA - DISCUSSION ABOUT GLEN CANYON EVAPORATION
11/8-9 USBR - 8 HRS BOTH DAYS ON CACHUMA
11/13 USBR - 2 HRS ON GLEN CANYON DAM, 6 HRS ON CACHUMA
11/14 USBR - 3 HRS ON GLEN CANYONS, 5 HRS ON CACHUMA - CONFERENCE ON WAYS AND MEANS OF STOPPING CRACKING OF CONCRETE IN THE BLOCKS AT GLEN CANYON DAM - I SUGGESTED LOOPING UP THE CONNECTIONS TO START COOLING WITH WARMER WATER - THEY SUGGEST A 2-5 STAGE
PROCEDURE - THIS IS TO BE TRIED
11/15 USBR - 2 HRS ON YUMA, 6 HRS ON CACHUMA - MET MR MCGOWAN - OFF. OF SALINE WATER 11/16 USBR - 3 HRS ON YUMA, 5 HRS ON CACHUMA
11/17 USBR - 1 HR ON YUMA, 7 HRS ON CACHUMA 11/20 USBR - 1 HR ON YUMA, 7 HRS ON CACHUMA
11/21 USBR - 8 HRS ON CACHUMA - IN THE EVENING, ATTENDED A LECTURE AT MONTVIEW PRESBYTERIAN CHURCH - DR HAGER SHOWED SLIDES OF THE CANYON DE CHELLY AREA (NOTE - DR HAGER AND DAD GREW UP IN ORD, NEBRASKA)
11/22 USBR - 8 HRS ON CACHUMA
11/24 NO WORK - BOUGHT A TEXT BY MILL ON PLASTICITY
11/25 SENT REVIEW OF A PAPER IN “ANALOG MODELS FOR FLOOD CONTROL SYSTEMS” BY J.A. HARDER TO A.S.C.E.
11/27 USBR - 6 HRS ON YUMA; 2 HRS ON CACHUMA 11/28 USBR - 8 HRS ON YUMA
11/30 USBR - 8 HRS ON YUMA FIRST READING OF DRAW - DOWNS DUET TO PUMPING OBTAINED FROM THE ANALOG TODAY - CALLED SKINNER AT CSU
12/1 USBR - 4 HRS ON CACHUMA, 4 HRS ON YUMA 12/4 USBR - 4 HRS ON CACHUMA, 4 HRS ON YUMA 12/5 USBR - 2 HRS ON YUMA, 6 HRS ON CACHUMA
12/6 USBR - 4 HRS ON CACHUMA, 1 HR ON YUMA - MORRIS SKINNER CAME DOWN FROM CSU TODAY TO MAKE FINAL ARRANGEMENT FOR PRESENTATION OF THE PAPER ON “GROUNDWATER RESERVOIRS OCCUPYING A TRENCH”
12/7 USBR - 5 HRS ON CACHUMA, 3 HRS ON YUMA - REPRESENTATIVES FROM BOULDER CITY IN TO LOOK AT YUMA ANALOG; PROPOSED CONTRACT WITH UNION CARBIDE AND LETTER FROM USGS DISCUSSED WITH CHIEF ENGINEER - NATURE OF WORK WAS DESCRIBE TO THEM - THEY SAW NO CONFLICT WITH LAWS AND REGULATIONS
12/11 USBR - 3 HRS ON YUMA, 5 HRS ON CACHUMA
12/12 AT HOME - WORKED ON PAPER “PARALLEL DRAINS FROM THE LA PLACE STANDPOINT” TO TAKE TO FORT COLLINS
12/13 USBR - 8 HRS ON YUMA
12/14 WENT TO FT COLLINS ON THE BUS ATTENDED SEMINAR ON MANAGEMENT OF GROUNDWATER RESERVOIRS - MR SKINNER MADE A PRESENTATION; PROF BENDER SAYS GW COURSE WILL PROBABLY BE OFFERED IN THE SPRING QUARTER. LEFT MY PAPER ON “PARALLEL DRAINS…” FOR DR CHAMBERLAIN - BUS TO DENVER, EXP 6.29
12/15 USBR - 3 HRS ON BOISE; 5 HRS ON YUMA 12/19 USBR - 6 HRS ON YUMA; 2 HRS ON CACHUMA 12/21 USBR - 1 HR ON CACHUMA, 7 HRS ON YUMA 12/22 USBR - 8 HRS ON YUMA
12/25 HOME FOR CHRISTMAS HOLIDAY 12/26 USBR - 8 HRS ON YUMA
12/27 USBR - 2 HR ON YUMA, 6 HRS ON DRAINAGE AND GW (*9-9321-0-0-1, COST CENTER 700) 12/28 USBR - 8 HRS ON TEXAS BASIN (*5-A824-73-10-01-COST CENTER 250) - DARS WANT LAND AND I TALKED WITH PARMAKIAN ABOUT GETTING SOME RESEARCH DONE ON THE IDEA OF EXPLORING ABUTMENT FOR PANELS BY USE OF SONIC METHODS
12/29-30 ATTENDED A.A.A.S MEETING AT THE HILTON HOTEL - PAPER BY GLOVER AND SKINNER PRESENTED BY SKINNER
Thursday, February 9, 1961 40th Day-325 days to follow
Worked 8 hours for the Bureau of Reclamation. 2 hrs on evaporation suppression. 6 hr on Wheatland R.E.G
Friday, February 10, 1961 41st Day-324 days to follow
Worked 8 hours for the Bureau of Reclamation 4 hrs on Wheatland proj 4 hr on structures REG Feb 12 1961
Last of 4 lectures on Poisson’s ratio, Elasticity, Trial Load procedures, Computation of abutment deformation, and testing of rock for Elastic Modules
REG Feb 13 1961
Wednesday, March 7, 1961 66th Day-299 days to follow
Worked 8 hours for the Bureau of Reclamation 4 hr Drainage and G.W. 1 hr evaporation suppression 3 hr structures
REG
Talked to R. Saulor about the tests in doubly reinforced beams. He is interested in their [illegible]. REG
Wednesday, March 8, 1961 67th Day-298 days to follow
Worked 8 hours for the Bureau of Reclamation 2 hrs for drainage AND G.W. 4 hr for South Platte 2 hr for structures
R.E.G.
Present at Conference. Joe Barrett Area Engr Denver Development Office. Ed Holland.’ Lou Cummings Leo Gamble Jean Jareki Al Christiansen Bob Madsen Daill Raitt
R.E.G. Mar 28 1961
Monday, March 13, 1961 72nd Day-193 days to follow
Worked 8 hours for the Bureau of Reclamation 8 hours for Drainage and Groundwater. R.E.G. Mar 14 1961
Tuesday, March 14, 1961 73rd Day-292 days to follow
Worked 8 hours for the Bureau of Reclamation 7 hrs for Drainage & G.W. 1 hr for Poe on [illegible] R.E.G.
Job No For Poe. 23-5502-0-0-3
Tuesday, May 30, 1961 150th Day-215 days to follow
Memorial Day Holiday. At home at 1936 So Lincoln St Denver. R.E.G
Wednesday, May 31, 1961 151st Day-214 days to follow
Worked 8 hours for The Bureau of Reclamation on McDonald’s groundwater researches & correlations R.E.G.
Willis can probably come on this day R.E.G. June 10 1961
Friday, August 18, 1961 230th Day-135 days to follow Worked 8 hours for do Bureau of Reclamation on Cachuma R.E.G
Call from David Willis Union Carbide on Oak Ridge Tennessee. Order 76X-73612 [illegible] D 1732 will be sent for x/L values 025.05 0.2 0.4 5. 10. 20840. work can begin now. Price $250. Tribute 8 plot on log-log paper
R.E.G.
Suggestion on [illegible] integrator sent on today from [illegible] office. R.E.G.
Saturday, August 19, 1961 231st Day-134 days to follow
At home at 1936 So Lincoln St Denver. Land file in Ginger’s room in the morning. Mowed the lawn in the afternoon. R.E.G. Aug 21 1961
Thursday, December 14, 1961 348th Day-17 days to follow
Went to Fort Collins on the bus in the morning to attend seminar on management of ground water reservoirs Mr M. Skinner made presentation Prof Bender says the Ground water course will probably be open for the spring quarter. Saw Mr Code, and Ed Schulz. Left paper on “Parallel Drain from the Laplace Standpoint” with Norm Evans to transmit to Dr. Chamberlain Returned on bus in the evening
R.E.G.
Taxi fare $2.00 RT fare $4.19
Friday, December 15, 1961 349th Day-16 days to follow Worked 8 hr for The Bureau of Reclamation 3 hr Boise 5 hr Yuma REG
Thursday, December 28, 1961 362nd Day-3 days to follow Worked 8 hour for The Bureau of Reclamation on Texas Basin REG
Texas Basin 5-A824-73-10-01 Cost Center 250
Dart Wantland and I talked with [Parmalee] today about getting some research done on the idea of exploring [illegible] for [illegible] by use of Some methods
R.E.G
Friday, December 29, 1961 363rd Day-2 days to follow Attended A.A.A.S meetings at the Hilton Hotel
REG Dec 31 1961 Cash Account-December Reply codes Price 290 Timblin 295 Garrtlea 295 Cohan 295 Holland 295 Telephone Numbers Mr Dean Muckel at Ft Collins. Huntes-2-5272
McDonald Cast counter number is 242. ShelbyForman
Olga Zajae 465 Bldg 53 Room 15
Timbline cast counter 825 (Physical Investigations) Dams
22-4400-0-0-1 Cost center 300
22-4405-0-0-1
Addresses Monographs 22-4404-0-0-5
Research 9-F801-76-30-04 Narrows unit (So Platte) Ok 7B-553-74-30-02 [illegible] 9-F885-02-24-01 South Platte. 7B-553-47-30-02 [illegible] Research
Civil Eng Research report 22-4403-0-0-3 (Fort Collins work) Cachuma Saline water. 9-800-0-1-4
Memoranda Yuma analog study
3-423-00-05-01 Glen Canyon Evap 4-G557-01-01-01 Schultz [illegible] 321 Glen Canyon Dam 4-G557-1-1-1 Cachuma 9-9304-0-0-11 Drainage & G.W. Development 9-9321-0-0-1. Cost center 700 END TRANSCRIPTION