I
,.
-5
EP
~ l1
97
9
t ,.~ .i \,.f I .Ji '\l'O r! .('N 96TH CONGRESSH. R.
5199~ T LJ' ·- .:.-:-· .. u. 'H 1ST SESSlONTo authorize certAin lldditional measures to assure accomplisbment o£ the objec-tiles of title
n
of the Colorado Riwr Busin Salinity <'ontrol .\ct, ~nd to increase the autl:orized CX)ll'llditures ('citing for the rar~do' Yal!,·y S:>linity Control Unit, Colorado, and for other purposes.IN THE HOUSE OF REPRESENTATIVES
SEPTEMBER 6, l!li9
llr. JOHNSON of Colorado (for himself anJ Mr. KoGO\'S£K) intt·oduced the
following bill; which was referred to the Committee on Interior and Insular Affairs
A BILL
To authorize certain additional measures to as~urc aceo;nplish-ment of the objectives of title II of the Colorado Iliver
Basin Salinity Control Act, and to increase the authorized expenditures ceiling for the Paradox Valley Salinity Control Unit, Colorado, and for other purposes.
1
Be it
enacted
by the
Senate
and House
of
Rcprcsenta-2
tives of the
United
States
of
America in
Congress assembled,
3 That the Act of June 24, 1974 (88 Stat. 266), the Colorado 4 River Basin Salinity Control Act, is hereby amended as 5 follows:
1 SEC. I. (a) After the word "units" in the first sentence
'> of section 202, insert a comma followed by the phrase,
"in-3 eluding measures to mitigate losses of habitats for fish and
4 wildlife related thereto,".
5 (b) After the first sentence of paragr~ph (2) of section
6 202 insert the following four sentences:
7 "Construction shall be limited to stage ont> de,·elopment
8 m substantial accordance "ith the engineering plans
de-9 scribed in the report by the Secretary entitled 'Colorado
10 Rivrr Basin Salinity Control Project, Stage One
Dcvelop-11 mcnt, Grand Vallry Unit, Special Report, Septrmber 1979'.
I 2 lnvt>stigatioo of the remaining facilities of the Grand \'alley
13 Unit shall continue conrurreotly with ronstruc·tion of stnge
14 one. Prior to tho construction of any remaining facilities of
I 5 thr Grand \'alley Unit the Secretary shall as~ess the
eiTec-lG tivcncss of stage one in reducing salinity of the waters of the
17 Colorado River. Recommendations of the Secretary to the
I 8 Congress pertaining to the construction of salinity control
19 facilities of stages of the Orand Valley Unit subsequent to
20 sh1ge one ~hall be based upon findings from his assessment of
21 stagcone.".
22 (c) In the second srntence of parngraph (:2) of srction
23 202, after the comma following the cbtN.', ":\h•asure~ ~hall
24 include lining of canals and latrrals," insert the phrase,
•
.
•
3
1 SEC. 2. (a) After the figure $125,100,000 in tiH' srcood
2 sentence of paragraph (b) of section 208, inscrt a comtna
fol-3 lowed by, "to include $16,000,000 for the T'nr:Hlox Valley
4 Unit, $59,000,000 for the Grand Valle~· Unit, $.")00,000 for
5 the Crystal Geyser Unit, and $49,600,000 for tlw Las Yegas
6 Wnsh Unit,".
7 (b) Following the p(•riod after the word "works" at the
8 end of the second sentrnce in paragraph (h) of srction 208
9 insert the following pro\i~o: "Prot"idcd, Thnt the
appropri-10 ations for the Paradox Ynlley Unit are hereby authorized to
11 be increased to $57,900,000 (bused oo January 1 !)7!) prices)
12 plt.s or minus such amounts as may be ju'>tifit•d by reason of
13 ordinary fluctuation in con.,truction costs involved therein,
14 and such
sums
as may be required to opcratr uml muiotnin15 such works.".