AGENDA

The online meeting: COVID-19 situation and it´s affecting on the project work plan

Date: 17 April 2020, 13.00 ( Swedish time) Place, address: ZOOM room

Zoom link https://lnu-se.zoom.us/j/519833768

For an effective meeting, please be on time that it will be “really” starting at 13:00!

13.00-13.10 Welcome, by William Hogland, LNU

Realization of the project application content

13.10-13.30 COVID-19 affects on project performance, by all partners

Where are we now? Briefly information (approx. 3 min per partner)

- LNU, Kalmar, Sweden - NSR , Helsingborg, Sweden

- Gdansk University and Waste Management Company, Poland - Lithuanian Research Center for Agriculture and Forestry and

Klaipeda University, Klaipeda, Lithuania

- Water, waste management and district heating company in Hässleholm, Sweden

13.30-14.45

14.45-15.00 15.00-16.00

Work plan

1. WP1-2, by LP

- Existing 2020 work plan review (meetings/workshop –when should they be posted)

- Webpage, BOX

- Discussion: project tracking, time schedule, implementation the project activities

2. Workshop 6-7 May, by Gdansk University

- Status of workshop agenda ( communication with all partners) - Collaboration between Industry and University/ courses etc.

- What is the performance strategy (videos/zoom/ interviews etc) for the workshop?

3. Effective performance of the following issues below, by PPs (approx.3 min, use power point)

- Field studies

- Education and courses - Dissemination

Break

SL report , by LP

1. Report

2.

Budget: reallocation/ shared cost

Future work

- Creation of BAPR manual / handbook

Summary of the day, by William Hogland, LNU

References

Related documents

In order to become certificated to ISO a company has to spot important environmental considerations of the business activities, furthermore objectives and strategies

Customer Attitude towards customisation Costs Knowledge Process design Time User needs Consultant Attitude towards customisation Customisation possibility Knowledge

The policy generation process in Södertälje on private garden soil sealing indicates how the problem recognition sometime is central to which type of policies that are considered

Quotes from operator 1 Task: Make an operator note on a process object – ”Good with pictures along with the notes!” – ”You should be able to manually set the timestamp on a

among the major activities in 2007 of these inter-weaving projects, in addition to individual field-based research, have been: (for the Zimbabwe-specific project) the running of

- Existing 2020 work plan review (meetings/workshop –when should they be posted).. -

Due to the fact that the auditors are responsible for the whole audit, including the IT-audit, it can be argued that the auditors have lost some control over the audit process

Problem description for the current water treatment plant The existing water treatment plant is situated at the Sjöudden district in the western part of Växjö at the south bank